7c supp
ITEM NO: ______7c_Supp_______ DATE OF MEETING: May 22, 2012 Powenir \rgm \\x\ 5 "(El/3.9 an, MOM 1/) (5:14". MM . 8:233: p:"a""'//'Vacamonto' a w-" 43173)" f1 'i ""6"" "am ocus H a Pans 9 Ida do! ~{f R" Santiago, / Chme'. Gulf Of Y' .s COLOMBIA Port= of Seattle Built from 1904 to 1914 51 mile long passage connecting the Atlantic through the Caribbean to the Pacific Saves 8,000 miles from journey around southern tip of South America Panama Canal expansion project to add two new sets of locks and widen and deepen the navigation channels Cost of the expansion project is $5.2 billion Expansion project will double the Canal's capacity Expansion project to be completed in 2014 - 2015 Pre-expansion: Panamax vessel 5,000 TEUs After expansion: Post-Panamax vessel 12,000 13,000 TEUs Original Control Room from 1914 Modern Control Room ' Er'! ll" (r-\1L\' l()('K.\ P\\A\\1-\ Cr\\,-\l Panama City Skyhne
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.