Architectural and Engineering Consultant Rates Operational Audit

INTERNAL AUDIT REPORT 
Operational Audit 
Architectural & Engineering Consultant Rates 

January 2017  September 2019 

Issue Date: December 9, 2019 
Report No. 2019-11 




INTERNAL AUDIT

Architectural & Engineering Consultant Rates 

TABLE OF CONTENTS 

Executive Summary ................................................................................................................................................ 3 
Background ............................................................................................................................................................. 4 
Audit Scope and Methodology ............................................................................................................................... 5 
Schedule of Findings and Recommendations ....................................................................................................... 6 
Appendix A: Risk Ratings ..................................................................................................................................... 10 














2

Architectural & Engineering Consultant Rates 
Executive Summary 
Internal Audit (IA) completed an audit of the process to establish Architectural & Engineering (A&E)
Consultant Rates for the period January 2017 through September 2019. The objective of the audit was
to evaluate the effectiveness of internal controls. To provide context and perspective, this report explicitly
references  when  assumptions  were  applied.  Otherwise,  the  basis  for  our  conclusions  and
recommendations was derived using data provided by management. 
A&E costs will most likely increase as the Port embarks on a series of capital projects over the next ten
years and account for approximately 10-20 percent of capital costs. The Port's 2020 approved five-year
capital plan is $3.6 billion, underscoring the importance of having established systems and controlled
processes, guided by effective oversight. It also highlights the need to improve efficiencies. 
Management self-identified the need to improve efficiency by decreasing the time to negotiate A&E
contracts.  Therefore,  we  did  not  perform  testing  to  assess  efficiencies.  Nonetheless,  Central
Procurement Office (CPO) management needs to make data-based decisions and overlay those
decisions with input from non-management staff who have deep knowledge and can provide valuable
suggestions for process improvement. 
Our audit identified four issues, which if addressed and implemented, will mitigate risk, and as a
byproduct, may improve efficiency. 
1.    High  CPO had not established guidelines for what is determined fair and reasonable. Our testing
of over 400 A&E consultants identified many instances where profit margins exceed what the
industry deemed reasonable. 
2.    High  Management approval was not required when hourly rates exceeded the maximum rates
produced by the service rate negotiation tool / model. 
3.    High  A reconciliation between the final negotiated rates and the contract did not occur. As a result,
we were unable to verify that all positions and rates reflected in the contract were accurate. 
4.    Medium  CPO is responsible for procuring all contracts related to public works, consulting services,
and goods and services. Governance meetings, for Executive Leadership Team (ELT) oversight of
CPO, had not occurred since December 7, 2017. 
These issues are discussed in more detail beginning on page six of this report. 


Glenn Fernandes, CPA 
Director, Internal Audit 


Responsible Management Team 
Dave Soike, Chief Operating Officer 
Nora Huey, Director, Central Procurement Office 

3

Architectural & Engineering Consultant Rates 
Background 
A&E costs will most likely increase as the Port embarks on a series of capital projects over the next ten
years and account for approximately 10-20 percent of capital costs. The Port's 2020 approved five-year
capital plan, including the Port of Seattle's portion of the Northwest Seaport Alliance (NWSA) capital
costs, is $3.6 billion. While this number includes $300 million for the Sustainable Airport Master Plan's
(SAMP) design costs, it does not include SAMP capital costs which will be approved and overlaid at a
later date. This underscores the importance of having established systems and controlled processes,
guided by effective oversight. It also highlights the need to improve efficiencies. 
The Port has several capital projects in process and has numerous others that will be launched in the
near future. In many cases, the Port will contract with Architects and Engineers to perform services
related to these projects. Projects range from larger projects, such as architectural design services for
the North Satellite, to medium and smaller sized projects such as the airport Service Tunnel and the
Concourse D Hardstand Holdroom, respectively. 
RCW 39.80.050 states: "The agency shall negotiate a contract with the most qualified firm for
architectural and engineering services at a price which the agency determines is fair and reasonable.".
It also states: "If the agency is unable to negotiate a satisfactory contract with the firm selected at a price
the agency determines to be fair and reasonable, negotiations with that firm shall be formally terminated
and the agency shall select other firms." 
In 2016 the Boston Consulting Group (BCG) was engaged at a contract value of $4 million as part of the 
Procurement Excellence initiative. BCG's overall project objectives included the following: 
Faster speed to delivery in the procurement process 
Improved capabilities of internal Port staff 
Making the Port an easier partner with whom to do business 
Stronger strategic partnerships with our key internal and external customers 
Improved ability to support our small business and minority, women, and disadvantaged
business (MWDBE) community 
Improved ability to support our environmental objectives in the procurement process 
As part of this initiative, the BCG working team developed a refreshed process and tool for A&E rate
setting. This was driven in part by a call to action driven by internal frustration (e.g. lengthy resume
reviews) and external frustration (confusion over benchmarks, inconsistency). This team conducted
internal interviews, market research of A&E firms, and interviewed six peer public agencies in Seattle.
The team relayed that they will still be negotiating billing rates but will focus on expedited and
synchronized negotiations. Two of the key tenets of the new process included the following: Requesting
Department Representatives (RDR) be involved upfront and play a greater role to act as "One Port" (e.g.
CPO was to lay out a negotiation strategy and solicit feedback from the RDR before engaging) and rates
analysis was to be grounded firmly in market data, with a consistent process. 




