8b - T-91 pier improvements presentation
Item No.: 8b_Supp Meeting Date: January 7, 2020 Terminal 91 Berth 6 & 8 Replacement Kenneth Lyles Director, Fishing and Commercial Operations Mark Longridge Capital Project Manager Project Location 2 Demand for Berths Increasing 3 Vessel Size Increasing 4 Current Condition 1000% of pier load restricted 30% of pier condemned (no vehicle traffic) 5 Current Condition Creosote Timber Construction Significant underdock and fender deterioration 6 Proposed Replacement 7 Initial Project Schedule Design Funding Authorization: Q1 2020 Design Contract Executed:Q3 2020 Design and Permitting Complete, Construction Funding Authorization: Q2 2022 Construction Contract Advertisement Award: Q3 2022 Construction Complete: Q3 2023 8 Capital Improvement Plan Status & Certainty ty in rta ce n of U e re g e D 9 Questions? 10
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.