Transcript

The Special meeting scheduled for 2021-08-10 at Remote

  • GOOD MORNING
  • THIS IS COMMISSION PRESIDENT FRED FELLEMAN
  • CONVENING THE SPECIAL REMOTE MEETING TODAY VIA TEAMS TO COMPLY WITH SENATE CONCURRENT RESOLUTION 8402 AND IN ACCORDANCE WITH GOVERNOR INSLEE'S PROCLAMATION RESOLUTION
  • I'M SORRY
  • PROCLAMATION 2028 PRESENT WITH ME TODAY OUR COMMISSIONERS BOWMAN, CALKINS, CHO AND STEINBRUECK, WHO ARE CURRENTLY GATHERED AT THE EXECUTIVE SESSION LINE AWAITING THE OPENING OF THE MEETING
  • THAT'S THE PUBLIC MEETING
  • WE'LL IMMEDIATELY RECESS INTO EXECUTIVE SESSION TO DISCUSS TWO ITEMS REGARDING LITIGATION OR POTENTIAL LITIGATION OR LEGAL RISK PER RCW 30.110.1 (i) AND ONE ITEM FOR THE PERFORMANCE OF A PUBLIC EMPLOYEE PER RCW 42.30,110.1 (g) APPROXIMATELY 90 MINUTES AND WE'LL RECONVENE INTO A PUBLIC SESSION AT NOON
  • WE'LL NOW GO OVER TO EXECUTIVE SESSION
  • THANK YOU
  • COMMISSION PRESIDENT
  • I JUST WANT TO NOTE FOR THE RECORD THAT WE DO HAVE A QUORUM OVER ON THE EXECUTIVE SESSION LINE WITH COMMISSIONERS BOWMAN, CALKINS, CHOW AND STEINBRUECK AND ATTENDANCE AND THAT THIS IS THE MEETING FOR AUGUST 10 TH 2021
  • AND WE WILL SEE YOU OVER ON THE EXECUTIVE SESSION LINE
  • THANK YOU VERY MUCH
  • GOOD AFTERNOON
  • THIS IS COMMISSION PRESIDENT FRED FELLEMAN
  • RECONVENING THE SPECIAL MEETING OF AUGUST 10 TH 2021
  • THE TIME NOW IS 12:02
  • WE'RE MEETING REMOTELY TODAY VIA TEAMS TO COMPLY WITH SENATE CONCURRENT RESOLUTION 8402 AND THEN ACCORDANCE WITH GOVERNOR INSLEE'S PROCLAMATION 2028 PRESENT WITH ME TODAY OUR COMMISSIONERS CALKINS, CHO AND STEINBRUECK
  • COMMISSIONER BOWMAN WILL BE JOINING US SHORTLY
  • I'LL ASK THE CLERK TO DO ROLL CALL OF ALL COMMISSIONERS TO ENSURE EVERYONE IS ONLINE
  • CLERK HART, PLEASE
  • THANK YOU
  • WELL, WE USUALLY START WITH COMMISSIONER BOWMAN
  • WE'LL COME BACK AND WE'LL CATCH HER ANOTHER TIME WHEN SHE JOINS THE CALL
  • SO, COMMISSIONER CALKINS, COMMISSIONER CALKINS FOR THE ROLL IT STAR SIX TO UNMUTE
  • IF YOU'RE ON THE TELEPHONE
  • I'M HERE CLERK HART
  • THANK YOU, COMMISSIONER CHO PRESIDENT
  • THANK YOU
  • COMMISSIONERS STEINBRUECK, YOU'RE MUTED, SIR
  • I THINK YOU MUTED ME
  • IT'S ENTIRELY POSSIBLE, BUT I CAN'T UNMUTE YOU
  • THANK YOU
  • AND COMMISSIONER FELLEMANT
  • PRESENT
  • THANK YOU
  • WE DO HAVE A QUORUM
  • VERY GOOD
  • TODAY'S MEETING IS STRUCTURED FOR OUR VIRTUAL FORMAT
  • WE'VE MADE SPECIAL ARRANGEMENTS TO PROVIDE FOR REMOTE PARTICIPATION FOR ALL OF OUR STAFF AND COMMISSIONERS
  • LATER, WE'LL TAKE PUBLIC COMMENT FROM PEOPLE WHO ARE PARTICIPATING BY TEAMS AND WHO HAVE SIGNED UP TO SPEAK
  • ALL VOTES TODAY WILL BE TAKEN BY A ROLL CALL METHOD
  • SINCE ALL COMMISSIONERS ARE PARTICIPATING REMOTELY, THAT MEANS FOR EACH VOTE, CLERK WILL CALL EACH COMMISSIONERS, NAME COMMISSIONERS ALONG THE TEAM'S CALL
  • WE'LL MAKE SURE THEY'RE UNMUTED AND ANSWER YAY OR NAY TO BE EQUITABLE WILL ASK ALL COMMISSIONERS TO SPEAK IN TURN AND WAIT TO BE RECOGNIZED BEFORE SPEAKING AS MUCH AS POSSIBLE
  • WE'RE MEETING ON THE ANCESTRAL LANDS AND WATERS OF THE C0-SALISH PEOPLE WITH WHOM WE SHARE A COMMITMENT TO STEWARD THESE NATURAL RESOURCES FOR FUTURE GENERATIONS
  • THIS MEETING IS BEING DIGITALLY RECORDED, MAY BE VIEWED OR HEARD AT ANY TIME ON THE PORT WEBSITE, AND MAY BE REBROADCAST BY KING COUNTY TELEVISION
  • PLEASE STAND OR JOIN ME FOR THE PLEDGE OF THE ALLEGIANCE
  • NO, JUST A SECOND FOR ME
  • THE FLAG SLIDE IS NOT WANTING TO COME UP VERY READILY
  • GIVE ME JUST A MOMENT
  • I WILL LET YOU KNOW WHEN I HAVE THAT DISPLAYED
  • OKAY, THAT'S A PROBLEM
  • HANG ON A SECOND FOR ME
  • THAT'S NOT COMING UP
  • WE CAN DO IT WITHOUT THE FLAG
  • I THINK WE MIGHT HAVE TO TODAY
  • ALL RIGHT
  • I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA AND TO THE REPUBLIC FOR WHICH IT STANDS
  • ONE NATION UNDER GOD INDIVISIBLE WITH LIBERTY AND JUSTICE FOR ALL
  • THE FIRST ITEM ON BUSINESS AGENDA TODAY IS THE APPROVAL OF THE AGENDA
  • COMMISSIONERS, PLEASE UNMUTE YOURSELVES
  • I'M GOING TO ASK EACH COMMISSIONER IF YOU HAVE ANY MOTIONS TO REARRANGE THE ORDERS OF THE DAY
  • AND IF YOU DO, I'LL ASK FOR A SECOND
  • PLEASE RESPOND WHEN THE CLERK CALLS YOUR NAME
  • IF YOU HAVE NO CHANGES, JUST SAY NONE
  • CLERK HART, PLEASE CALL THE ROLL FOR ANY CHANGES TO THE AGENDA
  • THANK YOU
  • BEGINNING WITH COMMISSIONER CALKINS
  • NO CHANGES FOR ME
  • THANK YOU, COMMISSIONER CHO
  • NONE
  • THANK YOU, COMMISSIONER STEINBRUECK
  • NO CHANGES
  • THANK YOU, COMMISSIONER FELLEMAN
  • YEAH
  • I'D LIKE TO MAKE A MOTION TO REORDER THE AGENDA, TO TAKE PRESENTATIONS AND STAFF REPORTS SECTION OF THE AGENDA PRIOR TO THE NEW BUSINESS ITEMS THE REASON FOR THIS IS THAT WE HAVE A SIGNIFICANT BUDGET BRIEF DISCUSSION, AND IT'S LEFT TO THE END OF THE AGENDA CURRENTLY
  • AND GIVEN THE IMPORTANCE OF THAT DISCUSSION AND IT'S A LONG MEETING, I WAS HOPING THAT WE CAN HAVE THAT FIRST AND THEN END ON A GOOD NOTE WITH IN REGARDS TO THE SOUND INSULATION PROGRAM, RATHER THAN BEING TIRED AT THE END OF THE DAY
  • SO DO I HAVE A SECOND? SECOND
  • VERY GOOD, THEN
  • SO IF THERE'S NO FURTHER DISCUSSION ON THE MOTION TO REORDER THE AGENDA CLERK HART, PLEASE CALL THE ROLL FOR THE VOTE ON THE MOTION
  • THANK YOU
  • BEGINNING WITH COMMISSIONER CALKINS
  • AYE
  • THANK YOU, COMMISSIONER CHO
  • AYE THANK YOU, COMMISSIONER STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONER FELLEMAN
  • YES, THANK YOU
  • YOU HAVE FOUR YESSES AND ZERO NOS FOR THIS ITEM, AND THEN THE MOTION PASSES
  • COMMISSIONERS, NOW, THE QUESTION IS ON AN APPROVAL OF THE AGENDA AS AMENDED, PLEASE SAY YES OR NO WHEN YOUR NAME IS COLD
  • CLERK HART, ONCE AGAIN, THANK YOU
  • BEGINNING WITH COMMISSIONER CALKINS, CAN YOU SAY AGAIN? YES
  • THIS IS FOR APPROVAL OF THE AGENDA AS AMENDED
  • RIGHT
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONERS STEINBRUECK
  • YES
  • THANK YOU, COMMISSIONER
  • ELEMENT, YES
  • THANK YOU
  • I HAVE FOUR YESSES AND ZERO NOS FOR THIS ITEM
  • VERY GOOD
  • SO THE NEXT ITEM ON THE AGENDA IS THE EXECUTIVE REPORT
  • AND AS ALWAYS, I HAVE A FEW THINGS I'D LIKE TO SAY PRIOR TO THAT
  • MR COMMISSION PRESIDENT, BEFORE YOU GET INTO THAT, LET ME JUST NOTE FOR THE RECORD THAT THE AGENDA AS AMENDED IS APPROVED
  • AS ALWAYS, I THOUGHT VERY GOOD
  • I'M SORRY
  • SO I WOULD LIKE TO TAKE A MOMENT HERE TO RECOGNIZE THE RELEASE OF THE IPCC REPORT AND JUST QUICKLY SUMMARIZE SOME OF THE FINDINGS AND ITS IMPLICATIONS TO THE PORT
  • LAST DECADE, GLOBAL TEMPERATURES WERE THE HOTTEST ON EARTH IN OVER 125,000 YEARS, CO2 LEVELS IN 2019 THAT WERE HIGHEST SINCE 2,000,000 YEARS AGO
  • HUMANS ARE RESPONSIBLE FOR ALL PAST HUNDRED YEARS OF CLIMATE, SO TWO INCREASES THE HEAT WAVE OF EVERY 14 YEARS
  • WHAT USED TO BE EVERY 50 YEARS IS NOW HERE 14 YEARS WITH JUST 129 DEATHS LAST SUMMER FROM THE HEAT, AND THEN THE BLOB OFF THE COAST IS TO BE MORE FREQUENT, WITH SOMEWHAT ENCOURAGING THAT OCEAN ACIDIFICATION AND SURFACE TEMPERATURES COULD BE REDUCED WITH SEQUESTRATION, BUT THAT SEA LEVEL RISE WILL PERSIST FOR CENTURIES DUE TO THE MELTING GLACIERS AND EXPANDING SEAS, AS WE ALSO SAW TODAY'S PAPER THAT THE QUINAULT TRIBE WAS VISITED BY INTERIOR SECRETARY DEB HOLLAND DUE TO THE FACT THAT THEY'RE MOVING THEIR RESERVATION UPLAND DUE TO ITS INUNDATION BY SEA LEVEL RISE
  • AND CLEARLY, THIS HAS IMPLICATIONS TO THE PORT INFRASTRUCTURE AND THE NEED TO WORK WITH OTHERS ON PROJECTS THAT INVOLVED SEQUESTRATION FROM THE PLANTING OF MARINE AND TERRESTRIAL VEGETATION
  • OKAY
  • AND OBVIOUSLY, OUR FIRE SEASONS ARE GETTING LONGER AND MORE DESTRUCTIVE, AND THIS WEEK WE WILL HAVE A REVISIT OF THAT
  • [crosstalk 00:09:22] THAT'S ERIC COULD YOU PLEASE BE YOURSELF? I HAVE IT
  • ALL RIGHT
  • SO, AGAIN, FOR THE PORT, I'D LIKE TO RECOGNIZE THE LEADERSHIP OF BOTH COMMISSIONERS STEINBRUECK AND BOWMAN FOR INCLUDING THE WORD CLIMATE IN THE ENS COMMITTEE'S NAME THAT WILL BE ON TODAY'S DISCUSSION
  • WHEN I INTRODUCED THAT MOTION UPON MY SECOND COMMISSION MEETING IN 2017, I'VE ASKED TO HAVE AN ANNUAL ACCOUNTING OF THE PORT GREENHOUSE GAS EMISSIONS AND TO TO BE ABLE TO SEE HOW WE'RE MEETING OUR GOALS
  • THE COMMISSION HAS YET TO RECEIVE SUCH A PRESENTATION, AND I WAS HOPING TO HAVE ONE THIS YEAR BEFORE OUR BUDGET DISCUSSIONS SO THAT WE CAN SPEAK TO THE NEEDS TO CONTINUE TO ELEVATE OUR EFFORTS
  • AND THERE HAVE BEEN MANY
  • BUT AT THE SAME TIME, WE HAVE BEEN ON A GROWTH CURVE AND THAT THESE ACTIONS NEED TO BE LOOKED AT IN THE CONTEXT OF WHEN WE BUILD BUILDINGS AT THE AIRPORT
  • IF WE CAN DO A BILLION DOLLARS A YEAR OF EXPENDITURES AT THE AIRPORT, SO TOO CAN WE CONTINUE TO MAKE EFFORTS TO REDUCE OUR GREENHOUSE GAS FOOTPRINT LIKE WE DID WITH THE RNG CONTRACT? SO MOVING FORWARD HERE, I JUST LIKE TO POINT OUT THAT THERE'S ALSO ACTIVITIES WHILE WE MOVE FORWARD WITH THINGS THAT WE WANTED TO
  • WE HAVE TO MAKE SURE THE THINGS THAT WE HAVE DONE ARE ACTUALLY BEING COMPLIED WITH
  • AND I'M VERY DISTRESSED TO LEARN THAT FOR THE 13 YEARS OR SO THAT WE'VE HAD PRE CONDITIONED AIR APPLIED TO THE AIRPORT THAT IN FACT, DURING THE SUMMER, THIS IS RARELY TAKEN ADVANTAGE OF, IN PART BECAUSE IT'S NOT ADEQUATE TO COOL THE PLANES
  • AS I WAS JUST TOLD BY A PILOT THIS WEEKEND AND THAT WE REALLY NEED TO START MAKING TRUE COMMITMENTS TO OUR INSTITUTION OF HAVING SUSTAINABLE AVIATION FUELS AT THE AIRPORT
  • AND THAT THE WORK THAT WE'VE BEEN DOING ON THE SLOW MLU JUST REALLY ISN'T MOVING THAT BIRD
  • THAT BALL FAR ENOUGH DOWN THE FIELD
  • I'M HOPING THAT THE MSW STUDY WITH KING COUNTY WILL YIELD REAL RESULTS, AND I'M CALLING ON THE AIRLINES TO JOIN US IN THAT EFFORT IN LIEU OF THE PROGRESS WE'RE MAKING WITH REGARDS TO THE MLU AGREEMENT
  • HAVING SAID ALL THAT, OBVIOUSLY, THINGS ARE GETTING MORE AND MORE URGENT, AND I NOW LEAVE IT TO THE EXECUTIVE TO DEAL WITH THE BROADER ISSUES THAT ARE GOING ON IN THE DAY
  • THANK YOU
  • EXECUTIVE METRUCK
  • SORRY, COMMISSIONER
  • NO, I'M SORRY
  • I WAS LOOKING FOR MY ELUSIVE MUTE BUTTON
  • COMMISSIONERS, GOOD AFTERNOON
  • THE COVID 19 PANDEMIC, PARTICULARLY THE DELTA VARIANT, CONTINUES TO IMPACT US LOCALLY, NATIONALLY AND INTERNATIONALLY
  • THE STATE OF WASHINGTON, AS WELL AS KING COUNTY, HAS SEEN A TREMENDOUS SURGE AND COVID 19 CASES
  • IN FACT, IN JUST A FEW WEEKS, BOTH THE STATE AND KING COUNTY HAVE REACHED THE DESIGNATED HIGH COMMUNITY TRANSMISSION LEVEL IS DEFINED BY THE CENTERS FOR DISEASE CONTROL AND PREVENTION
  • THE PORT HAS ALSO SEEN AN UPTICK OF EMPLOYEES, CONTRACTORS AND TENANTS TESTING POSITIVE FOR THE VIRUS FOR THE MONTH OF AUGUST, WITH SEVEN CONFIRMED COVID 19 CASES
  • SIX OF THE SEVEN ARE ASSOCIATED WITH CONSTRUCTION PROJECTS, AND ONE OUT OF SEVEN REPRESENTS RETAIL AND DINING AT SEATTLE TACOMA INTERNATIONAL AIRPORT
