6g Presentation Building 161D Modifications
Item No. 6g_supp Meeting Date: March 24, 2020 Cargo 161D Building Modifications Seattle-Tacoma International Airport March 24, 2020 Project Purpose Project purpose is to help relieve unmet demand for airside cargo handling access by re-purposing this cargo building into the AOA. 2 Project Scope Two cargo bay doors will be reconfigured into a single wide opening with new roll up door. Construction of a sloped ramp from the truck bay level to ground level to provide ground equipment access into/onto the Air Operations Area (AOA). Upgrade lighting above door opening. 3 Bays 17 and 18 to be combined into single door opening with ramp from ground level 4 Location 5 AOA Connection - completed 6 Schedule Design Complete Quarter 1, 2020 Construction PCS Quarter 2, 2020 7
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.