10a. Presentation - Duty Free Request for Proposal Authorization

Item No. 10a, 10b Supp
Meeting Date: October 26, 2021

Duty Free & SEA Vision

Lance Lyttle

Long Term Visions for the Airport
New "Hot-Spots" @ SEA

Maximizing Non-Aeronautical Revenues to Support SEA Goals
GHG
Reduction

SOV
Reduction

New
Technology

Airport Dining and Retail
Duty-Free RFP

Request for Proposal Authorization

Airport Dining and Retail
This proposal aims to expand the
leasable space for Duty-Free making it a
more viable business model for bidders.
The Duty-Free Master Plan aligns with
the Port's Century Agenda goals:
A highly effective public agency
Becoming a national model for
Equity, Diversity and Inclusion
Strengthening the
competitiveness of SEA in the
regional and global marketplace

Duty-Free Background
Duty Free, Currency Exchange, and Vending were not included in the 2012
Master Plan.
Commission recently approved a temporary Duty-Free contract as an
equitable solution for a longstanding underachieving category within the
ADR program which has been heavily impacted by international tariffs and a
post-pandemic slow return to international passenger traffic.
Duty-Free at SEA has been an underperforming category due to the lack of
required square footage required to secure the brand names needed to
meet international passenger demand.
Duty-Free at SEA currently ranks 13 out of 22 in overall
Duty-Free space at large hub airports in the U.S.
Current Duty-Free operator will remain in operation during the design and
construction phases of the Concourse A
Duty-Free project.

Duty-Free RFP Locations
South Satellite             Concourse A
Concourse A South
Renovation            Walk-Through

Duty-Free RFP Impacts

Location near Checkpoint
4/Concourse D will be eliminated
from the Duty-Free RFP as this
location is impacted by another
capital project.

Concourse A Duty-Free
Funding Request for Project
Definition Document

Concourse A Duty-Free Project Scope
Create a walk-through Duty-Free on Concourse A,
adjacent to IAF exit for connecting passengers.
Provide 11,000 sq. ft. of new Duty-Free retail
space.
Design opportunities for retail, small businesses
and a performance stage.
Secure retail with a structural lid, adding 3,500 sq.
ft. expansion to Port Conference Center at SEA.
Security improvements including automated exit
doors and security glass.

Project Roadmap
1. Conceptual Planning
Phase 1: Concept Refinement
We are here
2. Project Definition Document
Phase 2: 15% Design
3. Duty-Free Vendor RFP Authorization             Commission Authorization for Vendor RFP (Oct 26, 2021)

4. Design                             Commission Authorization for Design (Target Q3 2022)

5. Duty-Free Vendor Awarded                  Target Q4 2022

6. Building Construction                     Commission Authorization for Construction (Target Q3 2023)

7. Activation                           Target Q3 2026

11

PDD Phases: Scope of Work
Phase 1                      Phase 2
(Completed using staff authorization)  (Requesting authorization today)
Duty-Free Space Program     Preferred Concept
Development                Refinements
Mezzanine Level Concept     Implementation Plan
Development                (phasing, schedule, estimate)
Business Case (in-house)      Project Definition Document

Concourse Level

Existing Conditions


AOB Elevators

IAF Exit
GML Atrium
IAF
14

Concept                                                           15

@ ARAYA                     Fos   | Fpl
ih, WEE                 i-)                           =im                i
:
Em, 3 J    AEAT    jo                            1
2 RY  yy   z               A CONA   -282
aliaa    Ww AS   A                 }
1= A  k .      "G 1-5  Area 3    5620
> '! wi                or                         Ie   a
&%                                                                             Circulation           3.800
.          A                     ">(0)m       .
A                v
)                                 EXIT
> @
.                                                                                           i      i                                  '                                              Total sq ft                      15,073
CaMires4 _
~/
w
i. 4 ef
>                               BL
BRN               3    Vinh. <                           YES
8                           SORT

"
#      J           :        |
-      7   E :  :  "  \      J
Arpad        ALS wu    |
%y
:             Le

IAF EXIT

INFORMATION
SERVICE DESK


EGRESS STAIR

Concept

Exiting IAF to North (Toward Checkpoint 2)

Exiting IAF to South (A6-A14)

Mezzanine Level

Mezzanine Lid Concept

Duty Free Lid/
Mezzanine Expansion




GML Hall

Mezzanine Level Concept

MEZZANINE EXPANSION

Conference Center / Mezzanine Expansion

Egress Stair with Potential Media Wall

Project Costs &
Business Case

Project Costs
$24M - $42M
(Current CIP Budget $33.4M)
Will update cost estimate after PDD Completion (15% design).
Base Building Changes Only
Duty-Free on Concourse
Mezzanine Lid & Structural Framing
Automated Exit Lanes
Egress Stair Construction
Video Media Wall
Art 1%
Lease buy-out allowance

Cone of Certainty

We are here

Business
Case

Questions?

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.