  • THE PORT IS CLOSELY MONITORING 20 AND ONE EMPLOYEES PLACED ON QUARANTINE OR AN ISOLATION, WITH NINE FORD EMPLOYEES TESTING POSITIVE FOR THE VIRUS SINCE AUGUST 1ST ON AUGUST 4TH
  • FOLLOWING CDC RECOMMENDATIONS, THE PORT REESTABLISHED A FACE COVERING MASKING POLICY FOR INDOOR, PUBLIC AND PRIVATE AREAS AT ALL PORT FACILITIES
  • WE KNOW THAT THE LAYERING OF MEASURES MASKING VACCINATIONS AND STAYING HOME WHEN AN INDIVIDUAL IS EXPERIENCING SYMPTOMS WILL GREATLY PREVENT AND REDUCE EXPOSURES IN VIRUS SPREAD IN THE WORKPLACE
  • IN OTHER DEVELOPMENTS
  • ON MONDAY, GOVERNOR INSLEE, ACCOMPANIED BY KING COUNTY EXECUTIVE CONSTANTINE AND SEATTLE MAYOR DURKIN ANNOUNCED THE VACCINE MANDATE FOR ALLSTATE EMPLOYEES AND ALL PRIVATE SECTOR HEALTH CARE WORKERS AND THOSE IN LONGTERM CARE SETTINGS
  • THE PORT OF SEATTLE IS FULLY COMMITTED TO MAINTAINING A SAFE WORK ENVIRONMENT FOR ITS EMPLOYEES, CUSTOMERS, TENANTS AND PASSENGERS ACROSS ALL ITS FACILITIES
  • ALTHOUGH WE'RE NOT MANDATING VACCINATIONS FOR PORT EMPLOYEES AT THIS TIME, WE ARE EXAMINING THE IMPLEMENTATION AT ALL THOSE AS EXAMINING ALL OF THOSE AND THEN CONSIDERING OTHER DEVELOPMENTS AS WELL
  • WE STRONGLY ENCOURAGE EVERYONE WHO IS ABLE TO BE VACCINATED
  • TURNING YOUR ATTENTION TO CRUISE THE PAST WEEKEND, A NORWEGIAN ENCORE EMBARKED FROM PIER 66, MAKING THE SEVENTH HOME PORT, MAKING IT THE SEVENTH HOME PORT VESSEL TO BEGIN REVENUE PASSENGER OPERATIONS THUS FAR
  • PROTOCOLS PREVENT THE SPREAD OF THE VIRUS IN RESPONSE TO CONTAIN THE VIRUS IF IT IS DETECTED
  • PUT IN PLACE BY POLO CALS AGENCIES, THE PORT IN CRUISE LINES ARE WORKING
  • THE MEASURES INCLUDE REPORTING PUBLIC HEALTH AUTHORITIES ON POSITIVE TESTS, RECEIVE CONTACT TRACING AND ISOLATION QUARANTINE PROCEDURES
  • PORT THE VESSELS
  • IN RESPONSE TO THE DELTA VARIANT, CRUISE LINES ARE UPDATING THEIR PROCEDURES
  • WITH ALL CRUISE LINES NOW REQUIRING A NEGATIVE COVID TEST FOR PASSENGERS REGARDLESS OF VACCINATION STATUS
  • WE ARE WORKING WITH CRUISE LINES TO ACCOMMODATE OPERATIONAL CHANGES NECESSARY FOR THAT CHANGE TO OCCUR
  • TURNING YOUR ATTENTION TO THE AIRPORT, I'M PLEASED TO ANNOUNCE A NEW CAMPAIGN IN DEPTH HIGHLIGHTING QUALITY JOBS WE HAVE AT SEA
  • AT SEA AIRPORT BUSINESS AND AIRLINES ARE RAPIDLY ADJUSTING TO THE ACCELERATING NUMBER OF TRAVELERS, BUSINESSES AND SERVICE PROVIDERS, AND THEY'RE ALL WORKING HARD TO ACHIEVE APPROPRIATE LEVELS OF STAFFING TO SUPPORT THE INFLUX OF PASSENGER VOLUMES
  • OUR SEA JOBS CAMPAIGN WILL INCLUDE ADVERTISING AND EARNED MEDIA TO ENCOURAGE RESIDENTS OF NEAR AIRPORT COMMUNITIES TO PURSUE EMPLOYMENT OPPORTUNITIES AT SEA
  • THE CAMPAIGN WE USE SOCIAL MEDIA AS WELL AS BOTH HYPER LOCAL AND MULTICULTURAL PUBLICATIONS AND ADVERTISEMENTS ON KING COUNTY METRO BUSES
  • SEA IS AN EXCITING PLACE TO WORK
  • QUALITY JOBS ARE A KEY COMPONENT OF OUR ECOMO RECOVERY STRATEGY AND I'M PLEASED BY THE WORK OF OUR TEAMS TO PROMOTE THESE OPPORTUNITIES
  • ANOTHER KEY COMPONENT OF OUR ECOMO RECOVERY STRATEGY IS INCREASING CAREER PATHWAYS IN WORKFORCE DEVELOPMENT OPPORTUNITIES FOR THE COMMUNITIES THAT NEED THE MOST
  • LAST WEEKEND I JOINED COMMISSIONERS CALKINS AND STEINBRUECK AND MANY MEMBERS OF OUR STAFF FROM ACROSS THE ORGANIZATION AS WE OPENED THE NEWLY LEAST DUWAMISH RIVER COMMUNITY HUB LOCATED IN SOUTH PARK AS PART OF OUR COMMUNITY BENEFITS COMMITMENT
  • ESTABLISHED IN THE DUWAMISH VALLEY COMMUNITY EQUITY PROGRAM, THE SPACE WILL SERVE TO PROMOTE COMMUNITY PARTNERSHIPS, EVENTS, HEALTHY ENVIRONMENTS AND ECONOMIC DEVELOPMENT
  • IT WAS GREAT TO SEE IN THE PARKING LOT
  • THEY HAD A TRADE EVENT GOING ON AT THE TIME OF THE OPENING
  • WE RECOGNIZE THAT SOME NEAR PORT COMMUNITIES SUCH AS GEORGETOWN AT SOUTH PARK EXPERIENCE A HIGHER PROPORTION OF ENVIRONMENTAL IMPACTS AND LACK EQUITABLE ACCESS TO THE PORT BENEFITS TO THE REGION
  • THANKS TO YOUR LEADERSHIP IN ESTABLISHING THE DUWAMISH VALLEY COMMUNITY BENEFITS COMMITMENT IN 2019, WE ARE INCREASING OUR EQUITY AND OUTREACH EFFORTS IN THIS COMMUNITY, AND THE OPENING OF THE SPACE REFLECTS THIS COMMITMENT
  • IN OTHER NEWS, I'M PROUD TO REPORT THAT ASSISTANT DIRECTOR OF ENGINEERING JENISON HAS BEEN SELECTED TO JOIN THE BOARD OF GOVERNORS OF THE CONSTRUCTION MANAGER CERTIFICATION INSTITUTE
  • HER PARTICIPATION WILL GUIDANCE SHAPE THE NATIONAL REQUIREMENTS FOR CERTIFICATION AND CONSTRUCTION MANAGEMENT PROFESSION
  • WE'RE PLEASED THAT JANICE CAN SHARE HER KNOWLEDGE BROADLY TO BENEFIT THE FAST GROWING CONSTRUCTION INDUSTRY
  • SHE STARTS HER THREE YEAR TERM ON JANUARY 1ST 2022
  • CONGRATULATIONS, JANICE
  • COMMISSIONERS, IN NATIONAL NEWS IMPACTING THE PORT
  • THIS MORNING BY A VOTE OF 69 TO 30, THE UNITED STATES SENATE PASSED A BIPARTISAN 1 2,000,000,000,000 DOLLAR INFRASTRUCTURE BILL THAT INCLUDES 20,000,000,000 FOR AIRPORTS IN 17,000,000,000 FOR MARITIME INVESTMENTS
  • IF SIGNED INTO LAW, THE LEGISLATION WOULD RESULT IN HUNDREDS OF MILLIONS OF DOLLARS TO THE PORT OF SEATTLE TO SUPPORT OUR CAPITAL PROJECTS, AS WELL AS BILLIONS OF DOLLARS FOR OTHER INVESTMENTS THAT WE CARE ABOUT FROM RESEARCH ON HYDROGEN FUELS TO MONEY FOR VEHICLE ELECTRIFICATION INFRASTRUCTURE TO THE FUNDING FOR PUBLIC SCHOOL INDOOR AIR QUALITY IMPROVEMENTS
  • I WANT TO SPECIFICALLY THANK SENATOR MURRAY AND SENATOR CANTWELL FOR THEIR SUPPORT OF THESE HISTORIC INVESTMENTS
  • AND WE LOOK FORWARD TO WORKING WITH THE REST OF THE WASHINGTON CONGRESSIONAL DELEGATION WHEN ALSO REPRESENTATIVES CONSIDERS THE LEGISLATION LATER THIS FALL
  • ALSO THIS WEEK, THE SENATE WILL PASS A 3,500,000,000,000 DOLLAR BUDGET FRAMEWORK THAT BEGINS THE PROCESS OF CRAFTING LEGISLATION TO FUND GENERATIONAL INVESTMENTS IN HEALTH CARE, CHILD CARE, EDUCATION, CLIMATE, AND IMMIGRATION
  • A PARTICULAR INTEREST TO THE PORT IS THE POTENTIAL FOR SIGNIFICANT FUNDING AND INCENTIVES FOR SUSTAINABLE AVIATION FUELS, MARITIME ELECTRIFICATION, AND THE PORT SUSTAINABILITY PRIORITIES
  • AGAIN, WE'LL BE WORKING CLOSELY WITH OUR MEMBERS OF CONGRESS TO ADVOCATE FOR THESE IMPORTANT INVESTMENTS
  • WHILE THE PATH FORWARD FOR BOTH THE HARD INFRASTRUCTURE AND THE HUMAN INFRASTRUCTURE BILLS IS FULL OF UNCERTAINTY THAT LIKELY WON'T BE SETTLED UNTIL THE END OF THE YEAR, WE ARE HAPPY TO CELEBRATE THESE IMPORTANT MILESTONES
  • STAFF WILL CONTINUE TO UPDATE YOU AS NEW DEVELOPMENTS OCCUR
  • MOVING TO TODAY'S COMMISSION MEETING, I LIKE TO HIGHLIGHT A COUPLE ITEMS ON THE CONSENT AGENDA
  • WE HAVE SEVERAL ITEMS RELATED BUILDING CONTROLS, LOADING UPGRADES, AND DIGITAL CONTROL SYSTEMS ALTHOUGH THESE ARE ROUTINE AUTHORIZATIONS WHERE WE ARE ENHANCING EXISTING INFRASTRUCTURE AND PLANNING FOR THE FUTURE, I WANT TO CALL THESE ITEMS OUT FOR THEIR GAINS STEADY AND GRADUAL
  • THAT WILL MAKE AN ENERGY EFFICIENCIES AS GOOD EXAMPLES OF STEWARDSHIP, WHICH IS A KEY PORT VALUE UNDER NEW BUSINESS
  • WE HAVE A BRIEFING AND AUTHORIZATION ON SOUND INSULATION
  • THIS BRIEFING WILL SHARE OUR PROGRESS IN ACCELERATING THIS IMPORTANT PROGRAM
  • THE SUBSEQUENT ACTION WILL AUTHORIZE THE APARTMENT PROGRAM, WHICH IS THE LARGEST COMPONENT OF THE NO EAST PROGRAM, AND IT'S ALSO CRITICAL FOR MOVING FORWARD
  • I HAVE MORE TO SAY ABOUT THIS ITEM DURING ITS INTRODUCTION
  • FOR THE STAFF BRIEFING TODAY WE'LL LOOK AT OUR SECOND QUARTER FINANCIAL PERFORMANCE
  • ALTHOUGH THE PANDEMIC CONTINUES TO UPEND DAILY LIFE AND INTRODUCE UNCERTAINTY INTO OUR WORLD, GOOD BUDGETING AND COST MANAGEMENT HAS SET US UP TO CONTINUE TO DO WELL IN 2021
  • THIS IS A BRIEFING
  • YOU'LL LEARN MORE ABOUT OUR PERFORMANCE AND THE KEYS TO OUR FINANCIAL RESULTS
  • AND WITH THAT COMMISSIONERS, THAT CONCLUDES MY REPORT
  • THANK YOU, EXECUTIVE METRUCK, AND THANK YOU FOR REMINDING US ABOUT THE GREAT PASSAGE OF THE INFRASTRUCTURE BILL AND ALL THE GOOD THINGS WE'RE ENCOURAGED BY AND THAT WE WROTE ABOUT IN THE OP ED TO THE SEATTLE TIMES
  • ALL THE MORE REASON WE NEED TO MONITOR OUR GREENHOUSE GAS EMISSION REDUCTIONS TO MAKE THE CASE FOR WHY WE NEED THAT
  • NORMALLY, AT THIS TIME WE WOULD HEAR A REPORT ON OUR COMMITTEE AGENDA, BUT WE DID NOT HAVE ANY COMMITTEE MEETINGS SINCE OUR LAST BUSINESS MEETING, SO THERE'S NOTHING TO REPORT THERE
  • BUT NOW THE COMMISSION WILL ACCEPT GENERAL PUBLIC COMMENT FROM THOSE WHO SIGNED UP TO SPEAK ON ITEMS RELATED TO THE PORT
  • WRITTEN MATERIALS PROVIDED TO THE CLERK WILL BE INCLUDED IN TODAY'S MEETING AT RECORD
  • THE CLERK HAS A LIST OF THOSE PREPARED TO SPEAK AS THE CLERK CALLS YOUR NAME
  • WE'LL OPEN THE LINE AND COMMENTERS WILL HAVE TO UNMUTE THEMSELVES
  • THEN PLEASE REPEAT YOUR NAME FOR THE RECORD
  • AND IF YOU'RE ON THE TEAM'S MEETING AND ARE ALSO STREAMING THE MEETING, PLEASE MUTE THE VIDEO STREAM TO AVOID FEEDBACK
  • PLEASE NOTE THAT THERE MAY BE A SHORT TIME LAG ON THE VIDEO STREAM
  • COMMENT TIME WILL BE LIMITED TO TWO MINUTES PER PERSON
  • AND CLERK HART, PLEASE DO US THE HONOR OF CALLING THE FIRST PERSON
  • THANK YOU
  • OUR FIRST SPEAKER TODAY IS JC HARRIS
  • GOOD AFTERNOON, COMMISSIONERS
  • SO, YEAH, THIS IS ONE OF THOSE THINGS WHERE I ALWAYS WILL SOUND SOMEWHAT UNGRATEFUL
  • BUT FIRST OF ALL, I WANT TO THANK YOU FOR MOVING AHEAD WITH THE ACCELERATED SOUND INSULATION PROGRAM
  • THIS IS A MATTER OF EQUITY FOR ME BECAUSE YOU ARE GOING TO BE FINALLY PROVIDING RELIEF TO APARTMENT DWELLERS IN DES MOINES HUNDREDS OF THEM
  • AND, YOU KNOW, THEY HAVE BEEN WAITING A LONG TIME AND WELL DONE
  • IT WOULD BE GREAT IF YOU COULD WHILE YOU NOW HAVE THE INFRASTRUCTURE SET UP, START THINKING ABOUT PROVIDING UPDATES
  • I WENT BACK AND I LOOKED AGAIN AT LAST FEBRUARY'S MEETING AND I WAS STRUCK BY HOW WELL DONE
  • THE QUESTIONS WERE JUST FANTASTIC BY THE COMMISSIONERS
  • AND YOU COVERED ALL OF THE VARIOUS OBSTACLES TO PROVIDING UPDATES
  • AND IT SEEMS LIKE NOW WOULD BE A TIME WHERE YOU COULD AT LEAST PUT SOME MONEY ON THE TABLE TOWARDS THAT
  • I ENCOURAGE YOU TO GO BACK ALL TO GO BACK AND LISTEN TO THAT MEETING
  • IT'S REALLY EXTRAORDINARY
  • AND I WILL KEEP NAGGING YOU ABOUT IT
  • BUT IN THE REMAINING TIME, YES, I THINK THE PORT CAN DO A LOT MORE ON REDUCING GREENHOUSE GASES FROM THE AIRLINES
  • AND I LOOK FORWARD TO SPEAKING TO EACH OF YOU ABOUT THAT IN THE NEAR FUTURE
  • THANKS AGAIN FOR PROVIDING RELIEF TO OUR APARTMENT DWELLERS
  • THANK YOU, JC
  • I MADE SURE WE NOTIFIED YOU OF THIS ITEM ON THE AGENDA
  • SO THANK YOU FOR TAKING THE TIME TO TESTIFY
  • THANK YOU
  • CLERK HART, CAN WE HAVE THE NEXT SPEAKER? YES
  • OUR NEXT SPEAKER IS JORDAN VAMOS
  • GOOD AFTERNOON, COMMISSIONERS
  • MY NAME IS JORDAN VAN VEST
  • OVER THE LAST TWO WEEKS, THE DIXIE FIRE HAS BECOME THE SECOND LARGEST IN CALIFORNIA HISTORY
  • WILDFIRE PLUMES COVER MUCH OF THE WEST, WITH SUMMER CAMPS FOR KIDS CLOSED DUE TO AIR QUALITY
  • SMOKE IS NOW OUR FIFTH SEASON
