7c supp
Item No. 7c_Supp Date of Meeting January 27, 2015 SeaTac International Airport NorthSTAR Program Program Commission Update Fourth Quarter 2014 NorthSTAR Program The North Sea-Tac Airport Renovation (NorthSTAR) Program is a collaboration between the Port of Seattle and Alaska Airlines to better serve passengers and improve operational efficiency. This program consists of renovating and expanding the north satellite, improving the north main terminal, refurbishing the north satellite baggage system, and new exterior walkways, stairs and elevators at Concourse C. Purpose: Improve the travel experience from airport drop-off to flight departure and working environment for employees Outcome: Facility modernization ; seismic reinforcement; enhanced traveler amenities; new contact gates; long-term energy savings; and operational efficiencies 2 NorthSTAR Program ACTIVE PROJECTS C800554 WP 104802 NS NorthSTAR Program Management George England, Program Mgr C800556 WP 104791 NS NSAT Renovation NSTS Lobbies Greg Vouros, Project Mgr C800547 WP 104784 NS Conc C Vertical Circulation Joe Nessel, Project Mgr C800545 WP U00042 NS Main Terminal Improvements Joe Nessel, Project Mgr C800555 WP 104792 NS Refurbish Baggage System Ken Warren, Project Mgr PENDING PROJECTS C800554 WP TBD NS Exterior Stairs Conc C&D EXPENSE PROJECTS WP 104656 Alaska NSAT & Conc C (CLOSED) WP U00072 NorthSTAR TI Work Doug Honeyman, Project Mgr WP U00094 PLB Relocation at C14 Joe Nessel, Project Mgr WP U00095 eGSE Relocation at Concourse C Doug Honeyman, Project Mgr WP U00129 CM Office Joe Nessel, Project Mgr WP U00130 BHS RMM Ken Warren, Project Mgr WP U00137 Project Activation Doug Honeyman, Project Mgr WP U00148 MCP Expansion Tenant Move Ken Warren, Project Mgr WP TBD NSAT RMM Greg Vouros, Project Mgr Legend: - Reflects Additional Budget Required or Behind Schedule - Reflects concern on Budget or No Float remaining on Schedule - Reflects Good Status on Budget and Schedule 3 Estimated Total : $522M NorthSTAR Program Overall Capital Budget Approved: $492M (* ) Forecasted cost include added aircraft gates and square footage at North Satellite for passenger hold rooms, concessions and increased level of service. 4 NorthSTAR Program Overall Schedule 2012 2013 2014 2015 2016 2017 2018 2019 2020 NSAT Planning & Design NSAT GC/CM Solicitation & Award NSAT Construction CONC C Planning & Design CONC C Bid & Award CONC C Construction BHS Planning & Design BHS Bid & Award BHS Construction MT Planning & Design MT Bid & Award MT Construction C/D STAIRS Planning & Design C/D STAIRS Bid & Award C/D STAIRS Construction = Commission Authorization NorthSTAR Program Progress Design Construction Overall Plan Actual Plan Actual Plan Actual North Satellite/STS Renovation 35% 32% 0% 0% 4% 3% Concourse C Vertical Circulation 100% 100% 70% 70% 68% 68% Refurbish Baggage Handling Sys 100% 100% 57% 52% 54% 50% Main Terminal Improvements 3% 3% 0% 0% 1% 1% Concourse C/D Exterior Stairs 0% 0% 0% 0% 0% 0% 5 NorthSTAR Program Management CIP: C800544 NS NorthSTAR Program Management Purpose: Overall management of the program; programmatic oversight, coordination and controls for consistency; support between stakeholders and projects; and efficient and successful execution of the entire program's objectives. Accomplishments: Received and incorporated AAG NorthSTAR Governance process into communication plan and decision matrix Completed Program update to AAAC; Q3 2014 to Commission briefing Completed transition of AAG project staff member Progress: Updated Master Schedule with changes to project schedules in design/construction. Preparing Q4 Commission Update briefing materials Issues: Tracking programmatic impacts due to delays on specific NorthSTAR projects 6 NorthSTAR Program Management CIP: C800544 NS NorthSTAR Program Management (continued) Metrics: Project Metrics Budget/ Actual Financial Metrics Budget/ Actual Remaining Planned Planned Overall Schedule 37% 33% Estimated Total Costs * $20.6M $2.8M $17.8M Progress SCS Participation 27.0% 30.8% Estimated Contingency $0.94M $5.2M (Program