6b Supp
ITEM NO: _6b_Supp___ DATE OF MEETING: August 3, 2010 Terminal 91 Fender System Improvements (CIP C800183, Project 104251) Project Location Proposed Fender Improvement area Terminal 91 - Fender System Improvements 2 Project Location Terminal 91 - Fender System Improvements 3 Existing Conditions Current Fender Systems with Steel Camel Barges Terminal 91 - Fender System Improvements 4 Existing Conditions Deterioration of Existing Timber system (East Berth) Terminal 91 - Fender System Improvements 5 Existing Conditions Steel Reinforcement Pile Placement August 2009 Terminal 91 - Fender System Improvements 6 Proposed Terminal 91 Fender System Improvements Project Key Points Requesting Authorization for: Full evaluation and design of both berths for cruise, fishing & industrial use Apply for all required permits First phase of construction (15-18 piles) Competitive procurement of replacement camel barges Remaining Construction funding approval will be requested in Q2 2011 All Construction scheduled to be completed by Spring 2012 North Harbor Island Mooring Dolphins 7 Terminal 91 - Fender System Improvements 8
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.