  • WHEAT YIELDS AND EASTERN WASHINGTON ARE AT ONE OF THEIR LOWEST LEVELS EVER, AS OUR RESERVOIRS ON THE COLORADO RIVER, SOUTHERN EUROPE IS CURRENTLY ENDURING RECORD HEAT, WITH AT LEAST EIGHT DEAD FROM WILDFIRE
  • ON THURSDAY, THE JOURNAL NATURE PUBLISHED A STUDY CONCLUDING THAT THE GULF STREAM CURRENT, A MAJOR CLIMATE TIPPING POINT, IS ON THE VERGE SHUTTING DOWN WITH UNIMAGINABLE CONSEQUENCES
  • 3,000,000,000 PEOPLE IN SOUTH ASIA FACE INCREASING WATER SHORTAGES DUE TO RAPIDLY MELTING GLACIERS ON THE TIBETAN PLATEAU, AND ON MONDAY, THE IPCC ISSUED THEIR MOST DIRE WARNING YET OUR MODERN CAPITALIST SOCIETY, WHICH PRIVILEGES THE WEALTHY AND FOCUSES ON SHORT TERM HAPPINESS WHILE IGNORING THE SURVIVAL NEEDS OF BILLIONS OF PEOPLE
  • AND THE ECOLOGICAL WEB OF WHICH WE ARE ALL APART IS DISINTEGRATING
  • THE LONGER WE DENY THAT, THE DEEPER OUR WORLD DRIFTS TOWARDS DISASTER AND UNPRECEDENTED SOCIAL VIOLENCE, OUR ECONOMIC SYSTEM IS ANTIQUATED
  • WE NEED NOT ONLY A GREEN NEW DEAL, BUT A NEW VISION AND MISSION WHICH PRIORITIZES THE WELLBEING OF ALL LIFE INSTEAD OF THE NARROWS INTERESTS OF A FEW
  • INSTEAD OF MEASURING THE SUCCESS OF THE PORT IN TERMS OF PASSENGERS BOARDING FOSSIL FUEL GUZZLING, CARBON EMITTING PLANES AND CRUISE SHIPS, WHAT IF INSTEAD YOU MEASURE THE IMPACT OF PORT BUSINESS IN TERMS OF GROSS NATIONAL HAPPINESS? COMMISSIONER FELLEMAN RECENTLY STATED, THERE IS AN INSATIABLE APPETITE FOR A CRUISE
  • WE THE PORT DIDN'T CREATE IT
  • IT EXISTS
  • BUT THE PUBLIC RECORD CLEARLY DEMONSTRATES THAT THE PORT HAS A LONG HISTORY OF PROMOTING CRUISING AND FLYING
  • INSTEAD OF BUILDING NEW PARKING LOTS, PLEASE FULLY EMBRACE THE SCIENCE
  • EMBRACE THE WISDOM OF INDIGENOUS LEADERS WORKING TO PROTECT THE EARTH
  • RETHINK YOUR BUSINESS MODEL SO THAT WE CAN TRANSITION AS RAPIDLY AS POSSIBLE TO A CRUISE FREE SALISH SEA
  • THANK YOU
  • THANK YOU, JORDAN
  • CLERK HART, PLEASE NEXT SPEAKER, YES
  • OUR NEXT SPEAKER IS PATTY MACKEY
  • GOOD AFTERNOON
  • I'M PATTY MACKY
  • I'M THE PRESIDENT AND CEO OF KETCHIKAN VISITORS BUREAU, LOCATED IN KETCHIKAN, ALASKA
  • I'M HERE IN RECOGNITION OF THE TIES THAT EXIST BETWEEN MY COMMUNITY AND THE GREATER PUGET SOUND AREA, OUR COMMON INTERESTS IN MARITIME ECONOMIES SUCH AS SHIPPING AND COMMERCIAL FISHING, AND MORE TO THE POINT TOURISM
  • AS MANY OF YOU ARE AWARE, KETCHIKAN IS THE SOUTHERNMOST COMMUNITY IN ALASKA
  • WE'RE JUST 90 MINUTES BY AIR FROM SEATAC
  • EACH YEAR, THOUSANDS OF VISITORS ARRIVED FROM YOUR AIRPORT TO VACATION, FISH AND CONDUCT BUSINESS IN AND AROUND KETCHIKAN
  • AND WE HAVE BEEN THE SECOND LARGEST CRUISE SHIP PORT IN ALASKA, HOSTING OVER A MILLION VISITORS EACH SUMMER
  • THE PANDEMIC IMPACT ON OUR LOCAL TOURISM ECONOMY WAS DEVASTATING, AND WE ARE GRATEFUL THAT THE PORT OF SEATTLE IS OPEN FOR BUSINESS
  • THE OPPORTUNITY FOR OUR LOCALLY OWNED AND OPERATED BUSINESSES TO BEGIN THE TASK OF RECLAIMING THEIR LIVES IS NOT ONLY IMPORTANT ECONOMICALLY BUT ALSO PSYCHOLOGICALLY
  • IT'S BEEN GRATIFYING TO SEE OUR ELECTED OFFICIALS, SENATOR SULLIVAN, SENATOR MURKOWSKI AND SENATOR CANTWELL WORK TO SECURE THE PVSA WAIVER THAT HAS ALLOWED THE CRUISE INDUSTRY TO RETURN TO ALASKAN WATERS
  • PRE COVID TOURISM WAS ESTIMATED TO BRING IN OVER 250,000,000 DOLLARS A YEAR TO THE KETCHIKAN ECONOMY, 76,000,000 IN PAYROLL AND PROVIDED 700 JOBS
  • I KNOW I DON'T NEED TO REITERATE THE LOSSES WE EXPERIENCED BECAUSE YOU FELT THEM AS WELL
  • THE PORT OF SEATTLE IS TRULY A GATEWAY THAT THE PACIFIC NORTHWEST AND BEYOND
  • THE DECISIONS YOU MAKE IMPACT COMMUNITIES LIKE MINE AND MANY OTHERS IN THE REGION
  • I WANT TO AGAIN SAY THANK YOU FOR THE COOPERATION WE'VE ENJOYED WITH THE PORT EMPLOYEES AND LEADERSHIP LIKE AND EXPRESS MY SINCERE HOPE THAT WE CAN ALL LOOK FORWARD TO THE RETURN OF HEALTHY ECONOMIES THROUGHOUT OUR REGION
  • THANK YOU
  • THANK YOU, PATTY
  • THE NEXT SPEAKER, OUR NEXT SPEAKER IS IRIS ANTMAN
  • CAN YOU HEAR? WE CAN
  • IRA, GOOD AFTERNOON
  • MY NAME IS IRIS ANTMAN
  • YOU MAY RECOGNIZE MY NAME AS I'VE BEEN TESTIFYING PERIODICALLY SINCE JANUARY OF 2020, INITIALLY TO A POST T 46 AND CURRENTLY TO VOICE OPPOSITION TO THE CRUISING INDUSTRY AS A WHOLE
  • I UNDERSTAND THE CRUISE INDUSTRY IS A BIG MONEY MAKER FOR THE PORT AND HELPFUL TO SMALL BUSINESSES AND PROVIDING JOBS, AND THIS IS IMPORTANT
  • ECONOMIC EXPANSION IS ONE OF THE PORT MISSIONS, BUT THE OTHER MISSION IS ENVIRONMENTAL STEWARDSHIP
  • I'M SURE YOU'VE ALL SEEN AND READ AT LEAST THE HIGHLIGHTS OF THE SIXTH REPORT FROM THE UN IPCC
  • IT'S DEVASTATING AND THE ACCURACY OF THIS BODY OF WORK IS UNDENIABLE BY LOOKING AT THE FIRST REPORT PUBLISHED IN 1990, WHICH STATED THAT IF BUSINESS AS USUAL CONTINUES, GLOBAL TEMPERATURES WILL RISE ABOUT ONE DEGREE CELSIUS BY 2025
  • SO BUSINESS AS USUAL HAS CONTINUED AND THE TEMPERATURE HAS RISEN ABOUT 1.1 DEGREE CELSIUS AND IT'S ONLY 2021
  • ALSO UNDISPUTED IN THE REPORT IS THAT THE CLIMATE CRISIS IS HUMAN CAUSED, THE MAIN CAUSE OF WHICH IS THE BURNING OF FOSSIL FUELS
  • SO HOW CAN THE PORT CONTINUE TO PROMOTE A NON ESSENTIAL LEISURE ACTIVITY TO BE ENJOYED BY THE FEW AT THE EXPENSE OF THE MANY? THE IRONY OF DESTROYING ALASKA'S BEAUTY BY CRUISING TO SEE IT CANNOT BE LOST ON YOU
  • BY THURSDAY AND FRIDAY OF THIS WEEK, IT WILL BE CLOSE TO 100 DEGREES IN SEATTLE
  • CRUISE SHIPS HAVE AN OVERSIZED CONTRIBUTION TO GLOBAL WARMING
  • PRESIDENT SETTLEMENTS COMMENTS ON THE IPCC REPORT AND WHAT STEPS SUPPORT MIGHT TAKE TO HELP MITIGATE THE PORT CLIMATE IMPACTS WITHOUT SERIOUSLY LOOKING AT THE HARM OF CRUISING IGNORES THE ELEPHANT IN THE ROOM AND AS FAR AS I CAN UNDERSTAND, REPRESENTS AN ATTITUDE OF CYNICAL HYPOCRISY
  • PLEASE, IT'S TIME TO END NON ESSENTIAL LEISURE CRUISING
  • BE COURAGEOUS, BE CREATIVE, BRAINSTORM OTHER ECONOMIC VENTURES, ONE THAT MINIMIZE AND END THE BURNING OF FOSSIL FUELS
  • THANK YOU
  • THANK YOU VERY MUCH, IRIS
  • NEXT SPEAK? YES
  • OUR NEXT SPEAKER IS MARCY HEAVER
  • THANK YOU
  • THIS IS MARCY HEAVER FROM FRIENDS OF THE ARCS
  • AND I'M TESTIFYING TODAY IN SUPPORT OF AN EXHAUST GAS SCRUBBER WASTEWATER DISCHARGE BAN FOR CRUISE SHIPS IN PUGET SOUND
  • A SCRUBBER WASTEWATER DISCHARGE BAN HAS BEEN PROPOSED AS AN AMENDMENT TO THE CRUISE MLU
  • IT WAS PROPOSED AT THE END OF 2020 AND NO DECISION HAS YET BEEN MADE ON THE AMENDMENT
  • TO DATE, CRUISE SEASON HAS NOW RESTARTED
  • AS WE ARE ALL AWARE, IN THE NORTHWEST, DESPITE THE RESURGENCE OF COVID, 19 CRUISE SHIPS ARE SITTING AT THE DOCK HERE IN ELLIOTT BAY AND THEY'RE COMING IN OUT OF PUGET SOUND
  • THEY ARE USING THEIR SCRUBBERS AND LIKELY DUMPING THEIR TOXIC, ACIDIC WASTEWATER INTO PUGET SOUND WATERS
  • AS WE SPEAK, WE ALL KNOW HOW ENDANGERED ART WORKERS ARE
  • THE CRUISE INDUSTRY DUMPING ITS SCRUBBER WASTEWATER INTO PUGET SOUND IS THEY'RE EXACERBATING THE THREATS TO THIS ICONIC SPECIES
  • OUR ORCAS ARE STRESSED AND HUNGRY, AND THE CRUISE INDUSTRY IS ONLY MAKING MATTERS WORSE WITH THEIR SCRUBBER DISCHARGES
  • THE SIGNIFICANT MAJORITY OF SCRUBBERS USED BY THE CRUISE INDUSTRY ARE OPEN LOOP EMIT ACIDIC WASTEWATER THAT IS WARMER THAN AMBIENT SEAWATER AND CONTAINS HEAVY METALS, PAHS, SUSPENDED PARTICULATE MATTER AND NITRATES, ALL OF WHICH ARE VERY HARMFUL TO THE MARINE ENVIRONMENT AND THE MARINE CREATURES THAT INHABIT
  • WE APPRECIATE THAT THE PORT OF SEATTLE HAS BANNED THE DISCHARGE OF SCRUBBER WASTEWATER WHILE ANY CRUISE SHIP IS DOCKED AS OF JANUARY 1ST, AND WE'RE VERY SUPPORTIVE OF THE IMPLEMENTATION OF A BAN ON THE DISCHARGE OF EXHAUST GAS, RUBBER WASTEWATER FROM ALL SCRUBBER TYPES AND INTO ALL OF PUGET SOUND
  • THE CRUISE INDUSTRY CAN DO THIS
  • THEY HAVE USED CLEANER FUEL FOR YEARS IN CALIFORNIA WATERS WHERE SCRUBBERS ARE NOT ALLOWED
  • PLEASE INSIST THAT CRUISE INDUSTRY ACCEPT THE PROPOSED AMENDMENTS TO THE MLU AND STOP DUMPING SCRUBBER WASTEWATER IN PUGET SOUND
  • OVER THE YEARS, THE CRUISE COMPANIES HAVE POLLUTED OUR AIR, OUR WATER AND OUR CLIMATE
  • THEY HAVE REPEATEDLY MADE CHOICES THAT PUT THE HEALTH OF THE PLANET AND OUR SOUND AT RISK
  • PLEASE IMPLEMENT THE PROPOSED AMENDMENTS TO THE CRUISE MLU FOR THE SAKE OF OUR ENDANGERED ORCAS ARE SOUND AND OUR MARINE ENVIRONMENT
  • THANK YOU
  • THANK YOU, MARCY
  • NEXT SPEAKER, PLEASE
  • OUR NEXT SPEAKER IS KATIE MCKENNA
  • OKAY
  • HI
  • I'M HERE
  • GOOD AFTERNOON, COMMISSIONERS
  • MY NAME IS KENNY MCKENNA
  • I'M 32 YEARS OLD, I'M A LONG TIME SEATTLE RESIDENT AND I'M WITH SEATTLE CRUISE CONTROL TO SPEAK ABOUT MY DESIRE TO SEE A CRUISE FREE SALISH SEA
  • WE UNDERSTAND THAT THE PORT'S MISSION IS TO PROVIDE ECONOMIC GROWTH TO OUR REGION WHILE ALSO PROMOTING ENVIRONMENTAL SUSTAINABILITY, AND WE REALLY APPRECIATE SOME OF THE EFFORTS YOU'VE MADE SO FAR
  • HOWEVER, WHAT WE DON'T UNDERSTAND IS HOW THE PORT, THE COMPANIES WHO OWN THE CRUISE SHIPS AND THE CRUISERS THEMSELVES CAN LOOK THE OTHER WAY FROM THE DIRE SITUATION WE'RE FACING IN THE CLIMATE CRISIS
  • WE CANNOT WAIT ANOTHER DAY TO START MAKING THE CHANGES NECESSARY TO REVERSE CLIMATE CHANGE
  • THE EFFECTS OF CLIMATE CHANGE ARE ALREADY HERE, AND I'M EXTREMELY CONCERNED ABOUT THE LIVELIHOODS OF FUTURE GENERATIONS
  • WHAT KIND OF SITUATION ARE WE BRINGING THEM INTO? WHAT IS IT GOING TO LOOK LIKE FOR ME TO LIVE IN SEATTLE WHEN I'M 50 OR 60 YEARS OLD? ONE WAY THAT WE CAN START TO COMBAT IT TODAY IS THROUGH FINDING MORE SUSTAINABLE WAYS TO SUPPORT JOBS AND LOCAL BUSINESSES
  • AND BY DOING SO, BEING AN EXAMPLE TO OTHER PORTS AROUND THE WORLD, CRUISING CREATES AN ENORMOUS AMOUNT OF HARMFUL POLLUTION FROM THE NOISE POLLUTION IMPACTING OUR BEAUTIFUL WHALE POPULATIONS TO LARGE AMOUNTS OF GREENHOUSE GAS EMISSIONS TO TALK LIKE EMISSIONS A PARTICULATE MATTER THAT IMPACT HUMAN HEALTH AND CAUSE CANCER
  • AND ADDITIONALLY, OUR COUNTRY IS SEEING A SURGE IN COVID 19 CASES, AND THE PANDEMIC IS STILL FAR FROM OVER
  • WE KNOW WHAT HAPPENED AT THE BEGINNING OF THE PANDEMIC THAT CRUISE SHIPS ARE BREEDING GROUNDS FOR THE VIRUS
  • THE PORT CAN CONTINUE TO IGNORE THE REALITIES OF CLIMATE CHANGE AT THE EXPENSE OF ALL OUR LIVES IN OUR HOME PLANET THAT SUPPORTS ALL LIFE
  • OR IT CAN BEGIN THE WORK OF CHANGING HOW AND WHY IT DOES BUSINESS REALLY IMPLORE YOU TO PLEASE TAKE THIS SERIOUSLY AND THINK ABOUT THE RESPONSIBILITY THAT YOU HAVE AS COMMISSIONERS
  • THANK YOU
  • THANK YOU VERY MUCH, KATIE
  • FOR CARD, OUR NEXT SPEAKER
  • YES
  • OUR NEXT SPEAKER IS CAROLYN BROTHERTON
  • CAN YOU HEAR ME? WE CAN
  • OKAY
  • HI
  • MY NAME IS DR CAROLYN BROTHERTON
  • I'M A FORMER CHEMIST
  • I'M A CONCERNED CITIZEN LIVING AND SEATAC FLIGHT PATH
  • THANK YOU FOR THE CHANCE TO SPEAK
  • AS WE STRUGGLE WITH THE DELTA VARIANT AND FACE A DEADLY HEAT WAVE THIS SUMMER, WE KNOW THAT THE GLOBAL PANDEMIC AND CLIMATE COLLAPSE ARE ON OUR DOORSTEP
  • I URGE YOU ALL TO THINK LONG TERM FOR OUR ECONOMY AND OUR HELP
  • WE NEED LEADERS LIKE YOU TO LEAD
