6b ADR Tenant Reimbursement Presentation
Item No. __6b_supp Meeting Date: October 22, 2019 Airport Dining and Retail (ADR) Tenant Reimbursement Authorization Commission 10/22/2019 Overview Airport Dining Retail (ADR) Master Plan Impacts of Rapid Increase in Passengers since 2014 Current and future locations of impacted ADR Tenants Requesting Commission authorization 2 ADR Master Plan The ADR Master Plan, developed in 2013-2014, had a number of goals: Increase food and beverage service pre-security South Esplanade Gina Marie Lindsay Arrivals Hall Expand retail business in the Central Terminal 3 Impacts of Rapid Enplanement Growth since 2014 Enplanements have increased nearly 40% This growth has impacted all parts of the Airport, creating a need for facility and operational changes long security lines affecting ability to access ADR units near checkpoints need for increased checkpoint throughput inadequate infrastructure 4 Current locations of impacted ADR Tenants South Esplanade, Central Terminal and Concourse D 5 Current locations of impacted ADR Tenants Gina Marie Lindsey Hall 6 Future locations of impacted ADR Tenants North Satellite 7 Requesting Commission Authorization Reimburse six tenants for costs spent to date on design of units for a total amount not to exceed $796,000 Move tenants to comparable locations if they so choose Amend leases as necessary 8
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.