SODO ARENA PROPOSAL
SEATTLE DUWAMISH MANUFACTURING 
AND INDUSTRIAL CENTER 
Land Use and Planning Issues 




"Planning plays a key role in guiding Seattle's long-term development" Department of Planning
and Development, City of Seattle, 2012
Prepared by Peter Steinbrueck, FAIA 
STEINBRUECK URBAN STRATEGIES, LLC

DUWAMISH MANUFACTURING AND INDUSTRIAL CENTER 
PROPOSED SPORTS/ENTERTAINMENT ARENA IN SODO 
LAND USE AND PLANNING ISSUES 

HISTORY, BACKGROUND, AND PLANNING CONTEXT 
This report examines the historical, land use and planning context for the proposed sports and
entertainment facility at the Sodo site. By necessity it is a preliminary review and cannot
substitute for a full analysis of adverse impacts that would be the responsibility of the lead
reviewing agency and project proponent. 

Overview and Summary Recommendations 
As the Seattle metropolitan region continues to grow, scarce and finite industrial lands are
under intense long term pressure for conversion to non-industrial uses. Preservation of Seattle's
industrial lands is vital to the Port of Seattle, which operates the state's largest gateway for
seaborne international and domestic trade largely within the Duwamish Manufacturing
Industrial Center. These operations alone support more than 33,000 jobs in the region. The
ability of the port to prosper and fulfill its economic development mission depends on the
efficient movement of cargo between shipping terminals, rail yards, transload facilities and
distribution centers. The Port's Century Agenda strategic plan sets an aggressive goal to
generate 100,000 new jobs across the region in maritime, aviation, and other industries, and
increase marine cargo volume by over 1 million TEUs. Land and infrastructure capacity in the
Duwamish Industrial Area must be reserved to support these goals for jobs and economic
growth. 
In February, investor Chris Hansen announced his proposal for a regional public facility for a
sports and entertainment of approximately 700,000 square feet in area, with seating for up to
19,000 people, located south of the existing CenturyLink and Safeco Field stadiums. Mr. Hansen
has also expressed his ambition to co-develop a sports entertainment district surrounding the
arena, in Sodo, which he has compared to Staples Stadium LA Live in Los Angeles, with sportsrelated
bars, restaurants, and retail uses. 
The proposed SODO sports arena will likely result in incompatible non-industrial development
within the industrial area as well as significantly more traffic congestion that would interfere
with port operations. As such, the proposed arena would run counter to state, regional and
Seattle city policies intended to protect and enhance industrial areas. Further, the proposed
arena Memorandum of Understanding does not provide for a thorough review of potential
alternative sites, adverse impacts, and potential mitigation as required by law under the
Washington State Environmental Policy Act (SEPA). 

Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 2

KEY RECOMMENDATIONS 
Based on my review and an analysis of the legislative history, planning framework, land use
policies, code, and the proposed MOU, I offer five key recommendations: 
1.  The City should remove language from the MOU that binds the City to a specific
location. 
2.  The City should exercise its discretionary SEPA authority now and initiate a
programmatic EIS that will examine alternative sites. 
3.  The City, the Port, and stakeholder interest groups should engage in meaningful
discussions about essential policy issues and infrastructure needs of the Duwamish MIC. 
4.  The City and Port should commit to working collaboratively, pursuant to the Container
Port provisions of the State Growth Management Act (GMA), in the longer term to
establish stronger protections for manufacturing and industrial uses in the Duwamish
MIC and further restrict conversions of industrial lands to non-industrial uses. 
5.  Consider a mechanism for a long term stabilizing plan such as the creation of a new Port
District Overlay, or Planned Manufacturing and Industrial District such as Chicago's
highly successful Planned Manufacturing District (PMD) model. 
By entering into cooperative discussions, the City has the opportunity to reap the benefits of a
potential new sports facility while also remaining faithful to state, regional, and local policies
intended to strengthen vital economic activities of our industrial areas. 
_____________ 

LAND USE AND PLANNING CONTEXT 
The Sodo District 
The proposed "SoDo" area is not an official land designation and does not have precise
boundaries, but has come to refer generally to a sub-area of the Duwamish Manufacturing and
Industrial Center that is south of Pioneer Square, with a mix of businesses and uses that
encompass Safeco Field and Century Link stadium. The origin of the term "SoDo," or South of
the Kingdome, dates back to around 1990, when investors and city planners sought, for
marketing purposes to give more identity to the changing character of the south city industrial
area. Early use of the term is also found in the former Sears' West Coast distribution Center
(now Starbuck's) Sodo Center (1992), and the SODO Business Association, an organization
established in 1993 to bring greater government attention to the south central industrial area.
Its major concerns (ironically) had to do with the city's new comprehensive plan, Kingdome
replacement options, transportation, and gentrification of the industrial lands.1 


1
Seattle Times, "Sodo" Area Quietly Blooming," July 3, 1990. 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 3

Growth Management Act (GMA) 
With the passage of the Growth Management Act (GMA) RCW 36.70A, in 1990, the Washington
State Legislature sought to create a method for comprehensive land use planning involving
citizens, communities, counties, cities, and the private sector that would prevent uncoordinated
and unplanned growth. The Legislature found this type of uncontrolled growth posed a threat to
the environment, sustainable economic development, and the health, safety, and high quality of
life enjoyed by residents of Washington State. To address this threat, the GMA requires counties
of a certain size and growth rate, and the cities within them, to adopt comprehensive plans and
development regulations which are guided by 14 goals which include the consideration of
transportation, housing, economic development, natural resource industries, property rights,
and the environment. Regional Manufacturing/Industrial Centers are areas legally defined as
having statewide importance under GMA. 
In 2009, the legislature amended the GMA to require cities with container ports, like the City of
Seattle, to add a container port element to their GMA comprehensive plans to protect maritime
industrial areas from incompatible land uses and to protect vital freight corridors. 
The City is required under state law to engage in the collaborative planning approach (as
described in the container port element, RCW 36.70A.085 (3). This approach requires that port
elements adopted under subsections (1) and (2) of this section be developed collaboratively
between the city and the applicable port, and must establish policies and programs that: 
3. (a) Define and protect the core areas of port and port-related industrial uses within the city; 
(b) Provide reasonably efficient access to the core area through freight corridors within the
city limits; and 
(c) Identify and resolve key land use conflicts along the edge of the core area, and minimize
and mitigate, to the extent practicable, incompatible uses along the edge of the core area. 
4. Port elements adopted under subsections (1) and (2) of this section must be: 
(a) Completed and approved by the city according to the schedule specified in RCW 
36.70A.130; and 
(b) Consistent with the economic development, transportation, and land use elements of the
city's comprehensive plan, and consistent with the city's capital facilities plan. 
To date, while the required container port element has been incorporated by the city into the
comprehensive plan, I am not aware of programs or regulatory protections that have been
developed collaboratively between the Port and City for the Duwamish MIC, as required under
the new state law. 



Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 4

The Duwamish Manufacturing/Industrial Center 
Long before GMA, the Duwamish Manufacturing and Industrial Center (MIC), has been in
industrial use in Seattle for over 100 years. The MIC is bounded by the southern shores of Elliott
Bay to the west, I-5 to the east, includes Harbor Island, two-thirds of Boeing Field, and extends
five miles south of Seattle's downtown on both sides of the Duwamish Waterway to Boeing
Access road at the city limit. The MIC comprises 4,936 acres of marine and industrial land,
totaling 84 percent of the city's industrially zoned land. Three major land uses predominate in
the MIC: 32% commercial, 26% industrial, and 23% warehousing. In 2002, there were only
about 214 acres of vacant land (less than 4 % of the total acreage) in the MIC, available for new
development. Marine industrial uses are of the highest intensity in the MIC, with specific focus
on inter-modal break-bulk and container cargo terminals supporting the transfer of cargo
between ship, barge, rail, and truck. The Duwamish MIC is the Port of Seattle's primary marine
shipping area, with deep-water berths, wharfs, piers, shipyards, dry-docks, container cranes, ondock
rail, container yards, cargo distribution and warehousing, oil and petroleum storage
facilities, and major railroad yards. 2 
Total land area devoted to industrial and water-dependent uses has declined significantly in
Seattle over the last few decades, increasing the importance of this unique and limited industrial
resource. 

Duwamish MIC Planning Context 
The Duwamish MIC was designated in 1994 in the City of Seattle's Comprehensive Plan, Toward
a Sustainable Seattle, under the Growth Management Act (GMA), as one of eight
Manufacturing/Industrial Centers in the state targeted for employment growth. It has the
largest concentration of family wage jobs (3,500 businesses and over 63,000 jobs) in the Puget
Sound region, and is the most intensively utilized manufacturing/industrial center in the
Washington State. The 20-year employment growth target for the MIC is for 10,860 new jobs.
The Puget Sound Regional Council, central Puget Sound's transportation, economic, and growth
management planning organization, emphasized the importance of the Duwamish MIC in its
2002 Urban Centers Report: 
"The MIC is a vital international trade and transportation crossroads, receiving and 
distributing goods via roadway, water, rail and air. Its ability to provide multiple modes
of transportation represents a unique asset to the region and an enhancement to the
local business environment."i3 
Regional designation of a manufacturing/industrial center under GMA is made by affirmative
vote of the PSRC Executive Board, after careful consideration of the recommendation of the
Growth Management Policy Board, a presentation of the jurisdiction, and extensive staff
analysis. The designation is intended to assist countywide and local jurisdictions to more
2
Puget Sound Regional Council, Vision 2040 Report, http://psrc.org/growth/centers 
3 Puget Sound Regional Council 2002 Urban Centers Report, 2011.
http://psrc.org/assets/270/duwamish.pdf 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 5

effectively implement the region's growth and transportation strategies, and to be consistent
with and advance provisions of VISION 2040 plan to guide regional growth. 4 
To be eligible, a proposed center must be located within an urban growth boundary, and
preferably within a city. The qualifying manufacturing industrial center must: 
demonstrate compatibility with VISION 2040 
have a minimum of at least 10,000 jobs 
growth target level of at least 20,000 jobs 
show sufficient zoned development capacity to adequately accommodate growth
targets 
be planned future land use and zoned for at least for 80% for manufacturing and
industrial land uses 
show the jurisdiction's commitment to the MIC planning expectations for
environmental protections; land uses; economic objectives; public services and capital
facilities; transportation and movement of freight, and plans and strategies to identify
and address deficiencies 
King County Countywide Planning Policies 
Countywide Planning Policies (CPPs) are adopted and ratified by cities to address growth
management issues in King County. The CPPs provide a countywide vision and serve as a
framework for each jurisdiction to develop its own comprehensive plan, which, under GMA,
must be consistent with the overall vision for the future of King County. 
A regional concern and major objective of the Countywide Planning Policies is the protection
and management of resource lands, including manufacturing and industrial: 
"Manufacturing/Industrial Employment Centers are key components of the regional
economy. These areas are characterized by a significant amount of manufacturing,
industrial, and advanced technology employment. They differ from other employment
areas, such as business/office parks in that a land base and the segregation of major
non-manufacturing uses are essential elements of their operation."5 
The location and number of regional Manufacturing/Industrial Centers in King County were
determined through the joint local and Countywide adoption process based on a specific set of
adopted growth management goals and selection criteria (LU-52  LU-59). The Countywide
Planning Policies governing Manufacturing Industrial Centers include 7 specific criteria that are
ostensibly intended to ensure that all jurisdictions in King County work to: 


4
PSRC , Designation Procedures for New Regional Growth Centers and Regional Manufacturing Industrial
Centers, 2011, http://psrc.org/growth/centers/centers-procedures/ 
5
King County Countywide Planning Policies, p. 31, 2008. http://your.kingcounty.gov/ddes/compplan/CPP-
current.pdf. 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 6

1) Preserve and aggregate manufacturing industrial lands for manufacturing industrial uses; 
2) Discourage land uses which are not compatible with manufacturing industrial uses; 
3) Limit the size of offices and retail, unless accessory; 
4) Support the development of a regional industrial siting policy to promote industrial activity; 
5) Accommodate growth of 10,000 jobs; 
6) Design access to the regional Manufacturing/Industrial Centers to facilitate the mobility of
employees by transit, and the movement of goods by truck, rail or waterway as appropriate; and 
7) and for all jurisdictions, demonstrate compliance with these criteria through their
comprehensive plans and by establishing strategies to support the protection and viability of 
Manufacturing/Industrial Centers in King County.6 

City of Seattle Comprehensive Plan 
Seattle's Comprehensive Plan, Toward A Sustainable Seattle, is required under Washington
State law by the Growth Management Act (GMA) in order to guide regional growth and
coordinate land use and transportation goals and policies with King County and other
jurisdictions. The Seattle Planning Commission has stewardship responsibility over Seattle's
Comprehensive Plan. 
The Comprehensive Plan provides 37 Policies and 16 Goals for the Duwamish MIC, including
Land Use, Economic, Transportation, Urban Village, and Container Cargo elements of the plan.7
Specific Plan goals and policies for Seattle's Manufacturing and Industrial centers are clear,
unequivocal and direct in expressing the City's intent to protect its designated industrial lands
and deep harbor shipping activities: 
UV G22 Ensure that adequate accessible industrial land remains available to promote a 
diversified employment base and sustain Seattle's contribution to regional high-wage 
job growth. 
UVG23 Promote the use of industrial land for industrial purposes. 
UV19 Zoning that promotes manufacturing, industrial, and advanced technology uses
and discourages uses that are not compatible with industrial areas. 
UV21 Promote manufacturing and industrial employment growth, including
manufacturing uses, advanced technology industries, and a wide range of industrialrelated
commercial 
functions, such as warehouse and distribution activities, in manufacturing/ 
industrial centers. 
UV22 Strive to retain and expand existing manufacturing and industrial activity. 

