6d Presentation, Central Waterfront Elevator Modernization
Item No.: 6d_Supp Meeting Date: August 11, 2020 Central Waterfront- Lenora and Bell Street Elevator Modernizations Rod Jackson, Capital Project Manager James Truhan, Real Estate Manager Action Requested Authorize Design and Construction funding 2 PIER 69 Bell Street PIER 66 ELEVATOR LOCATION Lenora and Bell Street Elevator Lenora St ELEVATOR Location and Vicinity LOCATION Background Lenora and Bell Street elevators are 20 and 22 years old. Completed Lenora street elevator construction in 1998. Completed Bell street elevator construction in 1999. Critical elevator components are nearing the end of their programmed service lives and will need modernization. Elevator upgrades coincide with the City of Seattle closure schedule for the Lenora street pedestrian bridge. 4 Contracting Method and Schedule Building Engineering Systems (BES) Contract Based on lessons learned from other BES projects Port will provide performance specs and contractor will design and construct Opportunities for efficiency, quality, and innovation Women and Minority Business Enterprise (WMBE) goal of 4% Schedule September 2020 Q4/2020: Advertise, award, and execute BES contract Q1/2021 : Design start Q4/2021: Construction start Q2/2022: In-Use date 5 Questions? 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.