7a

PORT OF SEATTLE 
MEMORANDUM 
COMMISSION AGENDA               Item No.       7a 
STAFF BRIEFING             Date of Meeting    July 24, 2012 

DATE:    July 17, 2012 
TO:     Tay Yoshitani, Chief Executive Officer 
FROM:    Michael Burke, Director, Seaport Leasing and Asset Management 
SUBJECT:  Exchange of Real Property with the BNSF Railway Company at Terminal 5. 
SYNOPSIS: 
The Port of Seattle (Port) and BNSF Railway Company (BNSF) entered into a Memorandum of
Agreement (MOA) and a Letter Agreement (Agreement) on May 31, 1994. Pursuant to the 
Agreements, the Port and BNSF have certain obligations in connection with the exchange of 
property between the parties. Specifically, in exchange for BNSF's agreement to provide the 
property requested by the Port for the expansion of Terminal 5, the Port agreed to provide 
BNSF with replacement property and track of sufficient space and condition to support existing 
rail operations and required operating capacity to support shipping at BNSF's Buckley Yard.
The Port and BNSF are now ready to enter into an Exchange Agreement (Exchange Agreement)
and complete the exchange of property contemplated in the Agreements. The value of land and
easements that the Port will convey and grant to BNSF is $8,814,000. The value of land and
easements that BNSF will convey and grant to the Port is $7,323,500. The net difference in the
exchange is $1,490,500 worth of property rights in favor of BNSF. 
The Exchange Agreement includes the following: 
The Port will convey 10.97 acres to BNSF together with all right, title and interest 
of the Port  to  those  un-vacated  streets  and  alleys  abutting  the Port  property 
conveyed to BNSF. 
BNSF will convey to the Port 9.33 acres. 

BACKGROUND: 
In the early 1990s, American President Lines (APL) put out a request for proposals (RFP) for an
expanded gateway to complement its facility in Southern California.  At that time, the
competition was between Oakland, Tacoma,  and Seattle. The existing configuration at
Terminal 5 did not meet the requirements of the RFP due to the limitations of terminal size with
the existing BNSF West Seattle yard. The Port developed a proposed terminal that met APL's
requirements by proposing to relocate the BNSF yard west and making that yard parallel with
the Terminal 5 dock. This proposed relocation put a bend in the BNSF yard reducing its
efficiency. Since the Port had no condemnation rights over a railroad it was necessary to reach

COMMISSION AGENDA 
Tay Yoshitani, Chief Executive Officer 
July 17, 2012 
Page 2 of 2 
agreement with BNSF on the land swap and yard relocation. Without this agreement, there
would have been no Terminal 5 expansion. 
The executed agreements in 1994 were the starting point for a set of extremely complex
business relationships between BNSF, competitor railway Union Pacific, and the City of Seattle 
requirements to accommodate the relocation by stipulating the terms for future street vacations 
to accommodate the improvements to Terminal 5. Due to the foregoing, including statemandated
environmental impact review and the magnitude of the rail yard relocation, it is not
unusual for railway relocations to take a long time to complete. A substantive and relevant
issue embedded in the business relationships includes the fact that BNSF was not compelled to
complete this transaction, and in fact, had little motivation or business requirements to pursue
this change to its operating rail "footprint."
The $1,490,500 worth of property rights in favor of BNSF represents the value of the additional 
land and easements needed to provide BNSF with operationally equivalent replacement property 
of sufficient space, track radius, and condition to support existing rail operations and future port
capacity at BNSF's Buckley Yard in accordance with the Agreements. The imbalance in the 
amount of land being exchanged between the parties (an additional 1.64 acres of land in favor of 
BNSF) is a result of the reconfiguration of the rail yard within the Buckley Yard by the Port. 
The Port has also agreed to pay closing costs associated with the land exchange, as additional
consideration to induce BNSF to complete the exchange. Specifically, the Port will pay the
excise tax on the land being transferred from BNSF to the Port in the estimated amount of
$130,000 and the Port will pay BNSF's share of the recording and escrow fee in the estimated
amount of $1,600. BNSF will reimburse the Port $ 111,000 for half of the Port's survey related
expenses associated with engineering and survey work. 

OTHER DOCUMENTS ASSOCIATED WITH THIS BRIEFING: 
PowerPoint Presentation. 

PREVIOUS COMMISSION ACTIONS OR BRIEFINGS: 
June 22, 1993  the Port Commission authorized the Executive Director to execute both the
Sixth Amendment to Lease No. L-1648 with American President Lines, Ltd, and the 
Memorandum of Agreement with Burlington Northern Railroad.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.