6
King County Countywide Planning Policies, p. 37, 2008. http://your.kingcounty.gov/ddes/compplan/CPP-
current.pdf. 
7
Rebecca Herzfeld, "Zoning and Permitting for proposed arena," Seattle City Council Legislative
Department Memorandum, July 16, 2012 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 7

UV23 Maintain land that is uniquely accessible to water, rail, and regional highways for 
continued industrial use. 
UV24 Limit in manufacturing/industrial areas those commercial or residential uses that 
are unrelated to the industrial function, that occur at intensities posing short- and 
long-term conflicts for industrial uses, or that threaten to convert signify cant 
amounts of industrial land to non-industrial uses. 
UV24.1 The City should limit its own uses on land in the manufacturing/industrial
centers 
to uses that are not appropriate in other zones and should discourage other public 
entities from siting non industrial uses in manufacturing/industrial centers. An 
exception for essential public facilities should be provided. 
A1 
LU 27 Limit in industrial and manufacturing areas commercial or residential uses
unrelated to industrial function that occur at intensities posing short and long term
conflicts for industrial uses, or threaten to convert significant amounts of industrial land
to non-industrial uses. 
And in April this year, as part of the 2011-2012 Comprehensive Plan annual amendment
process, the City Council added a new Container Port Element (Council Ordinance Number:
123854) to the Plan in order to comply with the 2009 state law. Adoption of this amendment to
the city's Comprehensive Plan was required under the Washington State the Growth
Management Act (RCW 36.70A.085), because container ports in Washington State were
recognized as "increasingly challenged by the conversion of industrial properties to non industrial
uses thathinder port operations, restrict efficient movement of freight, and limit opportunities
for improvements to existing port-related facilities." 
The container port element requires the City to adopt regulatory controls, i.e., zoning 
regulations, that are consistent with this new comprehensive plan element. Land use regulatory
controls are supposed to implement the comprehensive plan policies, (See RCW 36.70A.085 (6)
(a)). Creation of a port overlay district is one of the options mentioned in the GMA to
accomplish this purpose. 

Duwamish Manufacturing and Industrial Center Neighborhood Plan 
On June 12, 2000, after more than four years and thousands of hours of intensive citizen
volunteer and stakeholder participation, the City Council passed a watershed package of
legislation including: amendments to the City's Comprehensive Plan; changes to the land use
regulations; the Stadium Transition Area Overlay District; and adoption of the Greater
Duwamish Manufacturing and Industrial Center Neighborhood Plan and implementation
strategies. 


Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 8

The 95 page Duwamish MIC Neighborhood Plan advanced a vision for the Duwamish MIC as a
"vital economic and transportation crossroads of regional significance." 8 
The Duwamish MIC Neighborhood Plan also recommended specific goals and policies intended
to ensure the viability and expansion of manufacturing and industrial activity in the Duwamish
MIC, and to support and implement the following objectives: 
Restrict incompatible or competing land uses within the M & I Center; 
Encourage manufacturing and industrial job retention and growth: 
Establish a growth target of 10,860 new family wage industrial jobs; 
Retain and improve access to, and transportation within, the M &I Center; and 
Retain existing businesses and encourage new manufacturing industrial development
within the M & I Center. 

The 2000 Duwamish MIC Plan's Executive Summary offered a stern, if not prescient warning
about the harm that could come by government indifference and inaction to long-term
cumulative impacts of conversions and redevelopment of industrial lands in the MIC: 
"The cumulative impacts of major construction projects, explosive regional growth and
seriously congested transportation system have degraded the viability of the Duwamish M&I
Center over the past decade. Continued and intensified pressure to redevelop industrial land
for non-industrial purposes is the most significant threat to this vital resource. If the M &I
Center is to remain viable, it is imperative that Governmental decision-makers become
educated on issues affecting the M & I Center and the that all elements of the City and
County government take a proactive role in defending the M & I Center from further
destabilization." 

Zoning and Land Use Regulation 
The Seattle Land Use Code contains five zone groups that regulate development in the city. They
are Single Family Residential, Multifamily, Commercial, Industrial, and Downtown. There are a
number of zones within each group, and most can be placed anywhere in the city where broad
functional and locational criteria exist to support those zones. The industrial group includes four
zone classifications, which are found in several different areas of the city. 
The underlying regulations in Seattle's land use code are not isolated, stand-alone provisions. All
land use regulation must be consistent with the applicable planning and land use polices in the
comprehensive plan. The legal framework for zoning can be seen in the context of five
applicable planning, land use policies, and zoning regulations that sports and entertainment
facility and retail development must be in compliance with under the city's land use code. In
order of conformance they are:

8 City of Seattle, "Duwamish Manufacturing and Industrial Center Neighborhood Plan, "2000. 
http://www.seattle.gov/neighborhoods/npi/plans/duwa/ 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012   Page 9