4

Architectural & Engineering Consultant Rates 
Audit Scope and Methodology 
We conducted the engagement in accordance with Generally Accepted Government Auditing Standards
and the International Standards for the Professional Practice of Internal Auditing. Those standards
require that we plan and conduct an engagement to obtain sufficient, appropriate evidence to provide a
reasonable basis for our findings and conclusions based on our engagement objectives. We believe that
the evidence obtained provides a reasonable basis for our findings and conclusions based on our
engagement objectives. 
The period audited was January 2017 through September 2019 and included the following procedures: 
Determine if risks have been identified and controls have been implemented 
Interviewed Port management and staff to obtain an understanding of the rate negotiation
process. 
Reviewed agreements and exhibits related to the contract. 
Identified and tested the design and operating effectiveness of internal controls. 
Obtained negotiated rates and judgmentally selected a sample of consultants to determine if
finalized rates were within the rate range as outlined by the Planning and Analytics team. 
Determine if contract positions and rates are accurate and complete 
Compared finalized negotiated positions and rates to selected contracts. 
Determine consultant profit 
Obtained direct labor rates and WSDOT approved overhead rates from consulting firms for
individual consultants that were agreed upon by the Port through the rate negotiation process. 
Calculated individual consultant profit margin for consultants on selected contracts. 










5

Architectural & Engineering Consultant Rates 
Schedule of Findings and Recommendations 
1) Rating: High 
CPO had not established guidelines for what is determined fair and reasonable. Our testing of
over 400 A&E consultants identified many instances where profit margins exceed what the
industry deemed reasonable. 
We evaluated profitability by subtracting actual direct labor and the applied overhead rate, from the
agreed upon negotiated rate for over 400 A&E consultants from 33 firms. We used the approved
WSDOT overhead rate if one was available. If one was not available, we used the Safe Harbor Indirect
Cost Rate. The Safe Harbor rate provides eligible firms, who opt to use this program, with an indirect
cost rate (ICR) for use in the billing rates until they have developed their own ICR. 
According to the State Auditors Report on the Columbia River Crossing Project, dated April 14, 2014: 
"Industry sources indicate you must consider a firm's overhead rate before you can determine the profit
markup you are paying. Consistent with this standard, most state transportation departments typically
pay a 10 percent to 12 percent consultant markup on labor and overhead." The report also references
a maximum rate used by the Federal Highway Administration of 15 percent. 
The Port's Rate Negotiation Rate Tool uses a targeted profit of 10 percent of each negotiated position.
However, based on our testing, rates were agreed to with profit margins that far exceeded these
margins. 
For example, we calculated profit margins that exceeded 20 percent for 187 negotiated positions.
However, we also identified 139 positions where the profit margins were less than 10%. Risk increases 
when disparate profit ranges in each position exist. This is because profit can be manipulated by how
many hours the A&E firm uses the individual. For example, an individual who has a 50% profit margin
could be used significantly more, than an individual who has a profit margin of 6%. 
Profit                       10% and below    11-19%    20-29%    30-39%    40-49%    Above 50% 
Number of Consultants         139            81        79        60        30          18 
Internal Audit is not offering or defining a fair and reasonable rate as required by RCW 39.80.050. Rather
we believe ELT management should determine what constitutes fair and reasonable, and CPO
management should build efficient processes and risk mitigating controls to minimize agreeing to rates
that exceed fair and reasonable. 
We also recognize that models inherently contain imprecision and therefore there may be times when
management determines it is necessary to override the model results. When those instances occur, they
should be decided at the appropriate level (i.e. director or COO), documented to provide the rationale,
and disclosed to the Procurement Council. 
Recommendation: 
The Procurement Council should determine what the Port deems a fair and reasonable rate and should
document the rationale for transparency. 
CPO should engage a third party to perform an independent model validation of the rate tool so that
management can gain confidence that the model produces accurate market rates. 
Management Response/Action Plan: 
Forthcoming 
DUE DATE: TBD 
6

Architectural & Engineering Consultant Rates 
2) Rating: High 

Management approval was not required when hourly rates exceeded the maximum rates
produced by the service rate negotiation tool / model. 
The tool was developed by Boston Consulting and uses market data to produce a target rate and
maximum rate that is used during negotiations. According to process documents and as initially
communicated by management, management approval is required prior to the Contract Administrator
agreeing to rates that exceed the maximum rate plus 2% (maximum) produced by the model. 
However, when we requested documentation to evidence the approval, management was unable to
provide evidence and then communicated that approval was not required. 
Internal Audit reviewed 10 contracts and identified 166 positions that exceeded the maximum rate
produced by the model. 
The table below reflects the number of positions that exceeded the maximum and the amount that the
Port agreed to pay over the maximum rate for every hour worked. 

