2016 Budget Briefing 
October 13, 2015

Maritime Division 
Commercial & Recreational         Cruise & Maritime Operations 
Marinas 
Cruise 
Fishermen's Terminal              Maritime Operations (docks) 
Waterside                      Security 
Landside 
Maritime Industrial Center          Maritime Industrial 
Waterside 
Landside                        Grain Terminal 
Shilshole Bay Marina              Terminal 91 Industrial 
Waterside                      Terminal 106 East 
Landside 
Other Marinas                 Service Groups 
Bell Harbor Marina 
Harbor Island Marina                Marine Maintenance 
Environmental & Planning 
Maritime Finance 
Maritime Admin 
Due to transfer of certain staff and functions to NWSA, not all budgets are directly 
comparable 
2

2016 Budget Key Volume Assumptions 
Cruise forecasts 959,800 passengers a 7% increase
over 2015 Budget and 2015 forecast. 
Grain volume at 4.0 million metric tons equal to 2015
Budget and above 2015 forecast of 3.6 million metric
tons. 
Recreational Marina occupancy rate average of 95%
consistent with 2015 Budget and current results. 
Fishing & Commercial occupancy rates average of 82%
consistent with 2015 forecast and above 2015 Budget
of 79%. 
Commercial Building Properties target 96%+
occupancy at year-end 2016 consistent with current
results. 
3

Org Revenues By Group 
Maritime Division Only 

Incr (Decr)     Incr (Decr)
2014    2015    2015    2016   16-'15 Bud Chg  16-'15 Frcst Chg
$'s Thousands          Actual   Budget  Forecast  Budget    $ %    $ %
Revenue
Commercial & Rec Marinas    15,965   16,420   16,413   17,316    895   5.5%   902  5.5%
Grain                   3,785    5,061    4,537    5,000     (61)  -1.2%   463  10.2%
Maritime Industrial Properties     5,851    6,147    5,915    5,952     (195)  -3.2%     36   0.6%
Cruise                  12,931   14,296   14,387   15,333   1,036   7.2%   946  6.6%
Maritime Operations          4,992    5,209    5,462    5,567     357   6.9%    105   1.9%
Maintenance & Env Services      735     358     818     384     26   7.2%   (434) -53.1%
Total Revenue          44,259   47,492   47,533   49,551   2,059   4.3%  2,017  4.2%

Increase in Commercial & Recreational Marinas reflects stable or higher occupancies and higher rates. 
Decrease in Grain and Maritime Industrial Properties is Surface Water Utility revenue which is now recognized in Stormwater Utility. 
Marine Maintenance reimbursable work expected to decrease relative to 2015 Forecast. 
Revenue increases by 4% over 2015 Budget and 2015 Forecast 
4

Org Expenses By Group 
Maritime Division Expenses Only 
Incr (Decr)        Incr (Decr)
2014    2015    2015    2016    '16-'15 Bud Chg   '16-'15 Frcst Chg
$'s Thousands          Actual   Budget  Forecast  Budget    $ %     $ %
Org Operating Expenses
Commercial & Rec Marinas      5,870    6,481    6,032    6,683    202     3%    651    11%
Grain                     106     142      69      72     (69)   -49%      4     6%
Maritime Industrial Properties      1,728     2,016     1,695     2,004     (13)    -1%     308     18%
Cruise & Maritime Operations     4,393    5,377    4,905    5,454     76     1%     548    11%
Maintenance             16,005   18,153   17,581   19,710   1,557     9%   2,129    12%
Facility/Property Maintenance        16,005     18,153     17,581     18,192       39      0%      611      3%
Stormwater Utility Assessments          0         0         0      1,518     1,518      NA     1,518      NA
Envir Services & Planning        2,817    3,350    3,433    2,587    (763)   -23%    (846)   -25%
Maritime Div Admin & Finance    1,473    1,974    1,455    1,762    (211)   -11%     308    21%
Envir Remed Exp/Other         -202     250     715     343     93    37%    (373)   -52%
Total Operating Expenses      32,190    37,743    35,885    38,615     871    2.3%   2,729    7.6%

Decrease in Environmental & Planning reflects transfer of 4 FTE's and some services to NWSA. 
Marine Maintenance will be performing stormwater pipe condition assessments for the Stormwater Utility. This is new work outside of
the scope of traditional projects. 
Commercial & Recreational Marinas reflect tenant improvements and broker fees for large space at Fishermen's Terminal Landside. 
2016 Budget reflects transfer of FTE's in Environmental, Planning and Cruise &
Maritime Operations to NWSA 
5