1) The regional designation under GMA of Duwamish Manufacturing and Industrial Center 
2) The City of Seattle's Comprehensive Plan; 
3) The MIC Neighborhood Plan (embedded in Comprehensive Plan); 
4) The Stadium Transition Area Overlay District; and 
5) Land use zone designation Industrial Commercial-85 (IC-85). 
Industrial Commercial (IC) 85 zone: Most of the property proposed for the new arena south of
Safeco Field is zoned Industrial Commercial (IC) and is within the Stadium Transition Area
Overlay District (STAOD). The intent of the IC zone is to promote development of businesses
which combine a mix of industrial/manufacturing with commercial uses, as well as technology
research and development. The underlying IC zone allows spectator sports facilities, and office,
restaurant and retail uses and there are no size limits for non-industrial uses in portions of the IC
zone that are within the Duwamish MIC. However, the STAOD prohibits hotels and residential
uses, as do the IG zones in the Duwamish MIC in order to minimize conflicts with industrial uses
(SMC 23.50.012 Table A and 23.7). The north end of the STAOD [CenturyLInk and North Lot area]
adjacent to Pioneer Square, extends beyond the Duwamish MIC. 
The arena proponent also proposes use of a narrow, elongated strip of land currently owned by
the Burlington Northern and Santa Fe Railroad (BNSF) immediately to the east of the full block
arena site. However, the adjacent property is outside the STAOD and zoned Industrial General
(IG2), which prohibits spectator sports facilities use in the Duwamish MIC. The land would need
to be purchased from BNSF, and require a rezone to IC to allow stadium use. 
Parking Requirements: The minimum parking requirement prescribed for spectator sports
facilities in the code is: "1 space for each 8 fixed seats in public assembly areas, or 1 space for
each 100 square feet of public assembly area not containing fixed seats." Assuming fixed seating
for 19,000 spectators, this would result in a minimum parking requirement of 2,375 spaces. 9 An
estimate of the gross square footage for that number of parking spaces is in the range of
700,000 to 850,000 square feet. This number does not include minimum parking requirements
for complementary retail and commercial uses, such as the sports entertainment retail mall
contemplated by arena proponent. 
The proponent has produced no information on how much parking would be provided, or where 
the parking would be located. The STAOD establishes a maximum number of parking spaces per
use, but it does not apply to spectator sports facilities. If the required arena parking is located
within the STAOD, it may also be used for general parking (and possibly to support the retail
entertainment mall traffic). Required parking for a spectator sports facility that is located within
the STAOD is exempt from the parking maximum ratio REGARDLESS of whether it is shared with
another facility.10 Outside the STAOD, IG zones within the Duwamish MIC do allow reserved
parking tied to a spectator sports facility that is located inside the STAOD beyond the minimum
required number of spaces for the spectator sports facility (SMC Table A for 23.50.012, Note 2).
9
SMC. Section 23.54.015, Table A. 
10 Rebecca Herzfeld, Senior Policy Analyst, City of Seattle Legislative Department Memorandum
to City Council, "Parking, access and loading requirements for the proposed arena," June 13,
2012. 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 10

It is highly unlikely that the proposed arena site at S. Holgate, which comprises approximately
280,000 square feet in area (including S. Occidental right of way), could physically accommodate
both the 700,000 square foot arena and 900,000 square foot parking structure, if both were to
be built on the same site. Additional land near the sports facility site that would most likely be
needed to accommodate such a large parking structure but a specific site has not been
identified. 
The proponent has revealed no details or plans for how the entire sports/entertainment
complex would be configured, or how much more land will be needed to complete the full buildout.
Furthermore, this area of the former Duwamish tide flats consists of land fill known for
having a high water table and poor soils, which would most likely make underground parking
not feasible. Another option is for the sports arena to share at least some of the required
parking through covenants with other nearby parking lot/garage owners, such as the Mariners.
A significant parking shortage could arise, however, on days when Safeco Field or CenturyLink
Field events overlap with the activities at the proposed new arena. 
It is important to note that lands surrounding the subject property outside the STAOD, to the
west of S. Utah Street, south of South Holgate, and immediately east of the subject property
(BNSF), are in active manufacturing/industrial use an all zoned either IG1 or IG2. The land use
code expressly disallows expansion of the STAOD boundary to the south and east, where it
would further encroach on active manufacturing/ industrial uses. In any event, a boundary
expansion would require a Council approved rezone. 
Street Vacations: The proponent would also likely seek to vacate South Occidental for the block
between S. Holgate and S. Massachusetts and possibly a half block of S. Massachusetts north of
the subject site, in order to accommodate the size, configuration, parking needs, loading and
access requirements for the new 700, 000 square foot sports facility. This could alter or restrict
vehicular access to Safeco garage to the north of the subject site. A new service access road to
the east between the arena site and the Safeco parking garage might be needed, with the
potential to consume more land in industrial use. 
Stadium Transition Area Overlay District (STAOD) Purpose and Intent 
Land located within the Stadium Transition Area District (STAOD), including the arena site, is
subject to the underlying (IC-85) zone, except as otherwise expressly provided in the land use
code and as modified and further defined by the STAOD. Special overlay districts are provided
for in the code typically establish regulations in addition to what the underlying zoning provides.
Overlays accomplish specific city policy objectives in specific areas of the city. The existing
overlays in the city's land use code are many, and vary greatly. They include historic districts,
transit/station areas, shorelines, major health care and educational institutions, and some
neighborhood business districts. They typically establish both use and development regulations
in addition to the underlying zone, and in case of conflict, the overlay provisions prevail.11 
At the time of adoption by the Seattle City Council of the package of stadium-related legislation
in June, 2000, the stated purpose and intent for establishing the Stadium Transition Area
11
Legislative and Executive staff Report, "Stadium Transition Area," p. 2, City of Seattle, 2000. 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 11

Overlay District was to implement the City's Comprehensive Plan and Duwamish MIC
Neighborhood Plan. The STAOD was further intended to encourage a mix of complementary
uses and redevelopment that would serve to: 1) support a pedestrian friendly streetscape, and
2) avoid conflicts and discourage encroachment on nearby industrial uses to the south of Safeco
Field.12 
When the stadium transition area boundaries were being studied by city staff in 2000, the
southern boundary of the rezone was first proposed by the executive to be drawn just beyond
Safeco Field at S. Massachusetts Street, in recognition of the land occupied by Safeco Field,
former Kingdome, and future Qwest Field (now CenturyLink). However, the City Council opted 
to extend the boundary to S. Holgate in the final legislation in order to accommodate more
mixed use development to complement the sports facilities.
There is nothing in the legislative record or staff reports to indicate that the STAOD was
intended to support a third sports stadium. Capacity for a third sports stadium within the rezone
and STAOD boundary was never analyzed, questioned, or even contemplated by staff, the
executive or city council.13 

ENVIRONMENTAL REVIEW ISSUES 
SEPA Issues and the Arena Memorandum of Understanding 
The proposed Memorandum of Understanding (MOU) for the Seattle Sports and Entertainment
Facility is described as an "enforceable agreement" of the parties, that expressly intends to
legally bind the city and county to a set of terms and conditions regarding, among other things,
the size, location, design, development, and operation of a 700,00 square foot multi-purpose
arena. It specifically calls out the location of the "Project Site" as south of downtown, where the
proponent has already acquired land. The proposed MOU is silent on specifics of parking
requirements and the proponent's plans to co-develop other sports and entertainment related
retail uses near the arena. 
The MOU acknowledges that "the Project is subject to review and potential mitigation under
the State Environmental Policy Act (SEPA)," but includes qualifying language that states the "City
and County may not take any 'action' within the meaning of SEPA except as authorized by law."
The Port, Duwamish area businesses, and local land use lawyers have raised serious concerns
recently about the city and county committing to a specific location without the any evaluation
of alternative sites and potential adverse environmental impacts, and moving hastily to approve
the "binding and enforceable" MOU in advance of SEPA review. 