  • EXPANDING THE PRESENCE OF CRUISE SHIPS IN SEATTLE IS THE WRONG MOVE
  • ECONOMIC IN TERMS OF JOBS AND LOCAL SPENDING FROM CRUISE SHIPS AND THEIR PASSENGERS IS HIGHLY OVERSTATED
  • PASSENGERS SPEND MORE ON THEIR SHIPS WHERE THEY CAN FIND DISCOUNT MEALS AND DRINKS AND SHOPPING TRADITIONAL TOURISTS TO PEOPLE WHO ACTUALLY LIVE HERE
  • SPEND MORE HERE
  • PLUS, WHEN IT COMES TO JOB, WHAT KIND OF JOB AND AT WHAT COST? CRUISE SHIPS ARE NOTORIOUS FOR SKIRTING LABOR AND ENVIRONMENTAL LAWS TO AVOID PAYING TAXES IN CONTRIBUTING TO OUR SOCIETY
  • AND, YOU KNOW, THIS YEAR THEY'VE BEEN HOT BEDS WITH THE PANDEMIC AND WE'VE ALL READ THE GROSS ABUSE OF THEIR WORKERS DURING THE PANDEMIC
  • IT'S BEEN REALLY AWFUL TO READ
  • SO EVEN THOUGH IT'S HARD, WE MUST THINK LONG TERM
  • IT'S SOMETHING WE'RE BAD AT AS HUMANS
  • BUT WE'VE HEARD TODAY ABOUT THE IPCC REPORT AND HOW DIRE THE SITUATION IS
  • CLIMATE CHANGE IS THE GREATEST THREAT TO OUR ECONOMY IN THE LONG TERM
  • IF WE NEED GROWTH AND JOBS, THE PORT
  • YOU THINK ABOUT HOW TO ACHIEVE THAT THROUGH SUSTAINABILITY AND PROJECTS TO AID THE CLIMATE
  • THERE ARE MANY WAYS TO DO THIS THAT WE CAN STIMULATE THE ECONOMY AND HOPE WITH CONTENT TO CHANGE
  • AT THE SAME TIME, I URGE YOU TO NOT ACCEPT BAD BARGAINS FOR THE SAKE OF SHORT TERM GROWTH
  • I URGE YOU TO NOT EXPAND CRUISE OPERATIONS AND TO ALSO NOT BUILD OVER A GREEN SPACE FOR A PARKING LOT IN SEATTLE NORTH SEATAC NEIGHBORHOOD
  • YOU SHOULD MAKE CHOICES NOW TO BE ON THE RIGHT SIDE OF HISTORY
  • WE NEED LEADERS LIKE YOU TO DO THIS
  • DON'T TRADE SHORT TERM GROWTH FOR LONG TERM SURVIVAL
  • INSTEAD, BE CREATIVE AND PRIORITIZE SUSTAINABILITY
  • WE'VE HEARD REALLY GREAT ARGUMENTS TODAY, AND I URGE YOU TO TAKE THIS INTO ACCOUNT
  • THANK YOU
  • THANK YOU, DR BROTHERTON
  • DO WE HAVE A NEXT SPEAKER, PLEASE? YES
  • OUR NEXT SPEAKER IS STACEY OAKS
  • STACEY, IF YOU'RE CALLING IN VIA THE TELEPHONE AT STAR SIX TO UNMUTE
  • HI, CAN YOU HEAR ME? WE CAN
  • GREAT
  • THANK YOU
  • YEAH
  • MY NAME IS STACEY OAKS, AND I'M SPEAKING TO YOU TODAY AS AN ADVOCATE FOR TACOMA RESIDENTS AND FOR THE PUYALLUP TRIBE, WHOSE ANCESTRAL TIDE FLATS WERE ONCE A THRIVING ESTUARY FULL OF LIFE AND SUSTENANCE
  • BUT IS TODAY CALLED THE PORT OF TACOMA FULL OF TOXIC, SUPER FUN SITES, POLLUTING FOSSIL FUEL IN FACILITIES AND WATER THAT MOST PEOPLE WOULD AVOID SWIMMING IN OR EATING SEAFOOD FROM
  • IF YOU CAN FIND ANY, THERE'S A VOTE COMING UP IN LATE SUMMER AND DISCUSSION IS HAPPENING NOW AT TACOMA CITY COUNCIL THAT WILL DETERMINE IF THE CURRENT FOSSIL FUEL OPERATIONS ON THE PORT WILL CONTINUE TO BE ALLOWED TO EXPAND OR IF A DANGEROUS LOOPHOLE WILL FINALLY BE CLOSED
  • AFTER FOUR YEARS OF PUBLIC OUTCRY, THESE FOSSIL FUEL OPERATIONS POSE AN IMMEDIATE SAFETY THREAT TO NEARBY COMMUNITY AND IMPOSE DAILY HEALTH IMPACTS FROM REFINING AND REFRIGERATION EMISSIONS, AS WELL AS FROM THE DIESEL EMISSIONS OF TRUCKS USED FOR TRANSPORT
  • THIS AREA IS HOME TO SOME OF THE WORST AIR QUALITY IN THE COUNTRY
  • ON TOP OF ALL OF THESE INJUSTICES, WHICH SHOULD BE ENOUGH ON THEIR OWN TO SPUR THE EFFORT OF A COMMENT WE FACE IMPENDING CLIMATE COLLAPSE, AND MONDAY'S IPCC REPORT CLEARLY CALLS OUT OUR FOSSIL FILL USE AS PIVOT
  • REGARDLESS OF OUR JOBS OR SOCIAL STATUS, EVERY SINGLE ONE OF US CAN AND SHOULD BE USING OUR VOICE AS INDIVIDUALS TO SAY ENOUGH IS ENOUGH
  • STOP EXPANDING THESE TOXIC INDUSTRIES
  • STOP TREATING THE TIDE FLATS
  • THE COMMUNITIES OF TACOMA, THE PUYALLUP TRIBE LIKE THEY ARE DISPOSABLE
  • STOP TREATING THIS AREA LIKE A SACRIFICE FILM
  • STOP EXPANDING THE ACTIVITIES THAT ARE DIGGING OUR CHILDREN'S GRAVES
  • AS PORT DECISION MAKERS AND NORTHWEST SEAPORT ALLIANCE MEMBERS, YOUR VOICE, THE PERSONAL CAPACITY CARRIES WEIGHT AND INFLUENCE
  • IT'S TIME TO USE IT TO URGE MAYOR WOODARD AND THE TACOMA CITY COUNCIL TO PASS NON INTERIM REGULATIONS FOR THE TIDE FLATS THAT ARE AS STRONG AS POSSIBLE WITHOUT AMENDMENTS THAT UNDERMINE HEALTH EQUITY AND CLIMATE PROGRESS
  • THANK YOU
  • THANK YOU
  • STACY
  • CLERK HART
  • YES
  • HANG ON A SECOND FOR ME
  • LET ME GET MY TIMER RESET HERE
  • SO OUR NEXT SPEAKER IS PEGGY PRINCE
  • YOU HEAR? WE CAN
  • PEGGY
  • YES
  • HELLO
  • MY NAME IS PEGGY PRINCE
  • STEEP EMMISSIONS CUTS
  • THAT'S WHAT THE UN CLIMATE PANEL IS CALLING FOR
  • YOU CAN HATE THEIR CALL CURTAIL THROUGH SHIP TRAFFIC AT THE END OF THE CURRENT SEASON
  • YOU KNOW, THE CRUISE SHIPS IN IT FOUR TIMES AS MUCH GREENHOUSE GAS POLLUTION PER PASSENGER IS AIR TRAVEL
  • AND THAT'S IN ADDITION TO THE FLIGHTS MOST PASSENGERS TAKE IN AND OUT OF SEA TECH, IT'S TIME TO STOP PROMOTING AND PERMITTING THIS FOSSIL FUEL INTENSIVE BUSINESS
  • THINK OF CRUISE SHIPS AS SEA MONSTERS
  • ACTUALLY, THEY'RE MUCH WORSE
  • THEY'RE POLLUTING THE AIR AND WATER, EXPLOITING THEIR WORKERS AND AVOIDING US TAX AND LABOR LAWS
  • EVEN THE PAINT ON THEIR HULLS, DESIGNED TO REPEL BARNACLES AND WEEDS SHEDS HEAVY METALS INTO THE OCEAN, POISONING MARINE LIFE
  • YOU CAN MAKE THESE MONSTERS DISAPPEAR
  • MAKE THE SEATTLE LAST CRUISE SEASON
  • OH, AND PLEASE, DON'T PUT THAT PARKING LOT IN NORTH SEATAC PARK
  • THANK YOU
  • THANK YOU
  • PEGGY, DO WE HAVE ANOTHER SPEAKER CLERK HART? YEAH
  • OUR NEXT SPEAKER IS KENDRA ELRICK
  • HELLO
  • CAN YOU HEAR ME? WE CAN
  • OKAY
  • GREAT
  • HI
  • MY NAME IS KENDRA ELRICH
  • I AM THE SHIPPING CAMPAIGNS DIRECTOR WITH THE ORGANIZATION STANDS DOT EARTH
  • WE'RE BASED UP HERE IN BELLINGHAM, WASHINGTON
  • I'M HERE TODAY TO SPEAK IN SUPPORT OF THE EXHAUST GAS CLEANING SYSTEM SCRUBBER BAN
  • THIS IS A CRITICAL PART OF ENSURING THE ECOSYSTEM HEALTH OF PUGET SOUND
  • AS MERCY KEEPER NOTED WITH FRIENDS OF THE EARTH, OUR SOUTHERN RESIDENT KILLER WHALES ARE CRITICALLY ENDANGERED AND THE CONTAMINANTS THE ENDOCRINE DISRUPTING CHEMICALS, THE TOXIC HEAVY METALS, THE ACIDIC WASTEWATER THAT IS BEING DISCHARGED ON A CONTINUAL BASIS FROM EXHAUST GAS CLEANING SYSTEMS IS FURTHER ENDANGERING THEIR HEALTH AND THE HEALTH OF THE SALMON THAT THEY RELY ON
  • IN ADDITION TO THAT, IT POSES A SIGNIFICANT RISK TO PUBLIC HEALTH
  • WE HAVE HERE IN SEATTLE
  • ACCORDING TO AN ANALYSIS BY THE INTERNATIONAL COUNCIL ON CLAIM TRANSPORTATION, DOUBLE THE GLOBAL AVERAGE IN TERMS OF EXCESS MORTALITY RELATED TO EXPOSURE TO SHIP EXHAUST
  • THAT IS A STAGGERING FIGURE, AND IT IS SOMETHING THAT THE USE OF SCRUBBERS CONTRIBUTES TO
  • ANALYSIS HAVE SHOWN THAT CRUISE SHIPS RELEASED THREE TIMES THE AMOUNT OF BLACK CARBON AS CARGO SHIP COUNTERPARTS
  • THE USE OF SCRUBBERS ALSO INCREASES THE AMOUNT OF PARTICULATE MATTER THAT THESE SHIPS ARE EMITTING
  • SO I URGE YOU TO TAKE ACTION NOW TO PASS THE MEMORANDUM OF UNDERSTANDING AMENDMENT THAT'S BEEN PROPOSED
  • CRUISE SHIPS ARE HERE NOW
  • ACCORDING TO RECENT ANALYSIS, THE MOST IMPACTED PORTS, NINE OF THE 10 MOST IMPACTED PORTS BY SCRUBBER DISCHARGES ARE AS A RESULT OF CRUISE SHIPS AND CRUISE SHIP DISCHARGES
  • SO THIS IS A CRITICALLY IMPORTANT STEP, AND I URGE YOU TO TAKE ACTION NOW AND PASS THE AMENDMENT
  • THANK YOU
  • THANK YOU
  • KENDRA
  • CLERK HART, YES? OUR FINAL SPEAKER SIGNED UP TO SPEAK TODAY AS NEIL ANDERSON
  • HI
  • HI, NEIL
  • WE CAN HEAR YOU
  • OKAY
  • THANKS
  • SO FIRST, I WANTED TO START BY THANKING YOU FOR STARTING THE MEETING BY TALKING ABOUT THE FINDINGS OF YESTERDAY'S IPCC REPORT
  • AS A REPORT SAYS WE ESSENTIALLY RUN OUT OF TIME TO STAY BELOW 1.5 DEGREES, WHICH IS A DANGEROUS THRESHOLD WHERE WE START CROSSING TIPPING POINTS THAT WE WON'T BE ABLE TO RECOVER FROM
  • AS A RESULT, THIS VERSION OF THE REPORT OFFERED A NEW RECOMMENDATION SAYING THAT BECAUSE WE'VE WAITED TOO LONG TO START ACTING, WE NOW NEED TO URGENTLY REDUCE SHORT LIVED GREENHOUSE GASES IN ORDER TO BUY MORE TIME
  • THIS IS SO IMPORTANT THAT THE REPORT DEVOTES AN ENTIRE CHAPTER TO EXPLAINING HOW CRITICAL IT IS AND WHICH GASES WE NEED TO FOCUS ON
  • ONE OF THE MOST IMPORTANT OF THE USERS, BLACK CARBON, WHICH IS OVER 1,000 TIMES AS POWERFUL AS CARBON DIOXIDE
  • AND IT'S EVEN WORSE IN THE ARCTIC BECAUSE IT LANDS ON ICE AND CHANGES THE ALBEDO, CAUSING THE MELTING TO ACCELERATE, ACCORDING TO A REPORT BY THE INTERNATIONAL COUNCIL ON CLEAN TRANSPORTATION
  • CRUISE SHIP SUBMIT AN AVERAGE OF 10 TONS OF BLACK CARBON PER SHIP THREE TIMES AS MUCH AS THE AVERAGE CONTAINER SHIP
  • AND OF COURSE, CRUISE SHIPS LEAVING FROM SEATTLE WILL SPEND A LOT OF THEIR TIME ALONGSIDE GLACIERS, WHICH IS THE WORST POSSIBLE PLACE THEY COULD BE
  • WE'RE IN THE GLOBAL EMERGENCY AND RACING AGAINST TIME TO SOLVE A VERY DIFFICULT PROBLEM, THOUGH
  • COMING UP ON THE ENERGY STORAGE SOLUTIONS TO INTEGRATE RENEWABLES AND THE GRID WILL BE HARD
  • FINDING NEW BUILDING MATERIALS THAT DON'T USE CARBON BASED FEEDSTOCK WILL BE HARD GENERATING PROCESS HEAT FOR INDUSTRIAL MANUFACTURING WILL BE HARD
  • BUT YOU KNOW, IT WOULDN'T BE HARD STOPPING CARBON EMISSIONS FROM CRUISE SHIPS
  • UNLIKE BASIC ELECTRICITY AND REFRIGERATION, THIS IS A LUXURY THAT WE CAN DO WITHOUT
  • AND AT A TIME WHEN WE'RE FACING AN EXISTENTIAL CRISIS THAT WILL CAUSE IMMENSE SUFFERING WITHIN OUR LIFETIME AND EVEN MORE DURING OUR CHILDREN IS CRIMINALLY IRRESPONSIBLE TO WELCOME CLIMATE WRECKING CRUISE SHIPS BACK TO SEATTLE JUST BECAUSE WE HOPE THEIR PASSENGERS WILL SEND SOME OF THEIR MONEY IN OUR LOCAL SHOPS AND THEIR WAY THROUGH
  • THE HEAD OF THE UN HAS CALLED THIS CODE RED FOR HUMANITY AND IT'S WITHIN YOUR POWER TO TAKE A MEANINGFUL STEP AND JUST IN THE IMPACT, PLEASE DO THE RIGHT THING AND LET THE CRUISE INDUSTRY KNOW THAT OUR PORT WON'T BE COMPLETED AND WORSENING THE CRISIS
  • THANK YOU
  • THANK YOU VERY MUCH, NEAL
  • AND THAT CONCLUDES THE PUBLIC COMMENTS
  • UNLESS THERE IS ANY LAST MINUTE SIGNUPS AND CLERK HART, COULD YOU SUMMARIZE ANY WRITTEN COMMENTS? WE HAVE? CERTAINLY
  • I JUST WANT TO CALL FOR ANYONE WHO HASN'T SIGNED UP IF THEY WOULD LIKE TO SPEAK
  • IF THERE'S ANYONE ON THE LINE
  • OKAY
  • THANK YOU
  • THEN WE'LL GO AHEAD AND MOVE TO SUMMARIZING THE WRITTEN COMMENTS
  • LET ME GO AHEAD AND TAKE DOWN THE TIMER HERE
  • SO GOOD AFTERNOON, MR COMMISSION PRESIDENT, MR EXECUTIVE DIRECTOR AND MEMBERS OF THE COMMISSION
  • WE HAVE RECEIVED FIVE WRITTEN COMMENTS SUBMITTED FOR TODAY'S MEETING TO MEETING
  • THESE INVOLVE AN EMAIL TO YOU IN ADVANCE OF THE MEETING AND WILL BECOME A PART OF THE PUBLIC RECORD
  • ANY CORRESPONDENCE RECEIVED DURING THIS MEETING WILL BE DISTRIBUTED TO YOU POST MEETING AND WILL ALSO BE INCLUDED AS PART OF THE MEETING RECORD
  • OUR FIRST COMMENT COMES FROM ERNEST THOMPSON OF NORMANDY PARK CITY COUNCIL
  • HE WRITES TO SAY THAT IT WOULD BE GOOD TO SEE THE LANDSCAPE MASTER PLAN, DOCUMENT WHAT PERCENTAGES OF PLANTS ARE TRUE NATIVE PLANT SPECIES, AND RECOMMENDS THE WASHINGTON NATIVE PLANT SOCIETIES LIST AS AN AUTHORITY
