6e TSA Letter
us. Depart-eel "lie-dud so:"u, Arm-sun. VA2mm November 09, 2018 Christian Saelaska Port of Seattle Seattle. WA Christian, units to TSA time schedule for deploying 568 TSA was operating under an aggressive was to install 14 units in checkpoints nationwide. Specifically to SEA the effort site The original schedule was for SEA was to start an expedited manner. 23. Due to the (required) and install an AIT for August preparations for August 19 the structural and Port of Seattle to review and approve long leads times for the an - all stakeholders agreed to support electrical plans for the AIT deployments a 5 week (site prep and aggressive schedule. The compressed schedule involved work on Monday, September 26 for two installation) schedule starting with the prep on Monday, October movement and AIT installations weeks, going into active equipment 2 and then concurrently with Checkpoints 3, the plan 11 with Checkpoint 4 running and funding - excluding AITs while doubling the resources was to install all (14) (14) AIT installations while punch list items. In summary, mission accomplished for (by twice the cost) for construction. management and exceeding the planned budget administrative costs, etc... ' Thanks, Harold Harold Heckstell Regional Deployment Manager Passenger Screening Program o)571-227-3874 C)202-573-5338
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.