Positions             Amount over the Maximum (+2%) 
31                                    $51.05 - $175.03 
32                                    $21.20 - $48.05 
103                                    $.17 - $19.98 
166 
Recommendations: 
CPO should implement a management review process when consultant rates exceed the maximum.
This review should be documented and contain established criteria and approval thresholds (i.e. up to
20% over the maximum) for both the Services Agreement Manager and Planning and Analytics Manager
to approve. 
If the thresholds exceed their authority or if agreement cannot be reached, approval should be escalated
to the appropriate person (i.e. director, COO) for approval, as required by the authority guidelines. 
Management Response/Action Plan: 
Forthcoming 




DUE DATE: TBD 

7

Architectural & Engineering Consultant Rates 
3) Rating: High 
A reconciliation between the final negotiated rates and the contract did not occur. As a result,
we were unable to verify that all positions and rates reflected in the contract were accurate. 
After positions and rates are agreed to between the Port and the A&E firms during negotiations, they
are memorialized in an appendix within the contract. 
We were initially told by management that the agreed upon positions and rates are captured in an excel
document called the final rate negotiation spreadsheet. When management provided Internal Audit with
the final rate spreadsheet we traced the positions and rates to the contract. 
Based on our initial review of 10 contracts, we could not agree either the rate or position for 197 of 817
positions. When presented to management, it was then communicated that we should rely on the
contract as the final and accurate document. 
We provided an opportunity for management to research and provide documentation to evidence that
the contract was accurate. As a result, we reduced the exceptions by 29 for a total of 168 exceptions. 
The table below reflects the type and number of exceptions: 
Position on contract did not exist on the rate tool            108 
Rate on rate tool did not agree to the contract               40 
Position on rate tool did not exist on the contract             20 
168 
Recommendation: 
CPO should retain documentation to evidence the agreed upon rate and position. 
CPO should the use this documentation, to verify that the rates are accurately captured into the contract 
before it is executed. 
Management Response/Action Plan: 
Forthcoming 





DUE DATE: TBD 

8

Architectural & Engineering Consultant Rates 
4) Rating: Medium 
CPO is responsible for procuring all contracts related to public works, consulting services, and
goods and services. Governance meetings, for Executive Leadership Team (ELT) oversight of
CPO, had not occurred since December 7, 2017. 
With overall spending on third party suppliers expected to exceed $400 million annually, the importance
that Port Leadership must place on oversight, guidance, and support to the CPO function is critical.
Developing guidelines and criteria for procurement decisions, establishing risk tolerances, and
monitoring key metrics is information that should be discussed, reviewed, and evaluated. The
importance leadership places on governance plays a fundamental role to prudent management and
long-term success. 
In 2016, the Port hired the Boston Consulting Group (BCG), at a contract value of $4 million, to evaluate
CPO processes and to transform procurement from a compliance-based function to a core value-driven
function. On September 20, 2016, a Commission Agenda staff briefing (Item No. 7b) stressed the vital
importance of governance. The following excerpts are provided: 
"the establishment of the Procurement Council and its ELT-level membership from across the Port
signals the fundamentally cross-functional nature of procurement. This group has and will continue to
serve as a 'leadership by example' in terms of overcoming silos and operating as 'One Port'." 
"Procurement will continue to be guided and overseen by the Procurement Council, a group of ELT-level
stakeholders. This body will continue to meet beyond our engagement with BCG and will be a core
aspect of Procurement Excellence into 2017 and beyond." 
"Continued leadership and management commitment, as demonstrated by ongoing engagement in the
Procurement Council, and more importantly, by each leader holding their respective teams accountable
for engaging proactively and constructively with CPO." 
Recommendation: 
The Chief Operating Officer should lead an effort to determine the meeting frequency and information
that is deemed necessary to perform effective governance. 
We also recommend that, at a minimum, the CFO and the Port's Managing Directors of Aviation and
Maritime, attend these meetings. 
Finally, we recommend developing a charter that defines the purpose, objective, and voting rights (if
necessary) within the Governance Committee. 
Management Response/Action Plan: 
Forthcoming 



DUE DATE: TBD 

9

Architectural & Engineering Consultant Rates 
Appendix A: Risk Ratings 
Findings identified during the audit are assigned a risk rating, as outlined in the table below. Only one
of the criteria needs to be met for a finding to be rated High, Medium, or Low. Findings rated Low will be
evaluated and may or may not be reflected in the final report. 
Financial        Internal                                                     Commission/
Rating                                         Compliance        Public 
Stewardship    Controls                                              Management 
High probability for
Missing or not     Non-compliance     external audit         Requires
High         Significant       followed          with Laws, Port     issues and / or       immediate
Policies, Contracts   negative public        attention 
perception 
Potential for
Partial controls 
Partial compliance   external audit
Requires
Medium     Moderate                     with Laws, Port     issues and / or
Not functioning                                                attention 
Policies Contracts    negative public
effectively 
perception 
Functioning as
Low probability for
intended but
Mostly complies     external audit        Does not require
could be
Low        Minimal                       with Laws, Port     issues and/or       immediate
enhanced to
Policies, Contracts   negative public        attention 
improve
perception 
efficiency 











1 0

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.