  • ALEXA A SUBMITTED WRITTEN COMMENTS AS A REGISTERED NURSE AND SPOKE REGARDING HER HEALTH AND ENVIRONMENTAL CONCERNS RELATED TO THE RETURN OF CRUISE SHIPS TO THE PORT
  • SHE STATES THAT THE PORT MUST PUT A HALT TO THE RETURN OF CRUISING IN SEATTLE AND STOP ANY PLANS FOR PORT EXPANSION FOR THE BENEFIT OF OUR CLIMATE, ENVIRONMENT AND CITIZENS
  • LAURA GIBBINS SPEAKS TO THE STUDY OF 46 US AIRPORTS AND SURROUNDING SCHOOLS, INCLUDING FIVE BEACON HILL SCHOOLS
  • FOUND AIRPORT NOISE WAS ASSOCIATED WITH LOWER READING AND MATH SCORES
  • SHE REFERENCES ANOTHER REPORT RELATED TO HEALTH EFFECTS CAUSED BY NOISE EXPOSURE AND REFERENCES A SUMMARY FROM THE KING COUNTY DEPARTMENT OF HEALTH REGARDING THE IMPACT OF NOISE POLLUTION FOR CARDIOVASCULAR DISEASE, SLEEP DISTURBANCES AND SCHOOL PERFORMANCE
  • SEAN HUTCHENS WRITES TO ASK THE COMMISSION TO DISCUSS AND SHARE PLANS FOR CREATING MULTI STORY PARKING AND SHIFTING SEA AND THE COMMUNITY AWAY FROM GROUND LEVEL SURFACE ONLY PARKING LOTS
  • AND FINALLY, JORDAN VAN BOST SUBMITTED WRITTEN COMMENTS AND SUPPORT OF HIS SPOKEN COMMENTS TODAY, AND THAT INCLUDES THE WRITTEN TESTIMONY THAT WE RECEIVED FOR THIS MEETING
  • THANK YOU VERY MUCH
  • CLERK HART, HEARING NO FURTHER PUBLIC TEST MONEY
  • WE NOW MOVE TO THE CONSENT AGENDA
  • THE CONSENT AGENDA ARE CONSIDERED ROUTINE AND WILL BE ADOPTED BY ONE MOTION
  • ITEMS REMOVED FROM THE CONSENT AGENDA WILL BE CONSIDERED SEPARATELY IMMEDIATELY AFTER ADOPTION OF THE REMAINING CONSENT AGENDA ITEMS WE'VE HEARD OF NO ITEMS TO BE PULLED TODAY
  • AT THIS TIME, THE SHARE WILL ENTERTAIN A MOTION TO APPROVE THE CONSENT AGENDA COVERING ITEMS EIGHT A THROUGH EIGHT K
  • SO MOVED
  • IS THERE A SECOND? SECOND
  • THE MOTIONS BEEN MOVED AND SECONDED, COMMISSIONERS, PLEASE SAY YES OR NO WHEN YOUR NAME IS CALLED BEGINNING WITH COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER CALKIN
  • AYE
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, .COMMISSIONER STEINBRUECK YES
  • THANK YOU, COMMISSIONER FELLEMAN, HI
  • THANK YOU
  • THERE ARE FIVE YESSES AND ZERO NOS FOR THIS ITEM
  • THEN THE MOTION PASSES
  • OKAY
  • WE ARE NOW MOVING ON TO ITEM 11 PRESENTATIONS AND STAFF REPORTS
  • THIS IS THE ITEM WE MOVED AT THE BEGINNING OF THE MEETING
  • CLERK HART, PLEASE READ THE FIRST ITEM INTO THE RECORD
  • EXECUTIVE DIRECTOR WILL THEN INTRODUCE THE ITEM
  • THANK YOU
  • THIS IS AGENDA ITEM 11 A, THE QUARTER 2 2021 FINANCIAL PERFORMANCE BRIEFING, COMMISSIONERS, THE PORT SECOND QUARTER PERFORMANCE STILL SHOWS THE EFFECTS OF COVID 19 PANDEMIC UPON OUR BUSINESSES
  • ALTHOUGH AIRPORT PASSENGER VOLUMES ARE REBOUNDING, IT IS STILL LOWER THAN 2019 LEVELS OVERALL
  • PRUDENT, BUDGETING AND CAREFUL COST MANAGEMENT HAS POSITIONED AS WELL, BUT THERE'S STILL MUCH UNCERTAINTY DUE THE EMERGENT DUE TO THE EMERGING COVID 19 VARIANTS
  • WE'LL CONTINUE TO CLOSELY MONITOR THE SITUATION AND CHANGING BUSINESS CONDITIONS
  • TODAY'S PRESENTATION WILL INCLUDE A PRESENTATION ON THE FINANCIAL PERFORMANCE FROM EACH DIVISION
  • THE PRESENTERS ARE DAN THOMAS, CHIEF FINANCIAL OFFICER
  • ORGAN ANDERSON, DIRECTOR, AVIATION FINANCE AND BUDGET
  • KELLY ZUPON, DIRECTOR, MARITIME FINANCE
  • AND MICHAEL TONG, DIRECTOR, CORPORATE BUDGET FINANCE
  • SO I'LL TURN IT OVER TO DAN
  • DAN, THANK YOU, STEVE
  • GOOD AFTERNOON, COMMISSIONERS
  • CAN WE GET THE PRESENTATION UP ON THE SCREEN, PLEASE? I THINK YOU GO TO THE FIRST SLIDE
  • SO JUST BY WAY OF A QUICK OVERVIEW, STEVE MADE A FEW OF THESE POINTS
  • AGAIN, THE ACTIONS WE'VE TAKEN OVER THE PAST TWO YEARS HAVE WELL POSITIONED US AS WE'RE GOING INTO 2021
  • AND ALSO AS WE'RE PREPARING FOR 2022 DUE TO OUR CAREFUL COST MANAGEMENT AT THE AIRPORT, THERE ARE SOME BRIGHT SIGNS
  • OUR PASSENGER FORECAST ACTUALLY HAS BEEN UPDATED AND IMPROVED SINCE THE BUDGET
  • AND AS YOU WILL KNOW, SEVERAL ROUNDS OF FEDERAL RELIEF FUNDS HAVE DONE A LOT TO HELP SHOW UP
  • THE AVIATION DIVISION FINANCIAL POSITION HAS ENABLED US TO PROVIDE A RATE RELIEF TO OUR AIRLINE AND OTHER TENANTS AND ALSO ENABLED US TO SHOW UP OUR FUND BALANCES
  • AND WE'RE VERY PLEASED TO SEE THE RESTART OF THE CRUISE SEASON
  • WE ARE EXPECTING 83 SAILINGS THIS SEASON
  • CURRENTLY, WE'RE FORECASTING THAT THOSE WILL BE ABOUT 50% OCCUPANCY, BUT WE WILL BE MONITORING THAT TO SEE WHAT THOSE TRENDS ARE
  • WE'RE HOPING OVER TIME WE MIGHT SEE INCREASED OCCUPANCY COMPARED TO THE CURRENT FORECAST
  • AT THIS POINT, LOOKING TO YEAR END, WE ARE FORECASTING THAT OUR EXPENSES AND REVENUES WILL BE CLOSELY ALIGNED WITH THE BUDGET
  • AVIATION IS EXPERIENCING SOME COST PRESSURE, YOU'LL HEAR A LITTLE BIT MORE, LARGELY DUE TO THE SNOW EVENT THAT THEY EXPERIENCED EARLY IN THE YEAR, HAS DRIVEN UP SOME OF THE EXPENSES, BUT THEY'RE WORKING TO MANAGE THAT
  • AND AGAIN, AS STEVE MENTIONED, WE'RE STILL FACING A FAIR AMOUNT OF UNCERTAINTY DUE TO THE COVID VARIANCE
  • SO WE RECOGNIZE THAT IT'S A VERY DYNAMIC ENVIRONMENT AND WILL BE POSITIONED TO MAKE CHANGES IF NEEDED
  • HOPEFULLY WE WON'T
  • AND THEN FINALLY, AS YOU KNOW, THE COMMISSION HAS STEPPED UP AND HAS DONE A LOT TO SUPPORT INVESTMENTS THAT ARE IN THAT RED ECONOMIC RECOVERY
  • SO WITH THAT, I'LL THROW IT OVER TO GORDON
  • I WALK THROUGH THE AVIATION SECTION
  • I THANK YOU, DAN
  • LET'S GO INTO THE NEXT SLIDE, PLEASE
  • LIKE TO START WITH AN OVERVIEW OF HOW OUR PASSENGER ACTIVITY IS COMPARING TO 2019 ON A MONTH BY MONTH BASIS
  • AND AS YOU CAN SEE THROUGH THE FIRST HALF OF THE YEAR, THE RECOVERY HAS BEEN PROGRESSING VERY SMOOTHLY, AND BY THE END OF THE YEAR, WE ANTICIPATE BEING DOWN 26% COMPARED TO 2019
  • IT WAS IN MID JULY THAT WE UPDATED OUR FORECAST WE PREVIOUSLY HAD BEEN TAKING
  • WE WERE GOING TO BE CLOSER TO THE DOWN
  • SO IF WE ACHIEVE THIS AND WE ACKNOWLEDGE THERE'S STILL QUITE A BIT OF RISK, THE DELTA AREAS, WHICH STEVE DISCUSSED AT THE OUTSET OF THE MEETING, IS CERTAINLY A CONCERN
  • BUT IF WE ACHIEVE THIS, WE WOULD REALIZE 90% GROWTH COMPARED TO 2020 AND AS I SAID EARLIER, BE DOWN 26% COMPARED TO 2019
  • NEXT SLIDE, PLEASE
  • AS I DISCUSSED AT THE FIRST QUARTER BRIEFING, THE FEDERAL RELIEF PROGRAMS HAVE MADE A CRITICAL DIFFERENCE TO THE AIRPORT IN 2021 AS THEY DID IN 2020
  • AND WHEN WE PUT TOGETHER THE BUDGET, WE WERE ONLY AWARE OF THE CARE PROGRAM THE FIRST ONE
  • AND SINCE THAT TIME WE'VE HAD TWO ADDITIONAL FEDERAL RELIEF PROGRAMS, THE CRRSAA AND THE ARPA
  • SO WE NOW HAVE A LOT MORE FLEXIBILITY TO ADDRESS FINANCIAL ISSUES THAN WE DID AT THE OUTSET OF THE YEAR
  • BUT JUST AS A REMINDER TO EVERYONE, WHEN WE USE FEDERAL RELIEF GRANTS TO PAY AERONAUTICAL COSTS, WE DON'T INCLUDE THOSE COSTS IN THE RATE BASE
  • AND SO OUR REVENUES, WHICH ARE LARGELY DRIVEN BY COST RECOVERY GO DOWN
  • SO THE VERY FIRST LINE ITEM, WHICH SHOWS A BIG NEGATIVE VARIANCE FOR AERONAUTICAL REVENUES
  • THAT'S ACTUALLY GOOD NEWS BECAUSE WE'RE PASSING ON SOME OF THE BENEFITS OF THE FEDERAL RELIEF GRANTS TO THE AIRLINES THROUGH LOWER COSTS
  • AND AS THE BULLET POINT ON THE RIGHT DOWN NEAR THE BOTTOM SHOWS, BECAUSE OF THIS, WE ACTUALLY IMPLEMENTED A MID YEAR RATE REDUCTION FOR THE AIRLINES
  • WE REDUCED RATES BEGINNING JULY ONE AS A WAY OF MANAGING THE YEAR END SETTLEMENT
  • ON THE NON AERONAUTICAL SIDE, WE'RE ACTUALLY DOING SLIGHTLY BETTER THAN BUDGET, IN SPITE OF THE NEGATIVE NUMBER HERE
  • AND AGAIN, THAT HAS TO DO WITH THE FACT THAT THE SECOND AND THIRD FEDERAL RELIEF PROGRAMS INCLUDED DOLLARS THAT WERE DESIGNATED FOR CONCESSIONNAIRES
  • AND SO WE USED THE GRANT MONEY TO RELIEVE THE TENANTS OF PAYING SOME OF THEIR RENTS
  • AND SO THAT'S WHY WE RECOGNIZED THAT PIECE AS NON OPERATING REVENUE
  • DOWN BELOW, YOU CAN SEE THE 26.7 MILLION IN THE FORECAST COLUMN, BUT CONSEQUENTLY, THE NON AIRLINE REVENUES THAT WE COLLECT FROM OUR TENANTS IS LOWER
  • BUT OVERALL, THIS IS STILL A GOOD SITUATION
  • AND YOU COMBINE THE TWO, AND WE HAVE A POSITIVE NOY IN SPITE OF THE FACT THAT, AS DAN INDICATED, WE ARE FORECASTING TO BE SLIGHTLY OVER BUDGET
  • ON THE COST SIDE, THE BOTTOM HALF OF THE SLIDE SHOWS SOME OF OUR KEY INDICATORS, AND MOST NOTABLY, THE AIRLINE COST PER EMPLOYMENT OR CPE, BECAUSE OF THE FEDERAL GRANTS
  • AND THE INCREASED PASSENGERS IS DOWN SIGNIFICANTLY COMPARED TO BUDGET AND OUR DEBT SERVICE COVERAGE BECAUSE WE'RE USING A LOT OF THE FEDERAL GRANTS TO PAY THE DEBT SERVICE, THAT IS ALSO MUCH STRONGER THAN WE HAD ANTICIPATED AT THE BUDGET TIME
  • AND FINALLY, THE GRANTS AND WE'RE APPLYING THEM IS ALLOWING US TO BUILD UP OUR CASH BALANCE, WHICH WAS ONE OF OUR KEY GOALS FOR 2021
  • AND CAPITAL SPENDING IS RUNNING RIGHT ABOUT TO BE THE FORECASTED SPENDING IS AT 93% OF THE BUDGET
  • SO THAT'S DOING EXTREMELY WELL
  • LET'S GO TO THE NEXT SLIDE, PLEASE
  • ALL RIGHT
  • THIS LOOKS AT OUR COSTS ON A YEAR TO DATE BASIS, AND WE ARE FAVORABLE THROUGH THE FIRST HALF OF THE YEAR
  • BUT IT'S THE FORECAST WE'RE KEEPING OUR EYE ON, AND THAT'S WHERE WE ANTICIPATE SOME CHALLENGES
  • BUT YOU CAN SEE HERE THROUGH MID YEAR, MOST OF OUR SAVINGS ARE THE OUTSIDE SERVICES, AND THAT'S WHERE WE HAVE THE GREATEST ABILITY TO CATCH UP
  • AND THAT'S WHAT TYPICALLY HAPPENS
  • AND THAT'S WHY OUR FORECAST IS INDICATING THAT WE WILL BE OVER BUDGET
  • SO LET'S MOVE ON TO THE NEXT SLIDE, PLEASE
  • IT IS DAN HAD INDICATED WE ARE EXPECTING TO BE SLIGHTLY OVER BUDGET, AND YOU CAN SEE THE BREAKOUT BY SOME OF THE KEY AREAS
  • WE'RE GOING TO BE PRETTY MUCH RIGHT ON FOR PAYROLL OUTSIDE SERVICES WE EXPECT TO BE ABOVE, AND THAT'S REALLY WHAT'S DRIVING IT
  • THERE'S AN AWFUL LOT OF DIFFERENT THINGS GOING ON
  • BUT DAN INDICATED THE SNOW EVENT, WHICH COSTS A LITTLE OVER 2,000,000 DOLLARS IN THE FIRST QUARTER
  • IN EFFECT, WE'RE STILL TRYING TO CATCH UP ON THAT ONE
  • AND THE FINAL BULLET POINT THERE
  • WE HAVE BEEN LOOKING TO HAVE SOME FTES THAT WERE FROZEN APPROVED THIS YEAR
  • THE COST OF THOSE ARE NOT IN THE BUDGET
  • IN MOST CASES, THEY'RE ADDRESSING KEY INITIATIVES THAT WE WILL BE WANTING TO MOVE FORWARD ON IN OUR 2022 BUDGET
  • AND SO WE'RE LOOKING TO HAVE THESE POSITIONS HIRED NEAR THE END OF THIS YEAR TO FACILITATE THAT
  • SO THE COST FOR 2021 IS RELATIVELY MINOR, BUT WE'RE ATTEMPTING TO ABSORB THOSE AS WELL
  • AND THAT'S SOMETHING WE WILL BE TRACKING FOR THE REMAINDER OF THE YEAR
  • NEXT SLIDE, PLEASE
  • NEXT SLIDE, PLEASE
  • OKAY
  • LOOKING AT THE AERONAUTICAL REVENUES AND THE APPLICATION OF GRANTS, AS I INDICATED BEFORE, AS COST RECOVERY
  • WHAT WE'RE DOING BY WHEN WE PAY THE DEBT SERVICE, THE DEBT SERVICE AND THE RIGHT BASE GOES DOWN
  • SO YOU SEE, THE BLACK BOX ON THE RIGHT IS MUCH SMALLER THAN ON THE LEFT
  • AND THE SAME THING WITH ONM, WE'RE APPLYING SOME OF THE GRANT MONEY TO ONM COST, AND THAT IS REDUCING THE OVERALL COST THAT WE RECOVER FROM THE AIRLINES
  • NEXT SLIDE, PLEASE