Full-Time Equivalents (FTEs) 
2015 Budget                                     202.8
Transfer from Engineering                                    0.5
Transfers to NWSA (Commercial Strategy, Containers, Ind Props)                -14.0
Transfers to NWSA (Env Services, Planning, Cruise Maritime Admin)               -5.0
2015 Budget Adjusted                                184.3
Changes in 2015
Staff Additions*                                              4.5
Staff Transfer                                                 1.0
Staff Reductions                                           -6.1
2015 Baseline                                     183.8
2016 Budget
Staff Reductions:
Former Director of Security Position                             (1.0)
Staff Addition:
Sr. Env Program Mgr. - Sustainability and Energy                    1.0
Net Change                                   0.0
Proposed 2016 Budget                              183.8

Note*: An additional 1 FTE was approved in 2015 for the Stormwater Utility 
Staffing is flat relative to the 2015 Adjusted Budget. 
6

Maritime Division Org Expense Budget 
Maritime Division Expenses Only 
2015      2016    Incr (Decr)
$'s Thousands                    Budget    Budget    Change    %  Explanation
Baseline Budget
Salaries                              8,694      8,515      (178)  -2.1% 5 FTE's to NWSA
Benefits                              3,339      3,405       65   2.0%
Wages & Benefits                    9,573    10,069      496   5.2% Increase in Maintenance
OPEB                     43     49     6 13.9%
Salaries & Wages to Cap, Non-op,ERL        1,676     1,598      (78)  -4.6%
Total Payroll Costs                   23,324     23,636      312   1.3%
Net Payroll Exp (net of to capital,Non-op)       21,649     22,038       390   1.8%
Utilities                                     5,667       5,538       (129)   -2.3% Primarily Stormwater
Equipment Expense                   224      295      71  31.8%
Maint Materials and Vehicle Parts            1,061      1,144       83   7.8%
Outside Services                       4,227      3,213     (1,014) -24.0% Env Srvs to NWSA, less Maint Use, Div Admin
Travel & Other Employee Exp               405       327      (78) -19.3%
Overhead to Capital                      (902)      (714)      188  -20.9%
Other O&M                      2,030     2,011     (19)  -0.9%
Total Baseline Budget                34,360    33,852     (508)  -1.5%
Initiatives
Tenant Improve, Broker Fees,Space Plan         202       319      118  58.3% Vacancies to be filled at Fishermen's Terminal
Tribal Agreements                       416        0     (416) -100.0% Now Budgeted in NWSA
Terminal 91 Maintenance Dredge            1,240       400     (840) -67.7% Project delayed and costs lower than expected
Cruise Related                           0      1,481     1,481    NA New lease agreement
Maintenance Contingency                 300      300       0   0.0%
W50 Building Demolition                   975       875     (100) -10.3% Project delayed to 2016
Stormwater Utility Work                      0      1,005     1,005    NA Stormwater Utility Line Assessments
T5, T18, T46 New Maintenance Work            0      180     180    NA
Total                           3,133     4,561     1,427  45.6%
Total Operating Expenses             37,493    38,413      919   2.5%
Envir Remediation Liability                    250       202       (48) -19.2%
7 
Total Expenses                   37,743    38,615     871   2.3%

Non-Operating Expenses 
Maritime Division Expenses Only 

$'s Thousands                                    2016
Non-Operating Expense                       Budget

Clean Air Program
Cruise (TBD)                                 $150
Street Improvement*
Cruise P66 Alaskan Way Street Improvements            $400
(additional expense to be incurred in 2017)
Non-Op Envir Remediation Liability Expense
Envir Remediation Liability - Maritime                   5,000
Total                                    $5,550

Note*: Project is under preliminary design. Expected to come forward
for Commission approval in late 2015 with completion targeted in Q1 2017.

