8e. Presentation
Access Control in Communication Rooms
Item No. 8e_supp Meeting Date: May 14, 2024 Access Control in Communication Rooms Sharon Miick Project Manager, AV-PMG Background • Updated standards for Communication Room security adopted in 2018. • Project scope is based on a 2018 internal audit driven by Port Internal Audit department and the audit’s findings. • This project addresses communication rooms that are pre- 2018 standard and brings them up to current Port standards. 2 Project Scope • Installation of infrastructure equipment, access control devices, and surveillance equipment. • Connection to current STIA Access Control System and surveillance system. • Set-up and removal of barricades for securing the rooms during construction. 3 Authorizations and Milestones Authorizations Project Authorization Previous authorization (Design) $2,100,000 Total authorized amount (Including this request) $8,100,000 Remaining to be authorized $0 Milestone Date Design Complete Q2 2024 Construction Start Q3 2024 In-Use Date Q4 2025 4 Cone of Certainty We are here QUESTIONS? 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.