12
SMC. Chapter 23.74.002, Stadium Transition Area Overly District, Purpose and Intent, 2000. 
13
Peter Steinbrueck, Seattle City Council President, 2000, Expert Testimony to King County Council
Transportation Committee, June 19, 2012. 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 12

EIS Precedent studies  Stadium Siting and Location Criteria 
Under SEPA, a formal study of environmental impacts (EIS) and possible mitigation is conducted
once the lead agency (in this case the Seattle Department of Planning and Development) has
made a threshold determination that adverse impacts are possible or likely to occur by the
proposed action. The steps involve an initial public comment and scoping phase to determine
which elements of the environment, such as air, water quality, utilities, cultural resources, land
use, and transportation, must be reviewed and possibly mitigated in the EIS process. A draft EIS
is then published for further public review and comment, and a Final EIS is completed. The Final
EIS is used by the lead regulatory agency to guide its decision in determining what conditions
(mitigation) must be placed on the project for permit approval.14 
The Port urges a phased approach to environmental review of the arena as described in the July
18, 2012 letter to the City and County Councils: 
"The first phase would be a programmatic EIS that would evaluate and compare
respective impacts of several alternative sites besides the proposed Sodo site. This would
provide the independent, critical evaluation necessary for the informed selection of the
most appropriate location for the arena. Similarly, site alternative sites for CenturyLink,
Safeco Field, [as well as for Key Arena, and the Kingdome] were extensively evaluated
through the environmental review process to determine which of the alternative sites
offered the greatest locational advantages and fewest impacts on existing businesses,
traffic, and infrastructure. For an informed selection of the most appropriate location for
the [proposed] sports arena, it is critical that reasonable alternatives to the Sodo arena
site be evaluated first. Once a preferred site is determined through programmatic
review, a project level EIS would evaluate project specific impacts wherever the arena is
proposed to be located. If the project site is in the Duwamish Industrial Center, this
environmental review would closely examine the likely adverse impacts to industrial
uses, transportation, railroad, and port maritime operations. "15 
Rebecca Herzfeld, Senior Policy Analyst for the Seattle Legislative Department noted in a recent
staff report to the City Council that environmental conditions imposed on the baseball and
football stadiums in Sodo were limited to project specific impacts including requirements for
Transportation Management Plans, pedestrian amenities, water conservation measures, and
construction-related impacts.16 However, the comparative impacts analysis gained through
programmatic environmental review of alternative sites is, in itself a process for determining
least adverse environmental impacts needing to be mitigated. 


14
Preston Gates & Ellis LLP, "Washington Environmental Law Handbook," Third Edition. 1997. 
15
Tay Yoshitani, Port of Seattle CEO, ""Letter to City and County Councils," July 18, 2012 
16 Rebecca Herzfeld, Senior Policy Analyst, City of Seattle Legislative Department Memorandum
to City Council, "Parking, access and loading requirements for the proposed arena," June 13,
2012. 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 13

Seattle Planning Commission Report to City Council 
At the request of the Seattle City Council, the Planning Commission prepared a recent report on
the arena proposal and their responses to the Council's questions related to planning, land use,
and transportation related issues raised by the proposal. The Commission concluded that the
proposed location of the arena in Sodo "...has the potential to generate adverse impacts that
may threaten the container port, maritime, industrial, and manufacturing sectors  which have
been found to be vital to the health and resilience of our local state and regional economy and
that are expressly protected and promoted by the City's guiding policy document: the
Comprehensive Plan."17 
The Seattle Planning Commission, established by city charter in 1946, is an independent
voluntary advisory body of 16 members appointed by the Mayor and City Council. Its members
represent a diversity of experience, viewpoints and professional expertise, particularly in
planning, land use, and development. The role of the Commission is to advise the Mayor and
City Council and City departments on broad planning goals, policies, and major projects shaping
the physical development of Seattle. Using the long-range vision and framework of the Seattle
Comprehensive Plan, the Commission reviews and makes recommendations on land use and
zoning, transportation, and neighborhood planning issues. The Seattle Planning Commission is
the steward of Seattle's Comprehensive Plan, Toward a Sustainable Seattle, a 20 year vision
which guides new growth in population, jobs, and development, steers the City's capital
expenditures, and informs new regulations under GMA. 
The Planning Commission's report to the City Council closely examined the proposed arena's
location and potential impacts in its relationship to not only the City's land use regulations, and
also the larger planning framework of the Comprehensive Plan, Countywide Polices, Regional
Vision 2040, and statewide planning goals and polices. The Commission recommended that no
action on the MOU be taken by the City without more thorough review and analysis.
The report cites a "lack of sufficient information" to identify and mitigate potential adverse
impacts to the Port and related manufacturing and industrial uses. The Commission sees an
"inherent risk" in locating another sports and entertainment facility at the Sodo location, and a
"strong likelihood" that living wage jobs and neighboring businesses will be displaced, and the
Ports cargo operations and freight mobility further hampered and disrupted. The Commission
recommends establishing a new Port District or other planning mechanism that would
strengthen the MIC as a manufacturing and industrial "sanctuary, with further restrictions on
the amount of non-industrial uses that have been proven to undermine industrial and port
operations."18 


17
Seattle Planning Commission, "Review of the Proposed Sport Arena in the Duwamish Manufacturing and
Industrial Center," July 27, 2012.
http://www.seattle.gov/planningcommission/docs/SPCreviewofproposedSODOarena.pdf 
18
Seattle Planning Commission, City of Seattle, "Review of the Proposed Arena in the Duwamish
Manufacturing and Industrial Center," July 27, 2012 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 14

