4e presentation reduced
Item No.: 4e_Supp Date: April 26, 2016 Terminal 91 South Fender Replacement Kenneth Lyles - Director, Fishing and Commercial Operations Mark Longridge Capital Project Manager Project Location South face of Pier 91 currently used for fishing vessels and barge traffic in cruise off season 2 Current Condition Current treated timber system heavily deteriorated and at the end of its service life 3 Proposed Replacement While several layouts will be considered the new system will use long lasting more environmentally friendly epoxy coated steel piles 4 Questions? 5
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.