6h Air Cargo 4 Maintenance Presentation
Item No. 6h_supp Meeting Date: November 12, 2019 Air Cargo 4 Maintenance Building Upgrade Project CIP# C800924 Project Location Concourse C North Satellite Air Cargo 4 2 Air Cargo 4 Maintenance Facility 3 Project Scope Facility Upgrades: Add/upgrade HVAC in two highly used spaces Replace approximately 190 fluorescent light fixtures with new 2x4 LED fixtures Installation of new daylight harvesting and occupancy sensors Replacement of approximately 5,000 sf of acoustical ceiling grid Installation of new exhaust fans & hood vent in breakroom. Communications and Connectivity Infrastructure Upgrades: New/additional fiber optic and copper cabling Installation of 27 new WAP (Wireless Access Point) units. Installation of approximately 50 new telephone/data wall units 4 Facility Upgrades: New and Replacement HVAC Systems Remove window unit and install new HVAC system 5 Facility Upgrades: New LED Lighting and Ventilation Replace fluorescent lighting with new energy efficient LED fixtures Install new exhaust fan and hood vent 6 Connectivity & Communication Infrastructure Upgrades Add power & communication outlets Loose Cabling 7 Project Schedule & Budget Commission Authorization Q3 - 2020 for Construction Construction Start Q4 - 2020 Construction Complete Q1 - 2022 Total Project Budget $3,000,000 8
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.