Management) (including Mgmt Reserve) Q4 Cashflow $252k $170k * Contingency included Risks: Communication and coordination between multiple teams, stakeholders and people Maintain baseline schedule agreed to by all stakeholders 7 NorthSTAR Program Management CIP: C800544 NS NorthSTAR Program Management (continued) ANTICIPATED COMMISSION ACTIONS 2015 2014 Design Q1 Construction Construction Q3 Briefing Q4 Briefing Authorization Briefing Authorization Authorization NSAT Baggage PreConst Svcs GC/CM NSAT GC/CM Q4 Briefing Expansion Q1-2015 Q2 Briefing Q3-2015 Q1-2015 * 2016 Construction Design Authorization Q1 Authorization Q2 Briefing NSAT Baggage Briefing Main Terminal Q3 Q4 Expansion Renovation Briefing Briefing Q1-2016 * Q2-2016 2017 Construction Authorization Main Term Renovation Q1-2017 * NSAT Baggage Expansion not included in current NorthSTAR scope or budget. NS NSAT Renovation & NSTS Lobbies CIP: C800556 - NS NSAT Renovation & NSTS Lobbies Purpose: Renovate and expand the satellite, including infrastructure, seismic reinforcement, gate relocations, north loop STS stations, and new penthouse shell Provide improved travel experience for customers, improved working environment for employees and long-term energy savings and operational efficiencies Accomplishments: Selected GC/CM Contractor and prepared Commission authorization memo Completed project notebook and kicked off 60% design effort Received Investment Committee approval of $1.75M for STS apron roof replacement and $14.4M to expand NSAT baggage handling system Conducted AAAC briefing and prepared MII ballot to expand NSAT baggage handling system Validated project remains within budget based on reconciled 30% cost estimate Finalized decision to seek LEED certification Progress: Continuing to evaluate construction phasing options with AAG to maximize gate utilization and availability during construction Evaluating level of LEED certification obtainable, as well other sustainable features to incorporate 9 NS NSAT Renovation & NSTS Lobbies CIP: C800556 - NS NSAT Renovation & NSTS Lobbies (continued) Issues: Current forecasted construction completion date is Q3 2020 Procurement strategy for long-lead items must be developed Dual taxi-lane delaying 60% design of ramp layout and apron; equipment congestion a concern Metrics: Project Metrics Budget/ Actual Financial Metrics Budget/ Actual Remaining Planned Planned Overall Schedule Progress 4% 3% Estimated Total Costs $415.8M $9.9M $405.9M (including Contingency) SCS Participation (Design) 6% 3.4% Estimated Contingency $40.7M $35.6M SCS Participation (Const) 0.0% * 0.0% * Q4 Cashflow $2.9M $1.3M Apprenticeship Utilization 15.0% 0.0% * Minority Utilization 15.0% 0.0% * Women Utilization 10.0% 0.0% * Preferred Entry Apprentices 1 in 5 0 * * No Information available yet Too early to report 10 NS NSAT Renovation & NSTS Lobbies CIP: C800556 - NS NSAT Renovation & NSTS Lobbies (continued) Risks: Scope additions absorbed by project at 30% may adversely impact project budget; Evaluate budget at conclusion of 60% design cost estimate Q2, 2015 Delayed resolution of critical issues may impact design schedule and subsequent early construction packages 11 NS Concourse C Vertical Circulation CIP: C800547 - NS Concourse C Vertical Circulation Project Status Good Purpose: Install 1:20 sloped walkways and elevators at C2, C10 and C16 to improve vertical circulation. Increase operational efficiency and improve customer experience and safety. Accomplishments: Opened C2 Phase 1 new doors and stairway C2 Phase 2 demolition and excavation complete Opened C10 Phase 1 new doors and stairway Progress: Construction efforts progressing as planned Extensive daily coordination between Port and AAG's Contractors due to congested work areas Issues: Phasing of work between Port and AAG Contractors requires frequent monitoring 12 C2 Phase 1 Opened New Doors & Stairs C10 Phase 1 Opened New Doors & Stairs C16 Elevator Shaft & Panels C10 Phase 1 Lobby, Elevator Shaft & Walkway 13 NS Concourse C Vertical Circulation CIP: C800547 - NS Concourse C Vertical Circulation (continued) Metrics: Project Metrics Budget/ Actual Financial Metrics Budget/ Actual Remaining Planned Planned Overall Schedule Progress 68% 68% Estimated Total Costs $15.1M $8.3M $6.8M (including Contingency) Delayed Outbound Bags 0 0 Estimated Contingency $2.0M $1.2M Delayed Outbound Flights 0 0 Q4 Cashflow $3.1M $4.0M Safety Hazard Reports (Level 2+) 0 0 Customer Complaints Rec'd <5/mo 2 Construction Change Orders processed 0 14 SCS Participation (Design) 33.4% 31.0% SCS Participation (Construction) 6.0% 2.7% Apprenticeship Utilization 15.0% 11.5% Minority Utilization 15.0% 7.6% Women Utilization 10.0% 0.0% Preferred Entry Apprentices 1 in 5 0 * Customer complaints associated with construction noise adjacent to passengers Risks: Unforeseen underground utilities during Phase 2 excavations Congested work area and coordination with AAG's covered walkway project 14 Main Terminal Improvements CIP: C800545 - NS Main Terminal Improvements Project Status Good Purpose: Renovate the north portion of the Main Terminal improving curbside, ticket lobby area, Checkpoint (#5), signage and dynamic messaging Improve the customer experience, operating efficiencies and overall aesthetics of the North Main Terminal Accomplishments: Completed scoping meetings with stakeholders Preliminary forecast for ticket lobby and checkpoint presented to stakeholders Progress: Complete forecast and develop alternatives for ticketing lobby and checkpoints Issues: Coordination with NSAT design concept to ensure a cohesive look/feel, AAG & TSA on Checkpoint 5 reconfiguration and Sustainable Airport Master Plan Metrics: TBD Risks: Least defined scope relative to the program budget 15 NS Refurbish Baggage System CIP: C800555 - NS Refurbish Baggage System Project has no float remaining on the Schedule Purpose: Refurbish existing baggage system to support Alaska Airlines operations on the North Satellite and Concourse D Extend the service life of C88 at satellite and in tunnel and a portion of C92 in Concourse D Accomplishments: Completed abatement for Motor Control Panel (MCP) room at North Satellite Decision reached with AAG and Port Ops to shut down C88 and consolidate multi-phase efforts Completed C92 Controls update and turnover for operations Concourse D mini sort area in use Progress: Shutdown of C88 and focused construction effort begins Jan 2015 ATR replacement of C92 to complete before May 1, 2015 Issues: Construction schedule impacted by MCP room relocation that may affect operational constraints as construction schedule has no float 16 CIP: C800555 - NS Refurbish Baggage System - Progress photos C92 Mainline 1 Conveyor back in operation C88 Motor Control Panel Room Construction Progress C88 Motor Control Panels operating 17 NS Refurbish Baggage System CIP: C800555 - NS Refurbish Baggage System (continued) Metrics: Project Metrics Budget/ Actual Financial Metrics Budget/ Actual Remaining Planned Planned Overall Schedule Progress 54% 40% Estimated Total Costs $19.5M $6.3M $13.2M (including Contingency) System Shutdowns 10 4 Estimated Contingency $1.3M $1.5M Operational Impacts 0 1 Q4 Cashflow $2.1M $3.6M Unplanned System downtime > 15 min. 0 0 Construction Change Orders processed 0 12 SCS Participation (Design) 14.3% 14.0% SCS Participation (Construction) 5.0% 3.5% Apprenticeship Utilization 15.0% 10.9% * Minority Utilization 15.0% 1.2% * Women Utilization 10.0% 8.8% * Preferred Entry Apprentices 1 in 5 0 * * Early in the project expect numbers to increase over time Risks: NSAT expansion decision may impact baggage handling system refurbishment requirements as to capability to handle forecasted bag volume and speed. Evaluating mitigation options 18 NS Concourse C & D Exterior Stairs CIP: C800554 - NS Concourse C&D Exterior Stairs Purpose: Add exterior stairs to Concourse C & D to enplane and deplane aircraft from the front and rear doors at locations identified by Alaska Air Group (AAG) Accomplishments: This is a Status 1 prospective project. A decision whether to include in the program will be made in the future 19
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.