8e. Presentation - IAF Maintenance Path Fence
Item No. 8e_supp Date of Meeting May 11, 2021 IAF Path Maintenance Fence Design and Construction Authorization Project Scope Scope Items: Temporary construction fence 8' Tall Security Anti-Climb Fence Removal of existing temporary bus turnaround Associated grading, retaining wall, landscaping 2 Existing Facility Conditions Temporary Bus Turnaround Fence Terminus Maintenance Path and IAF 3 Project Budget and Schedule No changes in project budget. Original Budget: $ 1,214,000 Revised Budget: $ 1,214,000 Key Schedule Milestones: Design Complete: Q3 2021 Construction Start Q4 2021 In-Use Date Q2 2022 4 Lessons Learned from Previous Projects Past Lesson Learned Project Application Slope was too steep to Building a retaining wall to reduce slope support landscaping steepness improvements No access control standards Confirmed gates and locks will be manually for fencing operated - no access control included 5 Project Risks Risk Description Probability Impact Mitigation Plan IAF removes IAF removing High Low PCS is coordinating temporary fence temporary fence with IAF project and would leave the area will install temporary unsecured fencing IAF schedule IAF delays would Medium Medium Coordinating schedule delay delay construction of with IAF project this project 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.