7a. Presentation

Capital Improvement Projects First Quarter Report 2017 Commission Briefing Item No . _Supp Date: May 23, 2017 91 Capital Improvement Projects Overall Status of Projects • 91 Total Projects in report (78 CDD , 13 IC T ) • 53 Projects are within or ahead of target schedule and budget • 35 Projects have either target schedule or budget off with 7 new Reportable Variances for this Quarter. • 3 Projects have both target schedule and budget off with no new Reportable Variance for this Quarter. • 9 Projects are Substantially Complete 2 Capital projects managed by CDD and ICT CDD Projects by Status, by Quarter 2Q16 Report 3Q16 Report 4Q16 Report 1Q17 Report Series3 1 3 3 3 Series2 34 31 28 29 Series1 39 42 46 46 39 42 46 46 34 (Schedule ) 31 (Schedule ) 28 (Schedule) 27 (Schedule) 2 (Budget) 1 3 3 3 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Off Schedule and Off Schedule On Schedule 3 Target: 60% green, 40% amber, 0% red CDD Projects by Dollar Value $1.86B $610M $32M Schedule Variance - Checked Bag Recap Optimization - $445M - International Arrivals Facility – $660M - NS NSAT Renovation NSTS Lobbies - $548M - RW16C - 34C Reconstruct Design - $101M - PC Air - $55M - E. Marginal Way Grade Separation - $56M - C3 Holdroom Expansion - $5.1M - CTE HVAC/ADR Infrastructure - $6.6M - MT So Low Voltage - $20.7M Total Budget = $2.5 Major projects are green 4 • Facing risk of cost increases on N Satellite, IAF • • will be adjusted • Current program is affordable; SAMP may be constrained. Impact of project cost growth on overall program affordability 5 Aviation Project Summary • Three new project are behind schedule – Concessions Infrastructure (Airport Dining and Retail) – Delay from the issuance of Lease Group 3 – Checked Baggage Optimization – Delay in contract execution caused a one month delay for Phase 1; Subsequent Phases delayed up to four months due to a more detailed schedule analysis (All phases anticipated to complete in Q4 2023) – D6 Gate Modifications – delays in permitting, fabrication, and finish work • Two new projects are projecting budget overruns – Concourse B Holdroom – Unforeseen site conditions, added scope, and errors & omissions – Emergency Generator Controls – scope refinement and phasing has increased costs 6 5 out of a total of 63 Aviation projects Aviation Projects Substantial Completion Construction Logistics – CPL Bus Stops 7 Construction Logistics – Field Offices 9 projects reached substantial completion Aviation Projects Concourse A/B/C Carpet Replacement 8 9 projects reached substantial completion Interim Baggage – TSA Search Room Aviation Projects 2016 Fuel System Modifications 9 9 projects reached substantial completion Zone 5 Window Ticket Counter Aviation Projects C800873 - Concourse B Gate Reconfiguration 10 9 projects reached substantial completion Gate B9 PLB Gate B7 PLB Gate B7A PLB Aviation Projects Project Savings (in thousands) RW16C - 34C Design and Reconstruct $2,035 Fuel system Modifications $2,200 Concourse A, B & C Carpet Replacement $1,549 All others $1,105 Total $6,689 11 Total of $6.689M in savings returned Maritime/Economic Development Project Summary • Shilshole Tenant Service Buildings reporting a new schedule delay attributed to shift in design direction. 12 One new variance out of 15 projects Maritime/Economic Development/NWSA Projects No projects this quarter 13 No projects reached substantial completion in 1 st Quarter Information & Communication Technology Project Summary • One new schedule variance – Airport Data Network Switch Upgrade – System deployment delayed due to an unexpected firewall procurement requirement maintenance costs and maximize training benefits. 14 . 1 new variance out of a total of 13 ICT Projects

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.