Item 6d map
Item Number: 6d_map Attachment A- Date of Meeting: January 12, 2010 2010 Airfield Improvement Projects, Contract 2 SOUTH 160TH BRIDGE REMOVAL STORM WATER POND MILLER CREEK MODIFICATIONS ENHANCEMENTS SDS6/7 VAULT MODIFICATIONS STORM WATER POND MODIFICATIONS CONTRACT 2
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.