8e. Presentation - IAF Maintenance Path Fence

Item No.          8e_supp
Date of Meeting        May 11, 2021
IAF Path Maintenance Fence
Design and Construction
Authorization

Project Scope
Scope Items:
Temporary construction fence
8' Tall Security Anti-Climb Fence
Removal of existing temporary
bus turnaround
Associated grading, retaining wall,
landscaping


2

Existing Facility Conditions


Temporary Bus Turnaround              Fence Terminus               Maintenance Path and IAF


3

Project Budget and Schedule
No changes in project budget.
Original Budget: $ 1,214,000
Revised Budget: $ 1,214,000
Key Schedule Milestones:
Design Complete: Q3 2021
Construction Start Q4 2021
In-Use Date Q2 2022

4

Lessons Learned from Previous Projects
Past Lesson Learned                 Project Application
Slope was too steep to         Building a retaining wall to reduce slope
support landscaping           steepness
improvements
No access control standards    Confirmed gates and locks will be manually
for fencing                      operated - no access control included


5

Project Risks
Risk            Description      Probability  Impact     Mitigation Plan
IAF removes      IAF removing           High      Low   PCS is coordinating
temporary fence  temporary fence                          with IAF project and
would leave the area                        will install temporary
unsecured                              fencing
IAF schedule      IAF delays would       Medium   Medium Coordinating schedule
delay             delay construction of                       with IAF project
this project


6

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.