6d. Presentation

Holdroom Seating for Concourse B and C Project (C800833) Seattle - Tacoma International Airport April 11, 2017 1 Item No. 6d_Supp Meeting Date April 11, 2017 Seating Procurement Update Vitra – Meda Gate New Airport Seating Standard 2 • Gray PU Cantilevered Shells • Chrome Beam/Arms • Power Bar • 2 arms per Seat • Cupholders • Narrow Table • Heavy • Recliner option • Soft Seating • ADA Seating Procurement Update Vitra – Soft Seating New Soft Seating Options 3 Existing Conditions Damaged seating in current airport holdrooms and poor layouts that will be addressed with this project. 4 Project Area Concourses B and C will have seating replaced in all gates. The areas in orange indicate the locations. 5 Concourse B Tenants : - Delta - Frontier - Southwest Concourse C Tenant - Alaska Construction = Seating $3.0 M / Electrical $4.4 M / Other $0.6 M 6 • Capital – Design $1.2 M – Construction $8.0 M – Total $9.2 M • Expense – Regulated Materials Management $0.1 M • Total Project $9.3 M Look Ahead Schedule Early start package for C2 - C3 holdrooms in progress. 7 • Design start Q2 2017 • Q4 2017 • Electrical construction start Q2 2018 • Q4 2018 QUESTIONS 8

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.