4i south

1,260,000                                                1,270,000
Terminal 18
East Waterway
Terminal 10
West Waterway

Terminal 30


Terminal 5 CEM


Terminal 5
Terminal 102                   Terminal 104

Terminal 103
210,000                                                                                                                       210,000
Terminal 105
Terminal 106

Terminal 108

Terminal 107

Lower Duwamish Waterway

Area of Map


Terminal 115
200,000                                                                                                                       200,000
Environmental Remediation Liability Sites -
Maritime - South Properties   Figure 2 of 3
Terminal 117
Legend
Property Boundaries for Environmental
Remediation Liability Sites
ArcGIS Project File Name: Port of Seattle - Environmental Liabilities Inventory 2012
Map Date: 10/31/2012 2:45:05 PM
Map Created by: Kathy Bahnick, Port of Seattle, Seaport Environmental Program
Coordinate System: NAD 1983 StatePlane Washington North FIPS 4601 Feet
I
2,000 1,000   0       2,000      4,000
Feet
1 inch = 3,000 feet
190,000                                                                                                                       190,000
1,260,000                                                1,270,000

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.