Item No.: 6c_supp_a Meeting Date: December 8, 2015 International Arrivals Facility (IAF) Action Briefing December 8, 2015 Agenda Early Schematic Design Concept Target Schedule Target Budget Additional Funding Request 2 Design-Build Contract Validation GMP Development Post-GMP Period Period Period Today 4Q16 Commence Design, Develop GMP, Preliminary Construction, including Long Lead Time Item Procurement Working towards Guaranteed Maximum Price (GMP) 3 Second Contract Period GMP Development Period: Advance design to 60% level (or beyond) Preliminary construction, including the purchase of long lead-time items (e.g., steel, escalators and elevators) Negotiate Guaranteed Maximum Price (GMP) for the work (4Q16) Advance Design and Develop a Guaranteed Maximum Price (GMP) 4 Early Schematic Design Concept Established by Design-Builder 5 Early Schematic Design of Passenger Bridge 6 Bridge Alignment and Aircraft Layout Established for Target Budget 7 Target Schedule - Accepted Complete Schematic Design (30%) April 2016 Begin Subcontractor Procurement May 2016 Commence Preliminary Construction July 2016 Complete Design Development (60%) September 2016 Negotiate Guaranteed Maximum Price November 2016 Design Level - 90% May 2017 Complete Design 100% September 2017 Complete Construction 3Q19 IAF Open to International Travelers 4Q19 Design-Builder's Target Schedule Based on Validation Concept 8 Target Budget Under Negotiation Design $ Construction - Bridge $ - Sterile Corridor $ - IAF $ - Enabling Projects & Site $ WA State Tax $ Subtotal Design-Builder $ 490 Program Support $ 118 IAF Total $ 608 Design-Builder Submits Target Budget Based on Validation Concept 9 Contract Execution Timetable Total Program Port Budget Program Budget Port Program Support Authorization Target Budget Design-Builder Due Target Budget GMP 12/8/15 Procure Structural Steel & Curtain Wall Procure Escalators/Elevators Design-Builder Cash Flow Preliminary Construction Design Current Auth. 12/08/15 4Q16 4Q19 Time Contractual Commitments Cash Expenditure to Meet Commitments and Build Project Contract Execution Timetable Recommended to Take Full Advantage of Progressive Design Build 10 GMP Development Period Work Scope Design & General Conditions Preliminary Construction - Sitework/Demolition - Utilities Relocation - Foundations/Concrete/Rebar - Enabling Projects Procurement of Long Lead Items - Structural Steel - Glass/Metal Panel Curtain Wall System - Elevator , Escalator & Moving Walkways - BHS - Pre-construction & Major Equipment Purchase for Primary Sub-Contracts (Mechanical, Electrical, Low-Voltage) WA State Tax Program Support Requested Authorization Will Advance the Project and Address GMP Development Period Work Scope 11 Additional Funds Requested for the GMP Development Period of the Contract (December 2015 to 1Q17) Design Fees $ 12 Million Contractor Fees $ 21.5 Million Program Support $ 12 Million Preliminary Construction $230 Million Total New Funding $275.5 Million Prior Approvals $ 24.5 Million Total $300 Million Authorization for Funding and Approval to Commence GMP Development Period 12 Thank you 13 Target Budget Under Negotiation Design $ 41 Construction - Bridge $ 106 - Sterile Corridor $ 52 - IAF $ 212 - Enabling Projects & Site $ 36 WA State Tax $ 43 Subtotal Design-Builder $ 490 Program Support $ 118 IAF Total $ 608 Reporting Format Using Preliminary Projected Costs - Design-Builder Will Submit Target Budget Based on Validation Concept 14 Additional Funds Requested for the GMP Development Period of the Contract (December 2015 to 1Q17) Design Fees $ 12 Million Contractor Fees $ 21.5 Million Program Support $ 12 Million Total New Funding $ 45.5 Million Prior Approvals $ 24.5 Million Total $ 115.5 Million Authorization for Funding and Approval to Commence GMP Development Period 15
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.