8b Presentation Wi-Fi Improvements Project
Item No. 8b_supp Meeting Date: February 23, 2021 Wi-Fi Improvements Project Commission Presentation February 23, 2021 1 PROJECT OVERVIEW 2 Wi-Fi Improvements Project Significantly improves Wi-Fi coverage & performance throughout the terminal Improves the Port's ASQ score Benefits the Port and the Airport's passengers, airlines & tenants Improves network connectivity and Wi-Fi coverage on the ramp for Airline & Port ramp operations 3 Terminal Wi-Fi: ASQ Score & Download Speed 4 Wireless Access Points (WAP) Terminal Wi-Fi Access Points Ramp / PLB Wi-Fi Access Points 5 Micro-Distribution Cabinet (MDC) Each MDC provides connectivity to the Airport's communication infrastructure backbone system Designed and developed to implement PLB Wi-Fi capacity Provides high-performance network access for future Port and Airline ramp operations 6 Ramp Wi-Fi supports mobile devices used by personnel and vehicles WAP for above-thewing operations WAP for below-thewing operations Antennas are oriented so that the signal can reach between the rear door and the tail of the aircraft where most of the Wi-Fi use will take place. 7 Wi-Fi Improvements Project: Overview Package 1 Concourse C Ramp and Interior Completed Package 2 Concourse A, B, D, South Satellite Exterior Completed Package 3 South Satellite Interior Completed Package 4 Concourse D Interior Completed Package 5 Central Terminal; Ticketing Completed Package 6 Bag Claim; Bagwell; Gina Marie Lindsey Hall Completed Package 7 Passenger Loading Bridges at Concourses A, B, C, D and S Satellite Requesting funding Package 8 Passenger Loading Bridges at North Satellite Requesting funding 8 Wi-Fi Improvements Project: Revised Scope of Work 9 Changes Requiring Additional Budget Additional funds needed to complete construction of the remaining Wi-Fi work on the PLBs at Concourses A, B, C, D and South Satellite as the work was more complicated than initially planned Additional funds needed to complete a portion of the design and construction of North Satellite Modernization project's Wi-Fi work 10 BUDGET & AUTHORIZATION REQUEST 11 Schedule Activity Quarter Package 7 Construction Start: PLB Wi-Fi at all concourses except NSAT Q2 2021 Package 8 Design Start: PLB Wi-Fi at NSAT Q2 2021 Phase 8 Design Complete Q4 2021 Phase 8 Commission Authorization for Construction Q4 2021 Phase 7 Construction Complete Q3 2022 Phase 8 Construction Complete Q3 2022 Phase 7 & 8 Close-Out Q2 2023 12 Requested Revised Project Budget Authorizations Project Budget Original Budget (2014 Capital + Expense) $ 9,880,000 Previous Budget Addition $ 561,000 Current Authorized Budget (Capital + Expense) $ 10,441,000 Additional Budget to Authorize $ 6,000,000 Total Budget $ 16,441,000 13 CONCLUDES PRESENTATION 14
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.