6b. Presentation

Service Tunnel Renewal/ Replacement Seismic Upgrades CIP 102112 1 Item No. 6b_attach Date of Meeting March 28, 2017 Service Tunnel Renewal/ Replacement Tunnel Views 2 Service Tunnel Renewal/ Replacement Project Location 3 Service Tunnel Renewal/ Replacement Project Phasing 4 Service Tunnel Renewal/ Replacement • Original work scope included the tunnel but not the Central Loading D ock area (zone 5 on map) • Seismic modeling exposed issues in the previously area • Adding this area will bring the entire tunnel up to current seismic code Scope of Work 5 Service Tunnel Renewal/ Replacement • Costs have risen: – Original authorization $27.9M – Central Loading Dock $ 3.2M – Cost escalation and $ 2.4M impact mitigation • Revised Total Cost $33.5M 6 Service Tunnel Renewal/ Replacement Loading Dock Area 7

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.