  • ALL RIGHT
  • THE PURPOSE OF THIS SLIDE IS JUST TO SHOW THE DISTRIBUTION BY COST CENTER BY MAJOR COST CENTER
  • SO WE'RE APPLYING GRANTS ACROSS THE MOVEMENT AREA, THE APRON AREA, THE TERMINAL, AND THE FEDERAL INSPECTION SERVICES AREA, WHICH IS FOR INTERNATIONAL ARRIVALS
  • NEXT SLIDE, AS I INDICATED BEFORE, THE NON AERONAUTICAL REVENUES, WE JUST HAVE TO REMIND OURSELVES THAT THE STATED REVENUES ARE LOWER THAN THE OTHERWISE WOULD BE BECAUSE OF THE FEDERAL RELIEF GRANT
  • SO AS I INDICATED, WE'RE ACTUALLY FORECASTING TO BE AT 193,000,000
  • IF YOU COMBINE THE TWO, EVEN THOUGH THE REPORTED AMOUNT IS 166,000,000, THE DETAIL SLIDES THAT WE GO INTO NEXT WILL BE FOCUSED ON THE 193,000,000 SO WE CAN SHOW A TRUE REPRESENTATION OF HOW THE BUSINESSES ARE DOING
  • THAT'S FINE
  • PLEASE
  • MR COMMISSION PRESIDENT
  • MR ANDERSON, BEFORE YOU GO ON, WE DO HAVE COMMISSIONER BOWMAN WITH HER HAND UP
  • YES, PLEASE GO AHEAD
  • I'M SORRY, COMMISSIONER PRESIDENT, YOU'RE MUTED
  • I'M SORRY
  • I WAS WRESTLING PAPERS
  • COMMISSIONER BOWMAN, SORRY I MISSED YOU
  • PLEASE ASK YOUR QUESTION
  • THANK YOU
  • THANK YOU
  • MORGAN, COULD YOU REMIND US FOR THE TENANT RELIEF, GO BACK TO THE PREVIOUS SLIDE? SORRY, COMMISSIONER ACCIDENTALLY MUTED YOU
  • THAT'S OKAY
  • I'LL TRY AGAIN
  • THANK YOU
  • COULD YOU REMIND US WHAT THE TOTAL AMOUNT OF RELIEF WAS GIVEN TO THE CONCESSIONNAIRES? SO THE TOTAL AMOUNT WILL INCLUDE IT HASN'T ALL BEEN GIVEN
  • SO WE'VE GOT 5.3 MILLION FROM THE CRRSAA A PACKAGE AND 21.5 OR THE ARPU, SO THAT WILL TURN OUT TO BE 26.8 MILLION IN TOTAL
  • AND IT'S SOME OF THE WORK IS STILL BEING DONE IN THE PORT
  • GRANTS WERE SO LATE IN COMING, AND I UNDERSTAND THAT WILL ACTUALLY HAPPEN IN OCTOBER
  • OKAY
  • I'M SORRY
  • LET ME ASK A QUESTION IN A DIFFERENT WAY
  • I APOLOGIZE
  • NOW
  • I CAN READ THAT AND ADD THAT MONEY UP
  • WHAT IS THE TOTAL AMOUNT THAT IS DUE TO THE PORT FROM CONCESSIONAIRES? WE GAVE THEM RENT REALLY DEFERRED RIGHT ON THE FERRY
  • SO THE AMOUNT OF RENT RELIEF THAT IS OUTSTANDING
  • YOU'RE RIGHT
  • I DID INCLUDE A SLIDE ON THAT IN THE FIRST QUARTER, AND I DON'T HAVE IT HERE
  • I HAVE TO FOLLOW UP AND GIVE THAT TO YOU
  • FOR THE MOST PART, IT'S NOT BEING PRESENTED BECAUSE IT'S ACTUALLY GOING REALLY WELL
  • WE DON'T HAVE ANY CONCERNS AT THIS POINT WITH THE COLLECTIONS
  • OTHERS ARE PRETTY MINOR ONES
  • AND SOME OF THE CONCESSION AREAS WERE ON A MULTI YEAR REPAYMENT PLAN AND THE REPAYMENTS ARE OCCURRING
  • SO DIDN'T PRESENT IT THIS TIME BECAUSE IT DIDN'T SEEM TO BE A BIG ISSUE TO HIGHLIGHT
  • BUT I CAN CERTAINLY UPDATE THAT AND SEND IT TO YOU
  • THANKS
  • I'D APPRECIATE IT
  • I GUESS WHERE I'M GOING WITH THIS IS THAT IF WE ARE PROVIDING 26,000,000 DOLLARS IN RELIEF, WHICH ESSENTIALLY JUST IS MONEY THAT THE PORT IS GOING TO GET FOR RENT THAT WE HAVEN'T GOTTEN YET, WE'RE KEEPING OUR OWN MONEY, BUT THEN WE'RE ALSO KEEPING 75,000,000 DOLLARS IN RESERVE
  • SO I WANT TO UNDERSTAND HOW MUCH MORE IS OUTSTANDING FROM THE CONCESSIONAIRE, WHAT'S THE DELTA BETWEEN THAT
  • SO THANK YOU FOR PROVIDING THAT LATER
  • OKAY
  • THAT MAKES SENSE
  • I THINK SO
  • JUST TO BE CLEAR, THOUGH, THIS 26,000,000 IS DESIGNATED AS PART OF RELIEF PACKAGES TO ONLY GO TO CONCESSIONNAIRES
  • AND THAT'S DIFFERENT FROM THE OTHER GRANT MONEY, WHICH REALLY COMES TO THE AIRPORT
  • AND WE GET TO CHOOSE HOW WE USE IT
  • WE HAVE NO CHOICES ABOUT THIS MONEY
  • ONCE WE COME UP WITH A PROGRAM FOR HOW IT GETS ALLOCATED BY TENANT, THEN THAT AS LONG AS THE TENANTS FULFILL THE ELIGIBILITY REQUIREMENTS, THEY WILL GET THEIR SHARE THE REST OF THE FEDERAL RELIEF
  • WE GET TO CHOOSE HOW WE USE IT BETWEEN DEBT SERVICE, ONM
  • AND WE ALSO GET TO CHOOSE WHEN WE USE IT, WHICH IS HOW MUCH HOW MUCH WE USE THIS YEAR VERSUS FOR FUTURE YEARS
  • THAT'S HELPFUL
  • NO, I'M WELL AWARE OF THAT
  • THANK YOU
  • BUT MY QUESTION WAS ABOUT THE 75,000,000 IN RESERVE, AND SO I JUST WANT TO UNDERSTAND WHAT THE DELTA IS REMAINING FOR THE DEFERRED RENTS FROM THE TENANTS
  • BUT AGAIN, YOU CAN GET ME THAT OFFLINE
  • THANK YOU
  • OKAY
  • NEXT SLIDE, PLEASE
  • SO
  • WELL, LET'S GO BACK ONE, PLEASE
  • SORRY
  • SO THIS SHOWS THE NON AERONAUTICAL BUSINESSES
  • AND AS I SAID BEFORE, OVERALL, WE'RE ANTICIPATING TO BE SLIGHTLY ABOVE FORECAST, AND MOST OF THAT IS DUE TO THE INCREASED PASSENGER LEVELS
  • BUT INSIDE THAT IF WE LOOK AT THE BUSINESS UNITS, THERE'S SOME DIFFERENT THINGS GOING ON
  • AND WHAT WE SEE FROM THE GREEN LINE, WHICH IS THE FORECAST COMPARED TO THE BLUE LINE, WHICH IS THE BUDGET
  • PUBLIC PARKING IS AGAIN DOING ONE OF OUR RELATIVELY STRONGER PERFORMANCE, AND THAT JUST REFLECTS THE CHOICE OF PASSENGERS RIGHT NOW TO DRIVE
  • IF WHO ARE DRIVING TO THE AIRPORT, THEY WOULD RATHER PARK AND CHOOSE OTHER MODES
  • RENTAL CARS IS ALSO ABOVE BUDGET, BUT IT'S REALLY DUE TO A PHENOMENON OF A SHORTAGE OF AUTOMOBILES AND THEREFORE MUCH HIGHER PRICING FROM THE RENTAL CARS AS OPPOSED TO HIGHERS ACTIVITY
  • BUT WE'RE BENEFITING BECAUSE WE GET A PERCENTAGE OF THEIR RENT AND THEIR RENT IS QUITE A BIT HIGHER
  • THE OTHER AREAS ARE ACTUALLY POINTING IN THE OTHER DIRECTION
  • GROUND TRANSPORTATION HAS NOT RECOVERED THE LEVELS THAT WE HAD EXPECTED
  • TAXIS, TNCS THEY'RE ALL A LITTLE BIT DOWN
  • DINING AND RETAIL IS STILL COMING IN LOWER THAN EXPECTED
  • AND AS YOU PROBABLY READ IN THE PAPER EARLIER THIS WEEK, THERE HAVE BEEN STAFFING SHORTAGES AND THAT HAS CHALLENGED MANY OF THE CONCESSIONAIRES
  • SO IN TERMS OF BRINGING THEIR BUSINESS BACK AND IN THE OTHER CATEGORY, WE'RE SEEING THAT THE INFLIGHT MEALS AND OUR OWN LOUNGES JUST ARE BEING IMPACTED BY THE LOWER INTERNATIONAL TRAFFIC IN PARTICULAR
  • NEXT SLIDE, PLEASE
  • AND THIS IS JUST A LOT OF NUMBERS HERE, BUT THE KEY IS WE'RE USING THE GRANT MONIES IN WAYS WHICH IS REALLY HELPING OUR DEBT SERVICE COVERAGE
  • AND THAT'S WHY WE'RE GOING TO BE WELL WELL ABOVE WHERE WE NEED TO BE
  • I'LL SHOW IN A SUBSEQUENT SLIDE THAT WE WILL HAVE SOME FLEXIBILITY TO MAKE SOME DECISIONS STILL TO MOVE SOME GRANT MONEY AROUND ONE WAY OR THE OTHER
  • IF WE FIND OURSELVES, IF THINGS TAKE A TURN FOR THE WORSE, WE COULD CONCEIVABLY EXCEL SOME OF THE GRANT MONEY BACK INTO 2021
  • IF WE HAVE A STRONG FINISH TO THE YEAR, WE COULD ACTUALLY MOVE SOME OF THAT MONEY INTO 2022 TO GIVE US SOME FLEXIBILITY TO MANAGE AIRLINE RATES NEXT YEAR
  • LET'S GO TO THE NEXT SLIDE, PLEASE
  • ALRIGHT, LOOKING AT OUR CAPITAL SPENDING, AS I SAID EARLIER, WE'RE PROJECTING TO BE ABOUT 93% OF BUDGET WHICH BY HISTORICAL STANDANDS WOULD BE EXCELLENT
  • WE'VE BROKEN OUT SOME OF THE BIG BLOCKS OF SPENDING AND YOU CAN SEE THE NORTH SATELLITE IS ACTUALLY EXPECTED TO BE DOWN
  • MY UNDERSTANDING IS THAT THIS LIKELY DOES REPRESENT SOME SAVINGS ON THE IDF
  • THIS IS PURELY A TIMING DIFFERENCE
  • THIS DOES NOT REPRESENT SAVINGS AND THE BAGGAGE OPTIMIZATION OR CHECK BAG HERE
  • THIS REFLECTS SOME ACCELERATION OF SOME SCOPE ON A LONG TERM PROJECT, SO THAT'S REALLY A TIMING ISSUE THERE AND EVERYTHING ELSE IS REASONABLY CLOSE
  • SO OTHER THAN THE NORTH SATELLITE, MIA AND BAGGAGE OPTIMIZATION, YOU COULD SAY WE'RE PRETTY MUCH IN LINE HERE
  • NEXT SLIDE, PLEASE
  • ALRIGHT, SO THIS IS A LOT OF BUSY NUMBERS HERE
  • APOLOGIZE, BUT WANTED TO GIVE YOU A VIEW OF THE FEDERAL RELIEF THAT WE USED LAST YEAR AND WHAT WE'RE PLANNING TO USE THIS YEAR AND THEN THE 75,000,000 THAT WE'RE RESERVING FOR NEXT YEAR AND HOW THAT LOOKS
  • AND YOU CAN SEE THAT THE CONCESSIONS PIECE GOING TO COMMISSIONER BOWMAN QUESTION
  • WE DO FULLY EXPECT TO USE THAT THIS YEAR
  • THE TIMING OF IT HAS BEEN SLIGHTLY DELAYED, BUT WE STILL THINK WE CAN ACCOMPLISH THAT THIS YEAR
  • BUT THE 75,000,000 WOULD BE WHAT'S LEFT OF THE ARPA MONEY THAT WE WOULD BE WITHHOLDING TO NEXT YEAR ON THE RIGHT
  • YOU CAN JUST SEE HOW WE'RE DEPLOYING THE GRANT MONEY BY COST CENTER AND THE CONCESSIONS PIECE DOWN AT THE BOTTOM IS THAT PORTION OF THOSE GRANTS THAT ARE A LITTLE DIFFERENT AND THEY'RE SPECIFICALLY DESIGNATED FOR THE CONCESSIONNAIRES
  • NEXT SLIDE PLEASE
  • AND I TALKED EARLIER ABOUT THE IMPORTANCE OF BUILDING OUR CASH BALANCE OR AIRPORT DEVELOPMENT FUND, ADF
  • AND WE'RE ACTUALLY ONE OF OUR LOW POINTS OF THE YEAR RIGHT ABOUT NOW
  • AND AS WE START CLAIMING MORE OF THE GRANT MONEY AND WE SEE A STRONGER FINISH TO THE YEAR WITH MORE NON A NAUTICAL REVENUES AND AIRLINE REVENUES WILL BE BUILDING OUR CASH BALANCE BACK UP
  • AND WE EXPECT TO FINISH THE YEAR WELL ABOVE THE 12 MONTH ON TARGET, WHICH WOULD HAVE BEEN ABOUT 340,000,000 DOLLARS
  • SO WE APPEAR TO BE IN GOOD SHAPE HERE
  • NEXT SLIDE PLEASE
  • AND FINALLY, JUST A QUICK OVERVIEW OF THE 2021 BOND ISSUE THAT CLOSED ON JUNE 30 TH
  • IT WAS BOTH THE REFUNDING AS WELL AS A NEW MONEY ISSUE, AND IT WENT WELL
  • WE REALIZED SOME NET PRESENT VALUE SAVINGS AND WE REALIZED SOME PRETTY LOW INTEREST RATES OVERALL A REALLY IMPORTANT SUCCESS FOR THE PORT AS A WHOLE
  • NEXT SLIDE PLEASE
  • NOW I'LL TURN IT OVER TO KELLY
  • GREAT
  • THANKS, MORGAN
  • GOOD AFTERNOON
  • COMMISSIONERS AND EXECUTIVE DIRECTOR METRUCK
  • I WILL NOW WALK YOU THROUGH THE SEAPORT OPERATING DIVISIONS, MANAGING DIRECTORS STEPHANIE JONES STEBBANS AND DAVE MCFADDEN WITH US AS WELL AND MAY INTERJECT ALONG THE WAY
  • THIS SLIDE IS A ROLL UP OF THE ENTIRE SEAPORT
  • THE KEY TAKEAWAY HERE IS THAT WE ARE FORECASTING OPERATING INCOME TO END THE YEAR JUST OVER 2,000,000 DOLLARS FAVORABLE TO BUDGET
  • CRUISE AND GREEN REVENUE ARE LOOKING TO BE FAVORABLE TO BUDGET, WITH CONFERENCE AND EVENTS IN OUR REVENUE APPEARING TO TAKE A LITTLE LONGER RECOVERING FROM THE PANDEMIC YEAR TO DATE
  • REVENUES ARE PRIMARILY IMPACTED BY TIMING OF CRUISE REVENUES, WHICH WILL GO OVER IN THE COMING SLOTS
  • THE NEXT SLIDE PLEASE
  • NEXT SLIDE AS WELL
  • THANKS
  • NOW WE'LL DISCUSS THE MARITIME DIVISION
  • MARITIME OPERATING INCOME IS FORECAST ABOUT 2.6 MILLION DOLLARS FAVORABLE TO BUDGET WITH POTENTIAL UPSIDE AS WE SEE INCREASES IN RECREATIONAL BOATING DEMAND
  • SO I THINK AND ALSO WE'RE SEEING SOME INCREASED NUMBERS AND CRUISE PASSENGERS AS WELL
  • WE'VE RECENTLY COMMENCED THE CRUISE SEASON WITH 83 CALLS GET SCHEDULED, GENERATING REVENUES EXPECTED HIGHER THAN BUDGET
  • THE GRAIN TERMINAL CONTINUES TO OVER PERFORM, AND WE'VE COMPLETED AND MADE STRONG PROGRESS IN SEVERAL PROJECTS, INCLUDING SIPA REVIEW PROCESS AT PIER 66, SHORT POWER, THE TERMINAL 46 STORMWATER TREATMENT AND DOCK REHAB CONSTRUCTION
  • TERMINAL 30 BULKHEAD STABILIZATION
  • AND WE'RE GETTING CLOSE TO COMPLETION AT THE TERMINAL 117 RESTORATION WITH PLANNING, IRRIGATION, OBSERVATION PLATFORM AND GRIP WALL
  • NEXT SLIDE PLEASE
  • WITH THE RESTART OF CRUISE
  • WE WANTED TO SHOW YOU WHAT WE ARE FORECASTING AND HOW IT COMPARES TO OUR LAST FULL YEAR