These initiatives/projects and Environmental Remediation Liability are classified as 
Non-Operating Expenses 
8

Maritime Division Budget Summary 
Inclusive of Direct Charges & Allocations from Corporate, CDD, & Other Divisions 
Incr (Decr)      Incr (Decr)
2014   2015   2015    2016  '16-'15 Bud Chg  '16-'15 Frcst Chg
$'s Thousands                 Actual  Budget Forecast  Budget    $ %     $ %
Revenues
Operating Revenues              43,790  47,264   46,957   49,314   2,050    4%  2,357    5%
Total Revenues               43,790  47,264   46,957  49,314   2,050    4%  2,357   5.0%
Expenses
Maritime Expenses (excl env srvs)      12,187  14,184   12,241   15,456   1,271     9%   3,214    26%
Envir Services & Planning              966   1,273    1,273    1,430    157    12%    157    12%
Maintenance Expenses            8,314  10,375   10,028  10,576    201    2%   548    5%
P69 Facilities                       149     180      159     294     114    63%    135    85%
Other Econ Dev Expenses            597    651     651    588    (63)   -10%    (63)   -10%
CDD Expenses                2,390  1,819   1,756   1,769    (50)   -3%    13    1%
Police Expenses                 2,983   2,807    2,800   4,023   1,216    43%  1,223    44%
Corporate Expenses               4,647   5,144    5,038   7,865   2,721    53%  2,827    56%
Envir Remediation Liability              (378)    250      715     202     (48)   -19%    (513)   -72%
Operating Expenses            31,854  36,683   34,661  42,202   5,519    15%  7,541   22%
Net Operating Income           11,936  10,581   12,296   7,112  (3,469)   -33%  (5,184)   -42%

Net Operating Income impacted by 2016 Initiatives and increase in Corporate Allocations 
9

Maritime Division 
2016 Capital Budget 
October 13, 2015

Maritime 2016 Capital Budget 
Overall 2016-2020 dollar amount of projects at ~$112 million 
Projects support: Century Agenda Strategy: Double Economic
Value Cruise Traffic to Washington State and Asset Stewardship 
Funding capacity for projects not yet determined 
Other 
$3,557 
Fleet Repl. $4,733 
Location Breakout 
in $000s 
Contingency       FT $33,975 
$22,000

Container $2,706 
Maritime Ind Ctr
Maritime Industrial                                        $938 
Prop $1,709 
Cruise $25,628                       Shilshole Bay
Harbor Is Marina Marina $7,606                                                      Maritime
Ops/Docks $3,084                          $1,850 
BHM $3,860
Fishermen's Terminal and Cruise projects make up 30% and 23% of the total 2016-
2020 Capital Budget, respectively. 
11

Maritime 2016 Capital Budget 
Capital Budget Summary By Status 
$'s in 000's                       2016      2017      2018      2019      2020     2016-20
Commission Authorized/Underway    16,013    6,812     195     243      0   23,263
Pending 2015/2016 Authorization      3,496    4,035    4,063       0       0    11,594
Pending Future Authorization        4,011    7,470    18,858    22,843    11,380    64,562
Small Capital and Other           3,960    2,795    1,505    1,551    2,416    12,227
Total                        27,480    21,112    24,621    24,637    13,796   111,646


Overall 2016-2020 dollar amount of projects at $111.6 million 
Funding Capacity for projects not yet determined 
12

Maritime Division 
2016 Capital Budget 
Commission Authorized*/Underway 
$'s in 000's                        2016      2017      2018      2019      2020     2016-20
Pier 66 Cruise Tenant Improve Allow      12,000     1,500        0        0        0    13,500
SBM Restrooms/Service Bldgs Replace    1,805    3,366       0       0       0     5171
T91 Substation Upgrades             1,073      26       0       0       0     1099
T46 Public Access Mitigation at T117       515      513        0        0        0      1028
T18 Street Vacation Completion           200     1,150       0       0       0      1350
T5 Street Vacation Completion            140       62       0       0       0      202
Cruise Cap Allowances - CTA Lease        135      195      195      243       0      768
FT C-2 (Nordby) Roof & HVAC            54       0       0       0       0       54
FT C15 HVAC Improvements            30       0       0       0       0      30
Argo Yard Roadway Element I            25       0       0       0       0       25
FT Net Shed 9 Roof Replacement          21       0       0       0       0       21
P90 C175 Roof Replacement            10       0       0       0       0      10
SBM Central Seawall Replacemnt          5       0       0       0       0       5
Total                         16,013     6,812      195      243       0    23,263

Note*: Includes projects where some portion of the budget is authorized by Commission 
Pier 66 Cruise Tenant Improvement project supports Century Agenda Goal:
Double Economic Value of Cruise Traffic to Washington State                 13