CONCLUSION 
Unlike commercial and residential uses which can occur in a many other areas throughout the
city and region, industrial uses are extremely limited geographically, and the land, deep harbor
access, and logistical resources cannot be duplicated elsewhere-- and are nonrenewable. 
Marine and industrial uses, once widely located throughout the city, are today concentrated in
the Ballard-Interbay area, SODO, Harbor Island and Duwamish River areas due to non-industrial
commercial and residential development pressures. Conversion to non-industrial uses over time
is irreversible, and permanently diminishes the extremely limited land supply in the region
available for industrial uses. The interrelated land use and economic impacts were exemplified 
in development of Safeco Field, which resulted in the displacement of approximately 31
businesses and 763 high wage industrial, manufacturing and warehouse jobs in the Duwamish
MIC.19 
The proposed Sodo arena complex, along with the proposed sports related entertainment mall,
is at odds with the entire body of planning framework, and with the preponderance of land use
and economic policies at the highest levels from state to the local, intended to support, protect,
and promote industrial and manufacturing uses in the Duwamish MIC as a regional industrial
sanctuary. 
Should this proposal advance to the site-specific project phase without a programmatic
environmental study of alternatives, it may be vulnerable to an appeal not just under SEPA
rules, but as a growth management issue, particularly since it would likely impinge on the Port
current operations, and capacity to grow its marine industrial functions where state law intends
it - in the designated Duwamish Manufacturing and Industrial Center. 
SEPA requires the project proponent in the initial phase of environmental review to provide an
analysis of "reasonable alternatives," and identify potential adverse impacts and determine
acceptable mitigation measures. It is not the responsibility of the Port or other affected
businesses in the Duwamish MIC to prove they would be harmed. 
As the project has not undergone any detailed environmental review, it is not possible to
anticipate the full range of impacts and potential mitigation that could be required. But given
the inherent geographical and land constraints in the Duwamish MIC, it is highly unlikely that
another multi-block sports arena and entertainment mall of this size can be accommodated at
the proposed location in SoDo, without further encroaching on active industrial lands and
spurring increased property speculation and the long-term conversion of limited industrial land
to non-industrial uses. 
______________ 



19
Baseball Stadium FEIS, June 1996 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 15

Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 16






REFERENCES 
Planning Polices 
Greater Duwamish Manufacturing/Industrial Center Neighborhood Plan, 2000 
Seattle Comprehensive Plan, 2012 
Countywide Planning Policies Updated December, 2010 
PSRC Vision 2040, 2011 
Seattle Municipal Code 
Studies and Reports 
Zoning and Permitting for proposed Arena Staff Analysis, Rebecca Herzfeld, Legislative
Department Central
Staff.http://clerk.seattle.gov/~public/meetingrecords/2012/gpnf20120718_2a.pdf 
The Future of Industrial Lands, Seattle Planning Commission Report, July 2007 
Seattle Planning Commission July 2012 Report to Council. 
http://www.seattle.gov/planningcommission/docs/ILReport07_web.pdf 
Review of Proposed Sports Arena in the Duwamish Manufacturing and Industrial Center, Seattle
Planning Commission Report, July 27, 2012. 
http://www.seattle.gov/planningcommission/docs/SPCreviewofproposedSODOarena.pdf 
PSRC 2002 Urban Centers Report, Duwamish Manufacturing/Industrial Center, 2002 
http://psrc.org/assets/270/duwamish.pdf 
Washington State Major League Baseball Stadium  Site Evaluation Report, Prepared by the
Washington State Major League Baseball Stadium Public Facilities District, March 15, 1996. 
Sources 
Washington Environmental Law Handbook, Third Addition, Preston Gates & Ellis, LLP, 1997 
Memorandum of Understanding Seattle Sports and Entertainment Facility, May 18, 2012 
http://www.seattle.gov/council/attachments/201206arena_A.pdf 




Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 17

APPENDIX 
SEATTLE COMPREHENSIVE PLAN - CONTAINER PORT ELEMENT 
LAND USE POLICIES 
CP/LU1 Help preserve cargo container activities by retaining industrial designations on land that
supports marine and rail- related industries including industrial land adjacent to rail or waterdependent
transportation facilities. 
CP/LU2 Continue to monitor the land area needs, including for expansion, of cargo containerrelated
activities and take action to prevent the loss of needed land that can serve these
activities. 
CP/LU3 Discourage non-industrial land uses, such as retail and residential, in industrially-zoned
areas to minimize conflicts between uses and to prevent conversion of industrial land in the
vicinity of cargo container terminals or their support facilities. 
CP/LU4 Consider how zoning designations may affect the definition of highest and best use, with
the goal of maintaining the jobs and revenue that cargo container activities generate and to
protect scarce industrial land supply for cargo container industries, such as marine and railrelated
industries. 
CP/LU5 Consider the value of transition areas at the edges of general industrial zones which
allow a wider range of uses while not creating conflicts with preferred cargo container activities
and uses. In this context, zoning provisions such as locational criteria and development
standards are among the tools for defining such edge areas. 
TRANSPORTATION POLICIES 
CP/T1 Monitor, maintain and improve key freight corridors, networks and intermodal
connections that provide access to cargo container facilities and the industrial areas around
them to address bottlenecks and other access constraints. Provide safe, reliable, efficient and
direct access between Port marine facilities and the state highway or interstate system, and
between Port terminals and railroad intermodal facilities, recognizing that Port operations must
address other transportation needs, such as pedestrian safety. 
CP/T2 Make operational, design, access and capital investments to accommodate trucks and
maintain successful railroad operations and preserve mobility of goods and services.
Improvements may include, but are not limited to, improvement of pavement conditions,
commute trip reduction strategies, including through transportation management associations,
roadway re-channelization to minimize modal conflicts, use of intelligent transportation
systems, construction of critical facility links, and grade separation of modes, especially at
heavily used railroad crossings. 
CP/T3 Maintain the City's classification of "Major Truck Streets." Because freight is important to
the basic economy of the City and has unique right-of-way needs to support that role, freight
will be the major priority on streets classified as Major Truck Streets. Street improvements that
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 18

are consistent with freight mobility but also support other modes may be considered in these
streets. 
CP/T4 Identify emerging cargo container freight transportation issues and work with affected
stakeholder groups, including the Seattle Freight Advisory Board. Provide regular opportunities
for communication between the City, the freight community, other affected communities, and
other agencies and stakeholders. 
CP/T5 Continue joint City and Port efforts to implement relevant Port recommendations such as
recommendations contained in the Container Terminal Access Study. 
CP/T6 Given the importance of cargo container terminal operations to the state and regional
economies, develop partnerships within the City, the Port, the region and the State to advocate
for project prioritization and timely funding to improve and maintain freight infrastructure, and
explore funding partnerships. 
CP/T7 Maintain consistency between local, regional and State freight-related policies. 












Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 19

KINGDOME SITE SELECTION PROCESS 1976 - 1971 
1967 State legislation appointing six member stadium commission to make complete study and
investigate acquisition. 
Commission together with consultants reviewed 94 sites and selected 11 sites for further study.
Consultants concluded that South Park was best suburban site, and Seattle Center best urban
site. Stadium Commission recommended Seattle Center 
Seattle Center site was rejected by voters in May, 1970. 
Governor appointed a new State Stadium Commission, new round of site selection process,
public meetings, site visits held throughout summer 1970. A technical Committee made up of
planners, architects, and engineers served as staff to Commission. 
Review of over 100 site proposals located throughout King County, narrowed to 60, then to 17,
then 5 sites recommended by the Commission: Dearborn, King Street, Longacres, Riverton, and
Seattle Center. Sicks Stadium and South Park were added, Seattle Center deleted. 
Site Selection Evaluative Criteria 
1.  Accessibility  car and public transportation 
2.  Parking capacity 
3.  Site Configuration, characteristics 
4.  Utility  ability to attract variety of events 
5.  Environment suitability for future development 
6.  Disruption/displacement of existing businesses or residents 
7.  Support facilities nearby to complement stadium related activities 
8.  Expansion flexibility capacity, parking, complementary uses, etc 
9.  Local climate conditions 

CENTURYLINK (QUEST) STADIUM - SITE SELECTION PROCESS 
Key Selection Criteria 
1)  Adequate Vehicular Access 
2)  Efficient Pedestrian Circulation 
3)  Land Capacity, Stadium Size and Configuration, Parking 
4)  Location within Urban Growth Boundary 
5)  Adequate Infrastructure 
6)  Compatibility with Surrounding Land Uses
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 20

CENTURYLINK (QUEST) STADIUM SITE SELECTION PROCESSS 1996 - 1999 


















Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 21

PLANNED MANUFACTURING DISTRICTS  CHICAGO MODEL 
PMDs  Growing Chicago Business for 20 Years 
In the early 1980s Clybourn Avenue was considered by many a gritty industrial 
wasteland, used primarily as a shortcut downtown for drivers. That changed in 1988 
when the first Planned Manufacturing District (PMD) was created along Clybourn 
Avenue, dramatically changing the area into what it is today by transforming old 
industrial sites into a retail "buffer" zone while solidifying the heavier industrial "core" 
sub-district to the west. The PMD succeeded in its intentions  to foster the city's 
industrial base, maintain the city's diversified economy, and encourage industrial 
investment, modernization and expansion by providing stable and predictable industrial 
environments. 
Since then 14 other PMDs have been created in Chicago. Cities nationwide have 
noticed their success, including New York, Seattle, Portland and Milwaukee, and have 
studied them as models for their own economic development. PMDs have proven to be 
one of the most successful zoning tools used to retain industrial jobs and encourage 
manufacturing and industrial growth in Chicago, and are celebrating 20 years of 
nurturing and strengthening local businesses. 
How have PMDs benefited local businesses? 
Many Chicago businesses can be called success stories in no small part because 
of PMDs. Several businesses attribute their growth to the role of PMDs. 
Chicago Scenic Studios, remembers life as a business 
owner 30 years ago before PMDs. "The creation of PMDs was a perfect solution for 
my business. I have been in the Goose Island PMD for 10 years now, and it allows 
me the space to grow my business and the security of knowing my business is not in 
jeopardy from encroachment by non-industrial uses." 
-owned Water Saver Faucet, said "we like our 
current location in the Chicago-Halsted PMD because it is centrally situated in the 
city, which offers a diversity of skilled employees and has many transportation 
options for our employees to commute to work. In fact, we have been so successful 
in our PMD that we have plans of expanding into the Goose Island PMD." 
C.H. Robinson, one of the world's largest third-party logistics firms, has found a 
home in the Clybourn Corridor PMD. Patrick Nolan, director of the Chicago Central 
office, emphasizes how their city location is critical to attracting their college educated 
workforce, and how the movement into the Clybourn PMD helped almost 
double their number of employees, from 400 in 2005 to more than 760 to date. 
-owned General Iron, and Jay Goltz, CEO and 
founder of The Goltz Group  comprised of Artists' Frame Service, Jayson Home & 
Garden, and Chicago Art Source  can also attest to the advantages of operating 
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 22

and expanding their businesses within a PMD. 
How has Chicago's long-term economic development plans benefited from the 
PMDs? 
Historically, the movement of residential and commercial businesses into an 
industrial area created friction regarding land-use compatibility, safety problems and 
traffic issuesleading to displacement of industry and loss of high-paying jobs. Ted 
Wysocki, president and CEO of the Local Economic and Employment Development 
(LEED) Council stresses how PMDs have enabled industry in Chicago's neighborhoods 
to grow and thrive with long-term land use planning and public investment in 
infrastructure and other key supports. For example, before the Goose Island PMD was 
created in 1991, the area was home to 25 firms employing 1,000 people. Today these 
numbers have more than doubled to over 60 firms employing nearly 5,000 people. 
The LEED Council is instrumental in supporting industrial businesses and headof- 
household jobs on Chicago's near north side, and helped create many of the city's 
PMDs, including the Clybourn Corridor and Goose Island PMDs. For more information, 
contact LEED Council's Director of Economic Development, Mike Holzer at (773) 929- 
5552 x225 or at mike@leedcouncil.org 
### 










Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 23

Seattle Planning Commission July 2012 Report to Council, End Notes 

1.  Comp Plan 101 and Seattle's Comprehensive Plan webpages. 
2.  The Commission notes that the eastern portion of the proposed site as depicted in the
May 31, 2012 presentation to City Council lies outside of the Stadium Transition Area
Overlay District and is zoned Industrial General 2, which prohibits spectator sports
facilities within the Duwamish Manufacturing and Industrial Center. 
3.  Seattle Municipal Code 23.74.002 B: "There should be well-defined edges between the
pedestrian activity of the Stadium Transition Area and industrial activity surrounding it.
The portion of Fourth Avenue South that is north of Royal Brougham and the main line
railroad tracks create a strong edge to the east and should be the eastern boundary.
South Holgate Street, the first major cross street to the south of Safeco Field, should be
the southern boundary. Boundaries should not be shifted farther into the industrial
area." 
4. Governor's Container Ports Initiative: Recommendations of the Container Ports and
Land Use Work Group Main Report, January 2009, pages 1-2: "As use of port lands has
increased, our major cities face pressure to redeveloper areas that have historically
been industrial. While this urban development is attractive and provides many benefits,
it cannot be sustained without parallel industrial economic developmentcompeting
visions for the use of our industrial shorelines, conflicts between high-traffic trucking
corridors and pedestrian-friendly neighborhood redevelopment, and changes in zoning
that push warehouse and distribution centers away from designated harbor areas, have
the potential to significantly impair port operations and limit future economic
development opportunities." The Future of Seattle's Industrial Lands, Seattle Planning
Commission, 2007, page 7: "Pressure on industrial lands, a phenomenon not unique to
Seattle, is a major concern for many industrial business ownersthis pressure is pushing
land costs up, forcing businesses out of Seattle or limiting their opportunities to expand,
and promoting the increasing number of requests for the conversion of industrial lands
to non-industrial uses." 
5.  PSRC Vision 2040 and King County Countywide Planning Policies provide regional
guidance for Seattle's Comprehensive Plans as required by the State Growth
Management Act. Manufacturing and Industrial Centers are regional designations of
"locations for increased employment" and a key aspect of the Regional Growth Strategy. 
6. "Regional manufacturing industrial centers are locations of more intensive industrial
activity. These centers are characterized by large contiguous blocks served by the
region's major transportation infrastructure, including roads, rail, and port facilities.
VISION 2040 discourages non-supportive land uses in regional manufacturing industrial
centers, such as retail, non-related offices, or housing, in order to preserve the basic
sector industries located in these centers. These centers are expected to accommodate
a significant share of the region's manufacturing employment growth." 
7.  King County Countywide Planning Policies: "Manufacturing/Industrial Employment
Centers are key components of the regional economy. These areas are characterized by
Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 24

a significant amount of manufacturing, industrial, and advanced technology
employment. They differ from other employment areas, such as business/office parks,
in that a land base and the segregation of major non-manufacturing uses are essential
elements of their operation." 
8.  Seattle Municipal Code 23.74 Stadium Transition Area Overlay District. As noted in ii
above, the eastern portion of the proposed site appears to be outside of the transition
area. 
9. 
10. Seattle Municipal Code 23.50 Industrial. 
11. City of Seattle's Street Vacation Policies, amended July 2009, page 4: "There is no right
under the land use code or elsewhere to vacate or to develop public right-of-way. In
order to do so, a discretionary legislative approval must be obtained from the City
Council and, under State law, the Council may not vacate right-of-way unless it
determines that to do so is in the public interestthe Council is not bound by land use
policies and codes in making street vacation decisions and may condition or deny
vacations as necessary to protect the public interest. The City will generally deny
vacations as necessary to protect the public interest. The City will generally not support
vacations that do not advance City planning goals, particularly if inconsistent with the
desired intensity of development and preferred uses." 
12. Greater Duwamish Manufacturing and Industrial Center Neighborhood Plan, April 27,
1999, page i. 
13. RCW 36.70A.085 requires the container port element for Seattle's Comprehensive Plan.
Findings  Intent  2009 c514: "(1) The legislature finds that Washington's marine
container ports operate within a complex system of marine terminal operations, truck
and train transportation corridors, and industrial services that together support a critical
amount of our state and national economy, including key parts of our state's
manufacturing and agricultural sectors, and directly create thousands of high-wage jobs
throughout our region. (2) The legislature further finds that the container port services
are increasingly challenged by the conversion of industrial properties to nonindustrial
uses, leading to competing and incompatible uses that can hinder port operations,
restrict efficient movement of freight, and limit the opportunity for improvements to
existing port-related facilities. (3) It is the intent of the legislature to ensure that local
land use decisions are made in consideration of the long-term and widespread
economic contribution of our international container ports and related industrial lands
and transportation systems, and to ensure that container ports continue to function
effectively alongside vibrant city waterfronts." 
14. Puget Sound Regional Council 2002 Urban Centers Report Duwamish
Manufacturing/Industrial Center, page 2: "The regional significance of the Greater
Duwamish Manufacturing and Industrial Center to the City of Seattle and the Puget
Sound Region cannot be overemphasizedThe Duwamish MIC provides the largest 
concentration of family wage jobs in the Puget Sound region, generating enormous tax
and export revenuesThe MIC is a vital international trade and transportation
crossroads, receiving and distributing goods via roadway, water, rail and air. Its ability to

Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 25

provide multiple modes of transportation represents a unique asset to the region and
an enhancement to the local business environment." 
15. King County Countywide Planning Policies, updated December 2010: FW-15, FW-16, LU-
51, LU-52, LU-54, LU-58, and LU-60. 
16. Seattle Comprehensive Plan, Urban Village Element: UVG23 Promote the use of
industrial land for industrial purposes. UV21 Promote manufacturing and industrial
employment growth, including manufacturing uses, advanced technology industries,
and a wide range of industrial-related commercial functions, such as warehouse and
distribution activities, in manufacturing/industrial centers. UV22 Strive to retain and
expand existing manufacturing and industrial activity. UV23 Maintain land that is
uniquely accessible to water, rail, and regional highways for continued industrial use.
UV24 Limit in manufacturing/industrial areas those commercial or residential uses that
are unrelated to the industrial function, that occur at intensities posting short- and longterm
conflicts for industrial uses, or that threaten to convert significant amounts of
industrial land to non-industrial uses. 
17. Legislative/Executive Staff Report on the Stadium Transition Area, page 4: "Over the last
five years, there has been intense development in this area, including the construction
of Safeco Field and the Seattle Exhibition Center and the issuance of permits for the
Football StadiumThe change in development pattern and intensity justifies a re-
evaluation of the zone criteria as applied to the siterecommendations include a strong
connection between this area and downtown, while maintaining a clear separation
between the fairly intense commercial development occurring at the north end of the
Manufacturing and Industrial Center and the industrial area further south." 
18. RCW 36.70A.085 finding (2). Director's Report on the Mayor's Recommended
Comprehensive Plan 2011 Annual Amendments, City of Seattle Department of Planning
and Development, November 2011, page 4. 
19. Basic Industries Economic Impact Analysis, City of Seattle Office of Economic
Development, July 2009, pages 27, 32-33. 
20. Governor's Container Ports Initiative: Recommendations of the Container Ports and
Land Use Work Group Main Report, January 2009, page ii. 
21. America's Container Ports: Linking Markets at Home and Abroad, U.S. Department of
Transportation Research and Innovative Technology Administration, January 2011, page
6, table 1. 
22. Ordinance 123854 adopted the new Container Port Element of Seattle's Comprehensive
Plan, relevant policies include: LU3, LU5, L7, ED1, and ED2. 


Steinbrueck Urban Strategies, LLC
REPORT TO THE PORT OF SEATTLE ON SODO ARENA      August 7, 2012  Page 26

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.