  • YOU CAN SEE WE ARE PHASING SAILINGS IN OVER FOUR MONTHS WITH OCTOBER HAVING TWICE AS MANY AS SCHEDULED IN 2019
  • WE ORIGINALLY ESTIMATED ABOUT 50% OCCUPANCY, WHICH YOU SEE HERE IN THE 2021 ESTIMATED PASSENGERS, BUT ABOUT A DAY OR TWO AGO WE GOT THE ACTUAL ACTIVITY FOR THE FIRST SEVERAL SAILINGS, AND IT'S LOOKING CLOSER TO THAT 60 TO 70% MARK
  • NEXT SLIDE, PLEASE
  • HERE WE SHOW THAT YEAR TO EIGHT FINANCIALS
  • AS MENTIONED PREVIOUSLY, THE REVENUE VARIANCE TO BUDGET IS DRIVEN BY REVENUE RECOGNITION OF THE NCL LEASE
  • BASICALLY, WE BUDGET REVENUE TO OCCUR MONTH EVENLY ACROSS THE MONTH, BUT IT ACTUALLY OCCURS TYPICALLY IN THE THIRD QUARTER WHEN WE INVOICE THE CUSTOMER
  • ALSO, WE BUDGETED PASSENGER REVENUE BASED ON HISTORIC FACING
  • BUT AS YOU SAW IN THE PREVIOUS SLIDE, MOST OF THAT REVENUE IS GOING TO COME IN IN THE SECOND HALF, BUT WE ARE EXPECTING A HIGHER YEAR OVER YEAR REVENUE AND NOI IS FAVORABLE DUE TO INCREASED GRAIN VOLUMES
  • A COUPLE ITEMS TO NOTE ON THE FAVORABLE EXPENSE VARIANCE
  • FIRST, WE CHANGE THE ALLOCATION METHODOLOGY AND MAINTENANCE, WHICH MOVES SOME COSTS FROM MARITIME TO ECONOMIC DEVELOPMENT
  • AND SECOND, WE ARE READING UTILITY METERS FOR THE FIRST TIME IN ABOUT A YEAR, SO THERE WILL BE SOME VARIANCES IN QUARTER THREE
  • AS WE TRUE UP WHAT WE ARE ESTIMATES, CAPITAL SPENDING IS PICKING UP AND EXPECTED TO END THE YEAR AT ABOUT 83% OF BUDGET
  • MORGAN, CAN I HAVE A QUESTION FOR YOU? SO DID ANY OF THE CRUISE LINES CLAIM, YOU KNOW, INABILITY TO PAY OR, YOU KNOW, FORCE MAJEURE? IN 2021 THEY ARE PAYING BY PASSENGERS
  • AND OF COURSE, THERE IS A LEASE PAYMENT FOR NCL WHICH WILL ALSO BE DUE
  • SO THE WE HAVE IN TERMS OF PASSENGER ANNUAL GUARANTEES, THOSE WILL NOT BE MET, SO OUR PASSENGER ANNUAL GUARANTEES WILL NOT BE MET ISSUE
  • IS THERE ANY PENALTIES ASSOCIATED WITH THAT? I BELIEVE THAT IS ACTUALLY FOR MEASURE, BUT I WILL FOLLOW UP WITH YOU, COMMISSIONER
  • OKAY
  • I KNOW WE ALWAYS HAVE THAT ISSUE WITH THE CONTAINER VESSELS THAT, YOU KNOW, THERE IS A PENALTY, BUT WHEN THERE'S A REAL PROBLEM, THEN THERE'S A QUESTION ABOUT HOW MUCH OF THE PENALTY YOU CAN GET BACK
  • BUT WE USUALLY COLLECT SOMETHING AS WE HAVE COLLECTED OUR LEASE PAYMENTS, COMMISSIONER, AND WE ARE COLLECTING OUR PASSENGER FEES
  • EXCELLENT
  • THANK YOU
  • NEXT SLIDE, PLEASE
  • OKAY
  • HERE
  • YOU SEE THE STORM WATER UTILITY THAT IS TRACKING FAVORABLE TO BUDGET
  • YOU WILL BE BRIEF NEXT MONTH ABOUT THE RATE STRUCTURE AND SOME OTHER ITEMS AS WELL, SO I MAY DEFER THAT
  • ANY QUESTIONS TO THAT TEAM? MAYBE NEXT MONTH? THE NEXT SLIDE, PLEASE
  • HERE IS A HIGH LEVEL SUMMARY OF THE PORT ALLIANCE YEAR TO DATE PERFORMANCE
  • CARGO VOLUMES ARE UP SIGNIFICANTLY FROM THE FIRST HALF OF 2020
  • HOWEVER, THIS INCREASED REVENUE IS OFFSET BY THE RESTRUCTURING OF THE APL AGREEMENT OPERATING EXPENSES, YEAR TO DATE OR BELOW BUDGET
  • THERE IS SOME TIMING VARIANCE, SO WE EXPECT THAT GAP TO CLOSE IN THE SECOND HALF A LITTLE BIT
  • NEXT SLIDE, PLEASE
  • THIS REFLECTS THE FULLY BURDEN IMPACT OF THE JOINT VENTURE WITH THE NORTHWEST SEA PORT ALLIANCE
  • YOU SEE, JUST OVER 1.1 MILLION OF FAVORABLE DISTRIBUTABLE INCOME IS OFFSET BY 620,000 DOLLARS ENVIRONMENTAL RESERVE TIED TO CONTAMINATION DISCOVERED DURING THE TERMINAL FIVE CRANE RAIL WORK
  • NEXT SLIDE, PLEASE
  • NOW WE'LL MOVE ON TO THIS
  • OKAY
  • SURE
  • I JUST WANTED TO TAKE A LOOK AT IN TERMS OF ALL THE MARITIME DIVISIONS, THE JOINT VENTURE
  • THIS IS THE HIGHEST SOURCE OF REVENUE, ISN'T IT? YES, IT'S THE HIGHEST SOURCE
  • THE WAY IT COMES ACROSS IS WE ACTUALLY GET THE NET INCOME SHOWS UP
  • AS YOU LOOK AT THIS SLIDE, YOU SEE JOINT VENTURE REVENUE
  • THAT'S ACTUALLY OUR SPLIT OF THE YEAR TO DATE
  • NET INCOME MINUS
  • THERE'S A COUPLE OF ADDITIONAL ENTRIES IN THERE, BUT IT'S THE CASH DISTRIBUTION THAT WE GET FROM THEM
  • YES, IT'S FROM OPERATING INCOME STANDPOINT, DEFINITELY THE HIGHEST OF ALL THE GROUPS
  • SO I'M JUST THINKING, LIKE, WE JUST DECIDE AN OPERATING AGREEMENT WITH THE ALLIANCE WITH REGARDS TO THE CBP BUILDING, AND THERE ARE OTHER OPPORTUNITIES POTENTIALLY, LIKE FOR ADD TO OWN OR OPERATE IS A WAREHOUSE, A NEAR DC WAREHOUSE FOR USE BY THE ALLIANCE
  • SO I'M JUST WANTING JUST FROM AN ACCOUNTING PERSPECTIVE
  • SO THE THE ALLIANCE WILL BENEFIT FROM THE REVENUE, WHICH WILL GET HALF OF, BUT THE EXPENSE OF THAT WILL SHOW UP IS JUST THE PORT OF SEATTLE, BUT IT WON'T SHOW UP ON THE IT WON'T SHOW UP AS A PART OF THE JOINT VENTURE
  • NO, WE TYPICALLY WILL CHARGE IF IT'S PART OF
  • SO YOU'VE GOT TWO DIFFERENT SETUPS
  • YOU HAVE ANYTHING THAT THE ALLIANCE GETS AND SPLIT 50 50 WITH US
  • ANY ASSOCIATED COSTS WE WILL TYPICALLY CHARGE TO THE ALLIANCE AS WELL
  • NOW, THERE ARE SOME OF THE COSTS THAT YOU SEE BELOW ON THIS SLIDE, THE EXPENSES DOWN BELOW
  • THESE ARE THESE ARE COSTS ASSOCIATED WITH BOTH, SOME AT THE PLACE WE'RE LEASING AT TERMINAL 46, BUT ALSO A LOT OF ENVIRONMENTAL COSTS THAT AREN'T ELIGIBLE TO CHARGE TO THE ALLIANCE PER OUR CHARTER, BUT THEY ARE COSTS ASSOCIATED WITH THOSE PROPERTIES IN THERE AS WELL
  • AN EXAMPLE WOULD BE COSTS ASSOCIATED WITH SOME OF THE TRAINING ON THE CRANES THAT WE PURCHASED AS WELL
  • OKAY
  • I JUST DON'T WANT TO PLUG THIS
  • SO THESE ARE ALL HOME PORT EXPENSES THAT WE INCUR THAT WE DON'T SHARE, AND THAT'S ALWAYS A TUG OF WAR
  • WHAT'S HOME PORT OR WHAT'S NOT? BUT THESE ARE STRAIGHT UP HOME PORT EXPENSES
  • SO WHAT I'M THINKING OF IS A PROPERTY THAT GENERATES REVENUE, BUT IT'S JUST A PORT OF SEATTLE ASSET, BUT IT'S GENERATING REVENUE TOWARDS ALLIANCE OPERATIONS
  • SO, I MEAN, SO WE WOULD SO WE WOULD BE LEASING THE PROPERTY OR SOMETHING, LIKE TO THE ALLIANCE, OR I'M JUST WONDERING, HOW WOULD THAT SHOW UP IF WE WERE TO WOULD IT JUST BE LIKE THE EDD DIVISION ISSUES, OR IS THERE A WAY TO ACTUALLY REFLECT ANY OFF SITE INVESTMENTS THAT WE MAKE THAT DIRECTLY BENEFIT ALLIANCE OPERATIONS? INSIGHT ON THAT, JUST IN TERMS OF BECAUSE I WANT TO MAKE IT CLEAR THAT THERE'S GREAT WAYS IN WHICH THE PORT CAN BENEFIT DIRECTLY FROM THE ALLIANCE, BUT SEPARATE FROM THE ALLIANCE
  • WELL, I THINK WE'RE IN A BIT OF UNCHARTED WATERS
  • I WOULD SPECULATE IF WE BOUGHT A PIECE OF PROPERTY AND IT WAS FOR THE ALLIANCES USE, WE PROBABLY LICENSE IT OR LEASE IT IN SOME WAY TO THEM, AND THAT WOULD THEN WASH THROUGH
  • BUT IT WOULD BE A HOME IMPORTANT RESPONSIBILITY, IN MY VIEW, TO PURCHASE OR REQUIRE CONTROL THE PROPERTY, BUT WE WOULDN'T JUST PUT IT INTO THE MIX FOR THE ALLIANCE WITH NO CONSIDERATION IS MY POINT
  • I WAS TRYING TO SEE HOW IT WOULD SHOW UP ON THE SPREADSHEET
  • IT WOULD BE REVENUE THAT WE WOULD GARNER FROM THE ALLIANCE
  • THAT WOULD BE, I DON'T KNOW
  • THAT WOULD THEN BE SPLIT WITH THE TACOMA IF WE BOUGHT THE PROPERTY
  • ANYWAY, IT'S A LITTLE THEORETICAL AND MAYBE UNCHARTED PROPERTY, BUT WE JUST HAD THAT CONVERSATION IN THE RETREAT WHERE IT SEEMS LIKE SINCE WE HAVE THE HOME PORT REAL ESTATE IN OUR BACKYARD, WE SHOULD BE EXPLORING OPPORTUNITIES LIKE THIS
  • I JUST WANT TO KNOW IF THIS IS AS LUCRATIVE PATH FORWARD IS
  • IT JUST APPEARS TO ME AND DAN, DID YOU HAVE SOMETHING TO WEIGH IN ON HERE? YEAH, I WAS JUST GOING TO ADD COMMISSIONER, I THINK IS DAVE ALLUDED TO SOME OF THIS IS UNCHARTED WATERS
  • I THINK IT'S GOING TO DEPEND ON THE SPECIFIC TYPE OF A TRANSACTION, WHETHER IT WAS THE PURCHASE OF A NEW PROPERTY VERSUS LEASING OF AN EXISTING PROPERTY
  • I THINK THE DEFAULT ON AN EXISTING PROPERTY, THE REVENUE WOULD PROBABLY GO TO THAT BUSINESS UNIT, FOR EXAMPLE, IF IT'S COMMERCIAL REAL ESTATE, IT WOULD PROBABLY GO TO THE PORTFOLIO MANAGEMENT
  • SO I DON'T THINK WE HAVE ALL THE ANSWERS TO THESE BECAUSE THIS IS KIND OF NEW AND DIFFERENT
  • SO WE'LL PROBABLY HAVE TO LOOK AT EACH OF THESE TYPES OF TRANSACTIONS AS THEY COME ALONG AND TRY TO FIGURE OUT THE BEST ACCOUNTING TREATMENT
  • YEAH, WELL, I GUESS I WOULD JUST LIKE TO LOOK TO YOU GUYS TO SEE WHAT IS THE BEST WAY FOR US TO STRUCTURE IT FOR OUR BENEFIT AND TELL US HOW THAT MIGHT BE ABLE TO BE DONE IN A WAY THAT WE CAN HAVE THAT JOINT BENEFIT, BUT LEVERAGING OUR RESOURCES ANYWAY
  • OKAY
  • THANK YOU
  • THANKS, MR FELLEMAN NOW WE'LL MOVE ON TO THE ECONOMIC DEVELOPMENT VISION
  • EXCELLENT REVENUES ARE FORECASTED ABOUT 1.3 MILLION BELOW BUDGET AT THE CONFERENCE AND EVENT CENTER IN BELL STREET GARAGE
  • ON A GOOD NOTE, WE DID GET ENOUGH TRAFFIC FOR THE FIRST MONTH OF CONCESSION REVENUE OR BASICALLY VARIABLE REVENUE AT THE GARAGE, AND WE'RE HOPING TO SEE THAT TREND CONTINUE THROUGH THE BACK HALF OF THE YEAR
  • ON THE OPERATING EXPENSE SIDE, WE ANTICIPATE SAVINGS AND VARIABLE CONFERENCE CENTER EXPENSES AND DEFERRING ABOUT 300,000 DOLLARS OF WASHINGTON TOURISM ALLIANCE SPEND TO EARLY 2022
  • MAINTENANCE IS EXPECTED TO BE UNFAVORABLE DUE TO THE ALLOCATION THAT I MENTIONED EARLIER, AND SEVERAL HIGHLIGHTS FOR THE QUARTER INCLUDE EXECUTION OF THE TERMINAL 106 GROUND LEADS CONTINUED PROGRESS ON RENT DEFERRAL PROGRAM WITH SIX ADDITIONAL TENANTS PAID OFF, LEAVING 13 LEFT IN THE PROGRAM
  • AND ALSO THERE WAS SIGNIFICANT GROWTH AND PROPORTIONS OF BOTH WMBE AND SMALL BUSINESS SPEND IN THE QUARTER
  • NEXT SLIDE PLEASE
  • HERE WE CAN SEE YEAR TO DATE, NET INCOME IS ABOUT 380,000 UNFAVORABLE THE BUDGET AND 269,000 LOWER THAN 2020
  • MOST OF THIS IS DRIVEN BY COVID 19 IMPACTS OF THE CONFERENCE CENTERS AND BELL STREET GARAGE
  • CAPITAL SPEND IS FORECASTED AT 71% OF BUDGET WITH MUCH OF THAT VARIANCE DUE TO THE EXPENSE PORTION OF THE BELL HARBOR MODERNIZATION PROJECT ADDED TO THE BUDGET
  • YET IT WAS ACTUALLY APPLIED AS AN EXPENSE AT THE END OF 2020 AND THAT CONCLUDES THE SEAPORT SIDE, IF ANY QUESTIONS OTHERWISE
  • BYE
  • I'LL HAND IT UP TO MICHAEL
  • THANK YOU, KELLY
  • GOOD AFTERNOON
  • NEXT SLIDE PLEASE
  • FOR CENTRAL SERVICES, WE ARE FORECASTING A 1,900,000 FAVORABLE BUDGET VARIANCE ON OPERATING REVENUES DUE TO UNBUDGETED FOR FEATURES REVENUE FROM THE POLICE DEPARTMENT
  • ON THE EXPENSE SIDE, EVEN THOUGH WE EXPECT MOST CENTRAL SERVICES DEPARTMENTS WILL COME IN BELOW BUDGET THIS YEAR, WE ARE FORECASTING A 1,200,000 UNFAVORABLE BUDGET VARIANCE MAINLY DUE TO THREE REASONS
  • FIRST, WE ADD A BUDGETED 2,000,000 TO THE EM4 CARS UP TO YOUR APPROVAL OF THE ADDITIONAL OPPORTUNITY OF INITIATIVE SPENDING IN MAY
  • THE SECOND BUSINESS THAT STILL TO SOME OF THE BUDGETED OUTSIDE LEGAL EXPENSES
  • AND THE THIRD REASON IS THAT WE HAVE LOWER CHARGES TO CAPITAL PROJECTS THAN BUDGETED IN BOTH ENGINEERING AND PCS
  • SO ON THE RIGHT HAND SIDE IS A SEVERAL BUSINESS HIGHLIGHT
  • YOU CAN FIND MORE IN THE WRITTEN REPORT IN YOUR PACKAGE
  • I WILL TALK ABOUT THE 2,000,000 OPPORTUNITY YOU IN THE SHIP, SOME OF YOU AND THE PORT LEADERS JOIN WASHINGTON STATE LEADERS IN THE CLIMATE BILL SIGNING, WHICH INCLUDE GREENFIELD STANDARD
