10a. Attachment 2 - Map and Site Survey
Item No. 10a attach2 ONE WAY SOUTH BOUND ACCESS TO E. MARGINAL WAY S. Date of Me eting May 25, 2021 T 10 6 D E V E L O P M E N T S I TE ROW OPTION G - CLEAN CON-GLOBAL Passenger Car (P) Passenger Car (P) Interstate Semitrailer (WB-62) SITE INFORMATION NOTES: 1. THIS SITE PLAN IS OF SCHEMATIC DESIGN ONLY AND BASED ON KING COUNTY ASSESSOR BOUNDARY DATA.NO GROSS SITE AREA (PARCEL) = 31.23 ACRES PROFESSIONAL SURVEY HAS BEEN PERFORMED. 6) 2. INNOVA PROVIDES SITE FEASIBILITY, CIVIL ENGINEERING AND ARCHITECTURE FOR INDUSTRIAL PROPERTIES. THERE DEVELOPMENT SITE AREA = 15.07 ACRES IS NO CONFLICT OF INTEREST TO WORK WITH DEVELOPERS ON THESE PORT OWNED PROPERTIES. THEREFORE 6) INNOVA WELCOMES DEVELOPERS TO CONTACT US FOR QUESTIONS, ASSISTANCE AND CONSULTATION DURING B-67) (W r le Interstate Semitrai ZONING (CITY OF SEATTLE) = IG-1/U85 BOTH THE FEASIBILITY PERIOD AS WELL AS DURING THE PROJECT DESIGN PERIOD FOR THESE PROPERTIES. OPTION G W/ VEHICLE TURNING SCALE: 1" = 100' (PRINTED 22x34) (1' = 200' PRINTED 11x17) N INNOVA architects PORT OF SEATTLE Project: A0T 950 Pacific Avenue, Suite 450 2711 Alaskan Way PORT OF SEATTLE Tacoma, WA 98402 Seattle, WA 98121 TERMINAL 106 Date: 12/30/2020 253-572-4903 206-787-3000 Scale: AS NOTED PAGE: *
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.