Maritime Division 
2016 Capital Budget 
Pending 2015/2016 Authorization 
$'s in 000's                       2016      2017      2018      2019      2020     2016-20
FT Paving/Storm Upgrades             800      50       0       0       0      850
FT C15 Building Tunnel Improvement        700       0       0       0       0      700
SBM Paving                    670     130     400      0      0    1,200
Marina Mgt Sys Replacement           550       0       0       0       0     550
Harbor Island Marina East Dock           325       75       0       0       0      400
FT C14 (Downie) Roof & HVAC          105    1,015      72       0       0    1,192
FT Net Shed 3,4,5 & 6 Roof Replace        105     2,515       91       0       0     2,711
T46 Viaduct Driven Capital Wor           101        0        0        0        0      101
P66 Cruise Improvement-Staff Oversight       90       90        0        0        0      180
Bell Harbor Marina Pile Wraps             50      160     3,500        0        0     3,710
Total                         3,496     4,035     4,063       0       0    11,594


Projects maintain existing assets supporting Maritime vitality 
14

Maritime Division 
2016 Capital Budget 
Pending Future Authorization 
$'s in 000's                         2016      2017      2018      2019      2020     2016-20
P91 South End Fender Replace            950    1,127       0       0       0    2,077
Maintenance North Office Site Improve        500        0        0        0        0      500
P66 Cruise Term Roof Fall Protection         271       20        0        0        0      291
T91 P91 West Slope Stabilization           120      404       0       0       0      524
P66 Cruise Terminal Stand Offs             100      500        0       0       0      600
Second Gangway per Berth @ T91          50     450    4,000       0    5,000    9,500
FT Dock 4 Fixed Pier Corr Protection          10      190     1,000     2,300        0     3,500
FT Dock 3 Fixed Pier Improvement           10      190      800     2,000       0     3,000
FT Strategic Plan                       0     1,000     5,000     4,000        0    10,000
SBM Lower A Dock Improvement            0     825       0       0       0     825
Harbor Island Marina C Dock                0      500       0       0       0      500
FT S Wall West End Improvements           0     174     970     530       0    1,674
MIC West & Central Piers Resurfacing          0       70      638       0       0      708
FT W Wall N Fender Replacement           0      10     190    2,750       0    2,950
FT W Wall N Sheet Pile Corr Protection         0       10      190     2,575       0     2,775
FT Net Shed Electrical System              0       0       70     2,168       0     2,238
Harbor Island Marina ABD Dock             0       0       0      500       0      500
FT S Wall Ctrl Fender Repair&Corr Protect       0        0        0       10      190      200
FT W Wall S Sheet Pile Corr Protection         0       0       0       10      190      200
Contingency Renewal & Replace.          2,000    2,000    6,000    6,000    6,000    22,000
Total                           4,011     7,470    18,858    22,843    11,380    64,562
Projects maintain existing assets supporting Maritime vitality 
15

Maritime Division 
2016 Capital Budget 
Small Projects 
$'s in 000's                  2016      2017      2018      2019      2020     2016-20
SEA Security Grant Rnd 14        120       0       0       0       0      120
Small Capital Projects            2,514     1,370      500      500     1,240     6,124
MD Technology Projects          250      250      250      250      250    1,250
MD Fleet Replacement          1,076    1,175     755     801     926    4,733
Total                     3,960     2,795     1,505     1,551     2,416    12,227


Individual projects under each category in this grouping have a cost of $300,000 or less
and maintain existing assets supporting Maritime vitality 
16

Appendix - 
Supplementary Slides

Maritime Division 
Capital Budget By Location

Maritime 2016 Capital Budget 
By Location 
Cruise Terminals 
CRUISE                                   2016   2017   2018   2019   2020  2016-2020
Cruise
Status                Description
Commission Authorized      Pier 66 Cruise Tenant Improve Allow       12,000   1,500      0      0      0   13,500
Commission Authorized      Cruise Cap Allowances - CTA Lease         135    195    195    243      0     768
Pending 2016 Authorization    P66 Cruise Improvements - Staff Oversight      90      90      0      0      0     180
Pending Future Authorization   P66 Cruise Term Roof Fall Protection         271      20      0      0      0     291
Pending Future Authorization   T91 P91 West Slope Stabilization           120     404      0      0      0     524
Pending Future Authorization   P66 Cruise Terminal Stand Offs             100     500      0      0      0     600
Pending Future Authorization   Second Gangway per Berth @ T91           50     450    4,000      0    5,000    9,500
Small Projects            Cruise Small Projects                   265      0      0      0      0     265
Total Cruise                                        13,031   3,159   4,195     243    5,000   25,628

