6e supp
Item No.: 6e_supp Meeting Date: January 26, 2016 C3 Holdroom Expansion Michael Ehl, Director, Aviation Operations Sean Anderson, Program Leader, Aviation Project Management Michelle Brantley, Development Manager, Aviation Operations Recent Aircraft Gate Capacity Additions YEAR PAST IMPROVEMENTS GATE ADD 2013 Concourse B Restripe for A320-200 aircraft instead of larger aircraft mix (gate B-1) 1 2013 Concourse A add one B7572-200 and one B737-900 RON aircraft at South end, last in first 2 out (gates A-13R, A14R) 2014 2014 Concourse B Restripe for E175 regional aircraft (gate B-4) 1 2014 Concourse D Add one B737-900 RON aircraft at North end, last in first out (gate D-11R) 1 2014 North Satellite Add one B737-900 RON aircraft at gate N-10A 1 2015 Concourse C Restripe for B737-900 (gate C-3) 1 2015 South Satellite Add one Q400 (gate S-1A w/ADA ramp) 1 Modifications have been made to handle increased activity. Future Aircraft Gate Capacity Additions YEAR CURRENT PROJECTS GATE ADD 3500 sq. ft. of hold 2016 B Concourse ramp level hold room Design room for 200 pax 1600 sq. ft. of hold 2016 Gate D-6 modifications Seeking authorization for design & construction room for 170 pax 1500 sq. ft. of hold 2016 Gate C-3 passenger hold room expansion seeking authorization for design room for 160 pax 2016 South Satellite Narrow Body Additions 3 Narrow body Concourse C (gate Q17) 1 Regional Planning Analysis Concourse B (gates B1 B3) 1 Regional Additional modifications still needed to handle forecasted activity. Aircraft Gate Capacity YEAR PAST IMPROVEMENTS GATE ADD Concourse B Restripe for A320-200 aircraft instead of 2013 1 larger aircraft mix (gate B-1) 2013 Concourse A add one B7572-200 and one B737-900 RON aircraft at South end, last in first out (gates A- 2 2014 13R, A14R) Concourse B Restripe for E175 regional aircraft (gate 2014 1 B-4) Concourse D Add one B737-900 RON aircraft at North 2014 1 end, last in first out (gate D-11R) North Satellite Add one B737-900 RON aircraft at 2014 1 gate N-10A 2015 Concourse C Restripe for B737-900 (gate C-3) 1 South Satellite Add one Q400 (gate S-1A w/ADA 2015 1 ramp) C3 Holdroom C3 Holdroom Expansion
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.