8b. Presentation - Snow Storage Expansion Project
Item No. 8b_supp Meeting Date: October 26, 2021 Snow Storage Expansion Project (C801171) Mike Tasker & Chris Coulter AVPMG C801171 October 26, 2021 Action Requested Request Commission authorization to design and prepare construction documents for the Snow Storage Expansion Project (CIP 801171) at Seattle Tacoma International Airport. The total request for this action will be $2,500,000 for a total project authorization to date of $2,794,000. The estimated overall cost of the project is $17,500,000. 2 Project Overview This is a regulatory project Provide Additional Snow Storage Capacity Connected to Industrial Waste System (IWS) Existing capacity is inadequate All snow melt areas must be connected to IWS for NPDES Permit Compliance Historical excess snow storage areas now occupied by Cargo/RON aircraft Increase operational safety for snow operations vehicles Reduce operational expenses from rehandling snow Snow storage capacity at completion of the project: Target: single snowfall of 12 Inches plus 20% extra capacity for smaller storms 3 Snow Storage Expansion Sites 4 Scope Summary Phase 1-2023 Construction North Snow Storage Area Expand existing asphalt pad and upgrade the IWS Pump Station South Snow Storage Area* Expand existing truck turnaround for maneuverability and safety Vehicle Service Road (south and west of RW 34R) Widen asphalt surface for snow removal vehicle safety Phase 2-2024 Construction Construct New Storage Area NE of Lagoon 3 Includes wetland mitigation *SAMP TW A/B project will remove this snow storage area, decreasing overall capacity by 10,000 CY 5 Construction Schedule Phase 1 Commission Authorization for Construction Q4 2022 Issue Notice to Proceed: Q1 2023 In-Service: Q4 2023 Phase 2 Commission Authorization for Construction Q4 2023 Issue Notice to Proceed: Q1 2024 In-Service Q4 2024 6 Budget Snow Storage Expansion This Request Total Program Project (C801171) Design $2,500,000 $2,794,000 Construction $0 $14,706,000 Total $2,500,000 $17,500,000 7 Project Risks RISK DESCRIPTION PROBLEM IMPACT MITIGATION PLAN Permitting Delays Wetland permit and mitigation Med Med Separate design schedule for implementation could delay Phase 2 that allows for construction of Phase 2 permitting and agency negotiation period Increased Cost Wetland permit conditions and Med High Increase project contingency mitigation requirements will be due to risk. further refined during design phase affecting potential cost of mitigation Unforeseen Site Possible conditions include: Med Med Implement monitoring and Conditions Buried debris action plan for construction for Archaeological possible discoveries. Unsuitable soil conditions 8 Project Opportunities Support other program scopes and schedules Airfield Pavement and Supporting Infrastructure Replacement Program Perimeter Intrusion detection System (PIDS) Mid-field Checkpoints Reduce operational impacts and safety risks by bundling 9
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.