Pier 66 Cruise Tenant Improvement project supports Century Agenda Goal: Double
Economic Value of Cruise Traffic to Washington State 

19

Maritime 2016 Capital Budget 
By Location 
Fishermen's Terminal 
FISHERMEN'S TERMINAL                          2016   2017   2018   2019   2020  2016-2020
FT Waterside Projects Capital Projects
Status                Description
Pending Future Authorization   FT Dock 4 Fixed Pier Corr Protection         10     190   1,000   2,300      0    3,500
Pending Future Authorization   FT Dock 3 Fixed Pier Improvement          10     190     800   2,000      0    3,000
Pending Future Authorization   FT S Wall West End Improvements           0     174     970     530      0    1,674
Pending Future Authorization   FT W Wall N Fender Replacement           0     10     190   2,750      0    2,950
Pending Future Authorization   FT W Wall N Sheet Pile Corr Protection        0     10     190   2,575      0    2,775
Pending Future Authorization   FT Net Shed Electrical System             0      0     70   2,168      0    2,238
Pending Future Authorization   FT S Wall Ctrl Fender Repair&Corr Protect      0      0      0     10     190     200
Pending Future Authorization   FT W Wall S Sheet Pile Corr Protection        0      0      0     10     190     200
Small Projects            FT Waterside Small Capital Projects          0      0      0      0     140     140
Total FT Waterside                                   20    574   3,220  12,343    520   16,677
FT Upland Projects Capital Projects
Status                Description
Commission Authorized      FT C-2 (Nordby) Roof & HVAC            54      0      0      0      0     54
Commission Authorized      FT C15 HVAC Improvements             30      0      0      0      0     30
Commission Authorized      FT Net Shed 9 Roof Replacement          21      0      0      0      0     21
Pending 2016 Authorization    FT Paving/Storm Upgrades              800     50      0      0      0     850
Pending 2016 Authorization    FT C15 Building Tunnel Improvement        700      0      0      0      0     700
Pending 2016 Authorization    FT C14 (Downie) Roof & HVAC            105   1,015     72      0      0    1,192
Pending 2016 Authorization    FT Net Shed 3,4,5 & 6 Roof Replace        105   2,515     91      0      0    2,711
Pending Future Authorization   FT Strategic Plan                      0   1,000   5,000   4,000      0   10,000
Pending Future Authorization   FT Net Shed 10 Roof Overlay               0      0      0      0      0       0
Pending Future Authorization   FT Net Shed 11 Roof Overlay               0      0      0      0      0       0
Small Projects            FT Uplands Small Capital Projects          595      0     225      0     920    1,740
Total FT Upland Projects                              2,410   4,580   5,388   4,000    920   17,298
TOTAL FISHERMEN'S TERMINAL                       2,430   5,154   8,608  16,343   1,440  33,975
Projects maintain existing assets supporting Maritime vitality 
20

Maritime 2016 Capital Budget 
By Location 
Maritime Industrial Center 
MARITIME INDUSTRIAL CENTER                     2016   2017   2018   2019   2020  2016-2020
Maritime Industrial Center
Status                Description
Pending Future Authorization   MIC West & Central Piers Resurfacing       0     70     638      0      0     708
Small Projects            MIC Small Capital Projects              0     50      0      0     180     230
TOTAL MARITIME INDUSTRIAL CENTER                    0    120    638     0    180    938



Projects maintain existing assets supporting Maritime vitality 

21

Maritime 2016 Capital Budget 
By Location 
Shilshole Bay Marina 
SHILSHOLE BAY MARINA                         2016   2017   2018   2019   2020  2016-2020
Shilshole Bay Marina Recreational Boating
Status                Description
Commission Authorized      SBM Central Seawall Replacement         5      0      0      0      0      5
Commission Authorized      SBM Restrooms/Service Bldgs Replace   1,805   3,366      0      0      0    5,171
Pending 2016 Authorization    SBM Paving                      670     130     400      0      0    1,200
Pending Future Authorization   SBM Lower A Dock Improvement           0     825      0      0      0     825
Small Projects            SBM Waterside Small Projects           85     170     150      0      0     405
TOTAL SHILSHOLE BAY MARINA                     2,565   4,491    550     0     0   7,606


