7c Presentation Port-wide CIP Changes

Attachment A 
Changes to the Port-wide FY2020-2024 
Capital Improvement Plan 

FY20-21 Projects to Accelerate 
Terminal 46 North Pier Structure Replacement 
North Satellite Modernization 
International Arrivals Facility 
2020 Airfield Pavement 
Passenger Loading Bridges 
SSAT Infrastructure HVAC 
FY20-21 Projects to Continue 
Fisherman's Terminal Gateway Building 
Terminal 91 Berth 6 & 8 redevelopment 
Terminal 117 restoration 
Pier 66 Shore Power 
Baggage Optimization Phase 1 
Service Tunnel Renewal/Replacement 
Airline Offices & Restrooms 
Restrooms Ph 3 
VFD Replacements 
RCF Pavement 
JOC Projects 
West Side Fire Station 
Lora Lake Site Improvements 
AOA Perimeter Fence 
Airfield Improvements and Pavement Replacement 
SBM Customer Service Facilities & Paving 
P66 Interior Modernization 
T117 Restoration 
JOC Noise Remedy 
North Terminal Utilities 
AF Bird Deterrent 
C1 Bldg 


Terminal 46 (design planning and site investigation)

Other AV Projects: 
o  Restroom upgrades in Concourse B, C &D (phase 4 &5) 
o  Main Terminal Sprinkler System, Smoke Control & Emergency Power Generator
Installation 
o  Main Terminal Low Voltage System Upgrade 
o  Concourse B, C & D HVAC Upgrade and Smoke Control 
o  Airfield Pavement Replacement Project 
o  Checkpoint 1 Relocation 
o  Shared Kitchens 
o  Interim Westside Fire Station 
o  Terminal Solid Waste Improvements 
o  Building Controls Upgrade 
o  Combined Communication & 911 Center Generator Control 
o  Emergency Generator Control Renewal/Replacement 
o  South 188th Street Tunnel Lighting 
o  ARC Flash Hazard Mitigation 
o  Air Cargo Truck Staging Yard 
o  Concourse B, C & D low voltage upgrade 
o  Satellite Train System Train Controls 
o  C11 Passenger Loading Bridge 
o  Parking Garage Elevator Modernization Construction 
o  Remote Aircraft Deicing 
o  Condominium Sound Insulation 
o  Checked Baggage Optimization Phase 2 
o  Terminal Security Enhancements Phase II 
o  eGSE Charging Stations (Phase 2B  Concourse B and South Satellite) 
o  Various others  7 scheduled 
Maritime Innovation Center 
Terminal 91 Northwest Fender 
Terminal 102 HIM E Dock 
Terminal 91 Cruise Gangway 
Jack Block Park Pier 
Shilshole Bay Marina Dock X Pier replacement 
Terminal 91 Uplands development 
World Trade Center HVAC replacement 
Pier 66 HVAC systems upgrade 
Pier 66 Roof Upgrade 
Central Waterfront Bridge Elevator modernization 
West Waterway Deepening 
Terminal 5 Pile Removal Net Tie-Off Piles 
$5.5 million in small projects, $5.4 million in fleet projects, $8.1 million in joint venture
spending, and $1.4 million in stormwater utility capital spending

FY20-21 Projects to Defer 
New Cruise Terminal 
Aviation projects 
o  3 noise projects 
o  4 landside projects 
o  1 ICT project 
o  13 infrastructure projects 
o  4 airfield projects 
o  8 corporate projects 
o  14 terminal/tenant projects 
o  6 other projects 
Salmon Bay Marina Docks D & E replacement 
Pier 66 Fender Upgrades 
Bell Harbor Marina Pile Wraps 
Shilshole Bay Marina restaurant site 
World Trade Center/Garage elevator upgrades 
Pier 69 clerestory/skylight replacement 
$1.7 million in small projects, $2.4 million in fleet projects and $1.6 million in
stormwater utility capital spending

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.