4c attach 2
All '7; Washington StateDepartment of Transportation Port 0: Seattle DRAFT P.O. 30X l209 Seattle, WA 98111 Puget Sound Regional Clean Truck Program - Phase 2 N/A N/A (truck incentives) 570,000 76,950 493,050 (consultant) 20,000 2,700 l7,300 (interlocal agreement) 117,821 15,906 l0l,9l5 86. 30,000 4,050 25,950 737,82l 99,606 638,2l5 DD
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.