Projects maintain existing asset supporting Maritime vitality 
22

Maritime 2016 Capital Budget 
By Location 
Bell Harbor and Harbor Island Marinas 
OTHER MARINAS                           2016   2017   2018   2019   2020  2016-2020
Bell Harbor Marina
Status                Description
Pending 2016 Authorization    Bell Harbor Marina Pile Wraps           50     160   3,500      0      0    3,710
Small Projects            Bell Harbor Marina Small Projects         10     140      0      0      0     150
Total Bell Harbor Marina                              60    300   3,500      0      0    3,860
Harbor Island Marina
Status                Description
Pending 2016 Authorization    Harbor Island Marina East Dock         325     75      0      0      0     400
Pending Future Authorization   Harbor Island Marina C Dock Rehab        0     500      0      0      0     500
Pending Future Authorization   Harbor Island Marina ABD Dock Rehab      0      0      0     500      0     500
Small Projects            Small Capital Projects               165     285      0      0      0     450
Total Harbor Island Marina                            490    860      0    500      0    1,850
TOTAL OTHER MARINAS                         550   1,160   3,500   500     0   5,710

Projects maintain existing assets supporting Maritime vitality 

23

Maritime 2016 Capital Budget 
By Location 
Maritime Industrial Properties & Maritime Operations 
MARITIME INDUSTRIAL PROPERTIES                 2016   2017   2018   2019   2020  2016-2020
Terminal 91
Status                Description
Commission Authorized      T91 Substation Upgrades         1,073     26      0      0      0    1,099
Commission Authorized      P90 C175 Roof Replacement         10      0      0      0      0     10
Small Projects            Maritime Industrial Small Projects      425      0      0     175      0     600
TOTAL MARITIME INDUSTRIAL PROPERTIES             1,508    26     0    175     0   1,709
MARITIME OPERATIONS                       2016   2017   2018   2019   2020  2016-2020
Maritime Operations
Status                Description
Pending Future Authorization   P91 South End Fender Replace       950   1,127      0      0      0    2,077
Small Projects            Maritime Operations Small Projects     282     725      0      0      0    1,007
Total Maritime Operations                         1,232   1,852      0      0      0    3,084

Projects maintain existing assets supporting Maritime vitality 

24

Maritime 2016 Capital Budget 
By Location 
OTHER PROJECTS 
OTHER PROJECTS                          2016   2017   2018   2019   2020  2016-2020
Other
Status                Description
Pending 2016 Authorization    Marina Management System           550      0      0      0      0     550
Pending Future Authorization   Marine Maint North Office Site Improve     500      0      0      0      0     500
Pending Future Authorization   Contingency Renew & Replace        2,000   2,000   6,000   6,000   6,000   22,000
Small Projects            Seaport Security Grant Round 14        120      0      0      0      0     120
Small Projects            Fleet Replacement                1,076   1,175     755     801     926    4,733
Small Projects            Maritime Technology Projects          250     250     250     250     250    1,250
Small Projects            Marine Maintenance Small Projects       687      0      0      0      0     687
Small Projects            Maritime Unindentified Projects           0      0     125     325      0     450
TOTAL OTHER PROJECTS                       5,183   3,425   7,130   7,376   7,176  30,290

Projects maintain existing assets supporting Maritime vitality 

25

Maritime 2016 Capital Budget 
By Location 
HOMEPORT CONTAINER PROJECTS 
HOMEPORT CONTAINER PROJECTS                 2016   2017   2018   2019   2020  2016-2020
Other
Status                Description
Commission Authorized      T46 Public Access Mitigation at T117    515    513      0      0      0    1,028
Commission Authorized      T18 Street Vacation Completion        200   1,150      0      0      0    1,350
Commission Authorized      T5 Street Vacation Completion        140     62      0      0      0     202
Commission Authorized      Argo Yard Roadway Element I         25      0      0      0      0     25
Commission Authorized      T46 Viaduct Driven Capital Work       101      0      0      0      0     101
Pending Future Authorization   T30 Alaskan Way Street Vacation        0      0      0      0      0       0
HOMEPORT CONTAINER PROJECTS                  981  1,725    0    0    0   2,706


Legacy Container related projects to be funded by the Homeport. 

26

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.