7b

PORT OF SEATTLE
MEMORANDUM

COMMISSION AGENDA             Item No.     7b
STAFF BRIEFING
Date of Meeting   January 13, 2015

DATE:   January 7, 2015

TO:     Ted Fick, Chief Executive Ofcer

FROM:   Mark Reis, Managing Director, Aviation DivisionW
(a.   p,   m
Elizabeth Leavitt, Director, Aviation Flaming and Environmental \WW/L} CV

SUBJECT:  Sustainable Airport Master Plan (SAMP) Flaming Update

SYNOPSIS

This brieng provides an update on SAMP planning. With the draft airport activity forecast
complete, the planning team has developed and assessed several terminal expansion concepts
to meet long-term gate requirements. A few of the better performing concepts for terminal
expansion are presented here in addition to potential landside and airside improvements that
will be rened and analyzed over the next several months to determine feasibility, operational
efciency, and capacity benets. A separate Commission brieng focused on cargo will be
scheduled for February or March and will incorporate the most current SAMP planning.

The Seattle region is in a period of rapid growth. The city of Seattle had the highest rate of
population growth of large US. cities in 2013 and the Seattle-Tacoma International Airport
(Airport) was the fastest growing large hub airport in the US. in 2014 (YTD through
October).  In addition to providing jobs in the local community, the Airport is a critical
regional and national asset connecting the region to the global economy. The Airport requires
adequate infrastructure to fulll its mission as an economic engine and enable the region to
maintain its competitive edge. Due in large part to a strong regional economy and projected
slight decline in airfares over the long-term, airport activity is projected to reach 66 million
annual passengers and 540,000 annual aircraft operations by 2034. Strong near-term growth
and signicant increases in peak hour aircraft operations, passenger volumes and vehicles on
the roadways presents formidable facilities planning challenges.

Terminal expansion beyond approved projects will impact existing facilities such as
hardstands to accommodate passenger aircraft remain over night (RON), cargo, or aircraft
maintenance.  In order to meet long-term capacity requirements for these non-terminal
facilities, additional aireldconnected land will be required. Accommodating near- and long-
term demand also presents challenges on the airside and landside as increased peak hour
operations congest taxiways and on the landside vehicles queue to access the terminal drives
and parking facilities.

COMMISSION AGENDA
Ted Fick, Chief Executive Ofcer
January 7, 2015
Page 2 of 2

BACKGROUND

In September 2012, the Port Commission approved scope and budget for the creation of
a
SAMP and in February 2014, increased the SAMP budget from $6,000,000 to $9,650,000 to
include planning support to advance project denition of the International Arrivals Facility
(IAF).  In October 2014, staff provided the Commission with an overview of the
comprehensive and rigorous process to develop the Airport's draft activity forecast, which is
now complete. Over approximately the next three months, the planning team will work with
the Federal Aviation Administration on approval of the forecast, but is using the draft to
analyze facility requirements and evaluate development alternatives in an iterative process.
The master plan process provides an opportunity to take
a comprehensive assessment of
facilities capacity and forecasted demand over 5, 10, and 20 year timeframes. Airport master
plans are typically prepared approximately every 10 years. The last formal master plan for
the Airport was developed in the mid19905 and was focused primarily
on the third runway.
Passenger activity has since grown by over 50% to an anticipated 37.5 million annual
passengers in 2014.
Airports can be described as a threelegged stool, balancing capacity between airside,
terminal, and landside areas of the airport. Overall airport system capacity is limited by the
pinch point of the area with the least capacity. Through alternatives development and
evaluation, the SAMP will culminate in a capital improvement program and plan of nance
that will deliver cost effective projects to remove pinch points and provide
a high level of
service to airport customers.

ATTACHMENTS TO THIS BRIEFING

o   PowerPoint presentation

PREVIOUS COMMISSION ACTIONS OR BRIEFINGS

0   October 7, 2014 - Commission Brieng: Sustainable Airport Master Plan (SAMP)
Forecast and Facilities Challenges
0   February 28, 2014 - Commission authorization to amend the existing Sustainable
Airport Master Plan (SAMP) service agreement with Leigh Fisher Associates for
IAF-related planning tasks for an increase of $3,650,000 and a new total contract
amount of $9,650,000.
0   September 5, 2012 - Commission authorization for SAMP development and to
advertise and execute a contract for consulting services for the SAMP, with
a total
estimated value of $6 million.
0   August 14, 2012 - Commission deferred consideration of a request to approve
funding for the Sustainable Airport Master Plan (SAMP).
0   June 26, 2012 - Commission Brieng: Terminal Development Challenges.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.