  • IT'S ALSO WORTH TO NOTE THAT THE PORT PARTICIPATED IN THE CONSTRUCTION TRADE OUTREACH EVENTS TO ENCOURAGE MORE PARTICIPATION OF WOMEN AND PEOPLE OF COLOR IN CONSTRUCTIONS APPRENTICESHIP PROGRAMS NEXT SLIDE PLEASE
  • THE YEAR TO THE FINANCIAL NUMBERS ARE QUITE GOOD FOR CENTRAL SERVICES COMPARED TO THE BUDGET, TOTAL OPERATING REVENUES ARE 1.9 MILLION HIGHER THAN THE BUDGET AND 355,000 HIGHER THAN THE SAME PERIOD LAST YEAR
  • TOTAL OPERATING EXPENSES OF 3.1 MILLION FAVORABLE TO THE BUDGET AND 385,000 LESS THAN LAST YEAR
  • THE 3,100,000 FAVOR BUDGET VARIANCE IN TOTAL OPERATING EXPENSES IS DUE TO DELAY IN CONSCIOUS SPENDING AND HIRING
  • THE FAVORABLE BUDGET AREAS IS POSSIBLY OFFSET BY SOME UNBUDGETED OUTSIDE LEGAL SERVICES AND LOWER CHARGE TO CAPITAL PROJECTS
  • NEXT SLIDE PLEASE
  • SO THESE ARE THE ESSENTIAL SERVICE NUMBERS
  • NOW LET'S MOVE TO PORT WIDE FINANCIAL
  • NEXT SLIDE PLEASE
  • FOR THE FIRST HALF THE YEAR, TOTAL OPTING REVENUES, 46,000,000 UNFAVORABLE TO THE BUDGET AND 10 10,000,000 LOWER THAN 2020 TOTAL OPERATING EXPENSES, 30,000,000 FAVORABLE TO THE BUDGET AND 2,000,000 LOWER THAN 2020 DUE TO LOWER PAYROLL COSTS
  • AS A REMINDER, WE HAVE FROZEN AND ELIMINATED A TOTAL 167 FT IN THE 2021 BUDGET
  • SO THE SIGNIFICANT BUDGET SAVING THERE
  • ALSO THAT THIS QUESTION WERE SPENDING IS ALSO LOWER THAN LAST YEAR DUE TO ALL THE BUDGET REDUCTION EFFORT THAT WE PUT INTO THE 2021 BUDGET LAST YEAR
  • NET OPERATING INCOME BE 40 [inaudible 01:26:58] 33,000,000 UNFAVORABLE TO THE BUDGET AND 8,300,000 LOWER THAN LAST YEAR
  • NEXT SLIDE, PLEASE
  • SO FOR THE FULL YEAR BEFORE COSTING THE TOTAL OPERATING REVENUES TO BE 170,000,000 UNFAVORABLE TO THE BUDGET, BUT 62,000,000 HIGHER THAN LAST YEAR
  • AGAIN, IT'S IMPORTANT TO NOTE THAT THE FEDERAL WE LIVE HELP OFFSET 107,000,000 OF OUR NAUTICAL REVENUE FOR 2021
  • AS BORGAN POINTED OUT ONLY EARLIER ON THE EXPRESSES SIDE, WE ARE FORECASTING 1,900,000 UNFAVORABLE VARIANCE TO THE BUDGET AND THEN ALSO 16,000,000 HIGHER THAN LAST YEAR
  • IT'S IMPORTANT TO NOTE THAT THE PORT ALSO GET 17.2 MILLION STATE PENSION CREDIT LAST YEAR
  • SO IF WE ADJUST FOR THE 17.2 PENSION STATE PENSION CREDIT, THE OPERATING EXPENSES FORECAST WOULD HAVE BEEN 600,000 LOWER THAN LAST YEAR
  • NEXT SLIDE, PLEASE
  • LAST BUT NOT LEAST IS THE PORTWIDE CAPITAL SPENDING SUMMARY
  • THE TOTAL CAPITAL SPENDING WAS 212,000,000 FOR THE FIRST HALF OF THE YEAR
  • FOR THE FULL YEAR, WE EXPECT TO SPEND A TOTAL OF OVER 495,000,000, WHICH IS 92% OF THE BUDGET THIS YEAR
  • THAT CONCLUDE OUR PRESENTATION
  • I LIKE TO NOTE THAT THERE ARE MORE SLIDES IN APPENDIX AND THAT WILL PROVIDE MORE INFORMATION TO YOU
  • AND ALSO YOU CAN FIND MORE INFORMATION FROM THE WRITTEN REPORT IN YOUR PACKAGE
  • SO WITH THAT, WE'LL BE HAPPY TO ANSWER ANY FURTHER QUESTIONS THAT YOU MIGHT HAVE
  • THANK YOU
  • YOU'RE ON MUTE
  • MR COMMISSION PRESIDENT
  • APOLOGIES
  • AND LET ME KNOW WHEN YOU WANT ME TO CALL ROLL REQUEST, PLEASE
  • COULD YOU? THE VERY FULL PRESENTATION
  • QUITE SUCCINCT FOR HOW MUCH INFORMATION YOU PROVIDED
  • SO THANK YOU VERY MUCH
  • SO CLERK HART, CAN YOU JUST GO AROUND THE ROOM ONCE WILL BE BEGINNING WITH COMMISSIONER BOWMAN FOR QUESTIONS
  • NO QUESTIONS AT THE MOMENT
  • THANK YOU
  • THANK YOU, COMMISSIONER CALKINS
  • NONE FOR ME EITHER
  • THANK YOU, COMMISSIONER CHO
  • I'M GOOD TOO
  • THANKS, MICHAEL
  • MR STEINBRUECK, LET ME OPEN HER UP THERE
  • YEAH, THIS IS REALLY MORE A CRYSTAL BALL QUESTION THAT I DON'T EXPECT ANYBODY TO HAVE A REAL ANSWER FOR
  • THERE IS A HISTORY OF CYCLICAL NATIONAL RECESSIONS
  • LAST YEAR WAS AN ANOMALY
  • OBVIOUSLY IT WAS AN INDUCED RECESSION PERIOD, IF YOU WILL
  • AND THE ECONOMY SEEMS TO BE CLIMBING OUT OF IT IN MANY AREAS, BUT NOT AT ALL
  • WHAT DO OUR ECONOMIC FORECASTERS SEE IN THE FUTURE? AS FAR AS THE POTENTIAL RETURN TO A RECESSIONARY CYCLE, IT CAN'T ALL BE ROSY FOREVER
  • OKAY, WELL, I CAN PERHAPS TAKE A STAB WITH THAT
  • OBVIOUSLY NO CRYSTAL BALL IS PERFECT
  • AT LEAST FROM WHAT I CAN SEE RIGHT NOW, NO ONE IS PROJECTING AN IMMINENT RECESSION
  • I THINK WE'RE STILL EXPECTED TO REMAIN IN RECOVERY
  • OBVIOUSLY, A LOT HAS
  • TYPICALLY RECESSIONS ARE CAUSED BY EITHER SOME SIGNIFICANT EXTERNAL SHOCKS LIKE OIL PRICES OR IMBALANCES THAT BUILD UP WITHIN THE ECONOMY, HIGH INTEREST RATES AND THE FED'S ACTIONS TO RATHER HIGH INFLATION AND THE FEDERAL RESERVE ACTIONS TO REDUCE INFLATION BY RAISING INTEREST RATES
  • SOMETIMES THEY OVERREACH RAISE INTEREST RATES TOO HIGH, AND THAT CAN TRIGGER RECESSION
  • SO THERE'S MULTIPLE FACTORS
  • SO I THINK IT'S FAIR TO SAY THERE WILL BE A RECESSION IN THE FUTURE
  • THE QUESTION IS WHEN
  • BUT AS FAR AS I CAN SEE, I DON'T BELIEVE ANYONE IS FORECASTING ONE IN THE NEAR TERM, ABSENT SOME SIGNIFICANT SHOCK, THERE'S NO REAL INDICATION OF ANY COMING RECESSION IN THE TREND LINE
  • IS IT THE OPPOSITE? ARE WE STILL LIKE IN THIS ROBUST RECOVERY? I KNOW CERTAINLY DEMAND IS WAY UP FOR CONSUMER GOODS AND OTHER THINGS
  • BUT WHAT ABOUT THE IMPACT OF INFLATION WHICH SEEMS TO BE RISING NOW? WELL, AND CLEARLY THAT'S A CONCERN, AND THE RECENT INFLATION NUMBERS HAVE BEEN EXTREMELY HIGH
  • THERE IS ALSO SOME CONSENSUS WITHIN ECONOMISTS THAT SPIKE IS SOMEWHAT TEMPORARY DRIVEN BY SUPPLY IMBALANCES AS WE'VE GONE INTO THE RECOVERY SHORTAGES, THE MOST RECENT NUMBERS, THE CPI INFLATION, A LARGE CHUNK OF THAT WAS ACTUALLY USED CAR PRICES MADE UP A LARGE PORTION OF THAT RECENT SPIKE IN THE CPI
  • SO I THINK MOST ECONOMISTS EXPECT THAT CPI WILL MODERATE SOMEWHAT
  • IT WON'T STAY QUITE AS HIGH AS IT'S BEEN LATELY, BUT THEY PROBABLY WILL REMAIN SOMEWHAT ELEVATED COMPARED TO THE RECENT PAST
  • OKAY
  • THANK YOU, DAN
  • THANK YOU, COMMISSIONER STEINBRUECK, MOVING TO COMMISSIONER FELLEMAN QUESTION
  • DAN, YOU ARE SO BOLD TO SUGGEST THAT THERE MIGHT BE A RECESSION IN THE FUTURE, A MISTAKE THAT WAS A REAL TOUGH FORECAST THERE
  • SO THANK YOU FOR YOUR INSIGHTS ON THAT
  • I JUST WANT TO JUST REITERATE MY DESIRE FOR US TO LOOK A LITTLE STRATEGICALLY ABOUT HOW THE PORT CAN REALLY LEVERAGE OUR POSITION WITH REGARDS TO OUR OPERATIONS IN THE CONTAINER BUSINESS
  • AND IT JUST SEEMS LIKE WITH T-5 COMING ONLINE AND THE DEMAND BEING HIGHER THAN EVER RIGHT NOW, IT JUST SEEMS LIKE THERE'S A HUGE POTENTIAL TO LEVERAGE OUR REAL ESTATE POSITION WITH THAT OF THE DEMANDS FOR PLACES TO PUT CANS
  • AND SO ANYWAY, THAT'S THE PRIMARY DESIRE US TO SEE IF WE CAN COME UP WITH SOME STRATEGIC PLAN IN THAT REGARD
  • HAVING SAID THAT, I BELIEVE WE HAVE GOTTEN THROUGH THE LARGEST PRESENTATION OF THE DAY AND WE CAN MOVE FORWARD
  • UNLESS IS ANYTHING YOU'D LIKE TO CONCLUDE WITH EXECUTIVE METRUCK? NO, I THINK I APPRECIATE THOSE QUESTIONS
  • AND LOOKING FORWARD, OF COURSE, WE HAVE NO PERFECT CRYSTAL BALL
  • BUT DAN OUTLINED, YOU KNOW, AT LEAST WE SEE THE DEMAND INCREASING, BUT WE DON'T KNOW THERE'S UNCERTAINTY RELATED TO THE IMPACT AND OTHER MEASURES THAT WERE IN PLACE WITH THE COVID
  • AND THEN ARE THOSE GOING COMING BACK WITH THE DELTA VARIANT AND OTHER RESPONSES? SO STILL WE SEE THOSE THE DEMAND IS DEFINITELY THERE
  • THE QUESTION IS, WILL THERE BE OTHER MEASURES THAT IMPACT THOSE GOING FORWARD? ANYWAY, THANKS FOR THOSE QUESTIONS
  • AND THANKS FOR THE PRESENTATION FROM THE STAFF ON THAT
  • THANK YOU
  • ALL RIGHT
  • SO NOW MOVING ON IN THE AGENDA, WE HAVE FOUR NEW BUSINESS ITEMS TODAY
  • CLERK HART, PLEASE READ THE NEXT ITEM INTO THE RECORD AND THEN WE'LL HEAR FROM EXECUTIVE METRUCK TO INTRODUCE THEM
  • THANK YOU, MR COMMISSION PRESIDENT
  • THIS IS AGENDA ITEM 10
  • A INTRODUCTION OF RESOLUTION NUMBER 3-7-9-1 AMENDING RESOLUTION NUMBER 3-7-7-0, WHICH ADOPTED THE CHARTERS OF THE COMMISSION STANDING COMMITTEES BY FURTHER AMENDING THE ENERGY AND SUSTAINABILITY COMMITTEE CHARTER TO CHANGE THE NAME OF THE COMMITTEE TO THE SUSTAINABILITY, ENVIRONMENT AND CLIMATE COMMITTEE COMMISSIONERS
  • RENAMING THE ENERGY AND SUSTAINABILITY COMMITTEE TO THE SUSTAINABILITY, ENVIRONMENT AND CLIMATE COMMITTEE MORE ACCURATELY REFLECTS THE COMMITTEE SCOPE OF WORK AND WHERE OUR PRIORITIES LIES IN ORGANIZATION
  • COMMISSION SPECIALIST ERICA CHUNG WILL BRIEFLY DISCUSS THE RECOMMENDATION OF THE COMMITTEE
  • OKAY
  • THANK YOU
  • EXECUTIVE DIRECTOR METRUCK
  • GOOD AFTERNOON, PRESIDENT FELLEMAN
  • AND COMMISSIONERS
  • MY NAME IS ERICA CHUNG, COMMISSION SPECIALIST FOR THE COMMISSION OFFICE
  • THE RESOLUTION BEFORE YOU IS BROUGHT TO YOU AT THE RECOMMENDATION OF THE ENERGY AND SUSTAINABILITY COMMITTEE, WHICH MET ON JULY 20TH 2021
  • THE COMMITTEE IS RECOMMENDING CHANGED THE NAME TO SUSTAINABILITY, ENVIRONMENT AND CLIMATE COMMITTEE COMMITTEE TO MORE FULLY REFLECT THE BREADTH OF THE WORK UNDER THE PURVIEW OF THE COMMITTEE
  • MEMBERS OF THE COMMITTEE ARE ALSO PRESENT TODAY AND CAN SPEAK FURTHER TO THE RECOMMENDATION
  • THANK YOU
  • AND THAT CONCLUDES MY PRESENTATION
  • THANK YOU
  • I WOULD EITHER COMMISSIONER STEINBRUECK OR BOWMAN OR BOTH LIKE TO SAY SOMETHING? SURE
  • WOULD I HAVE A FEW REMARKS TO SHARE WITH COMMISSIONERS AND MEMBERS OF THE PUBLIC WATCHING ON A FIRST SAY, AS PRESIDENT FELLEMAN MENTIONED IN HIS OPENING REMARKS REFERENCING YESTERDAY'S UNITED NATIONS IN YOUR GOVERNMENTAL PANEL ON CLIMATE CHANGE, WHICH RELEASED A REPORT IN CLIMATE CHANGE, A CODE RED FOR HUMANITY
  • AND IT INDEED IS SO AS A PORT, INCREASING PORT ACTIVITIES WORLDWIDE IN THE TRANSPORTATION SECTOR PRIMARILY COME WITH AN ENVIRONMENTAL BURDEN THAT NEEDS TO BE MITIGATED THROUGH A MORE SUSTAINABLE AND EFFICIENT OPERATIONAL MODEL
  • WE ARE THE CONNECTING NODES OF GLOBAL TRADE AROUND THE WORLD, AND THE WORLD CANNOT MOVE TOWARD GREATER SUSTAINABILITY WITHOUT THE PORTS
  • THE TWO GO HAND IN HAND
  • SO AS WE HEAR AS WE DID TODAY FROM MANY MEMBERS OF THE PUBLIC AND ADVOCATES URGING GREATER EFFORTS BE MADE TOWARDS CLIMATE PROTECTION SPECIFIC TO REDUCING GREENHOUSE GASES, WE ARE REFLECTIVE ABOUT THAT ALL THE TIME, AND WE ARE FOREVER TRYING TO WORK HARDER AND TO DO BETTER
  • BUT IT'S NOT A SIMPLE SOLUTION OF JUST TRYING TO CURTAIL FLIGHTS AT SEATAC OR HALTING SHIPS COMING TO AND FROM PORTS OF ASIA AND OTHER FAR FETCHED COUNTRIES
  • THAT IS SIMPLY NOT A TENABLE ANSWER AT THIS TIME
  • THE PORT ACCOMMODATES THE DEMAND THAT THE PUBLIC PLACES ON TRANSPORTATION SYSTEMS AS THEY BUY MORE AND FLY MORE, AND YOU CAN'T SIMPLY FLICK THE SWITCH AND TURN THAT OFF
  • BUT WE CANNOT DO MUCH MORE AND ACCELERATE OUR EFFORTS
  • AND I KNOW THAT THERE IS GROWING INTEREST ON THE PORT OF POOR COMMISSIONERS TO DO JUST THAT
  • SO WITH THAT SAID, THE BEST RESPONSE IS TO MOVE AHEAD AND MOVE MORE QUICKLY, BUT WITH AN ABSOLUTE COMMITMENT TO MEETING OUR GOALS TO BE THE CLEANEST AND GREENEST PORT IN NORTH AMERICA
  • AND I THINK WE'RE WORKING HARDEST AT DOING JUST THAT
  • MUCH OF THIS WORK HAS BEGUN
  • WE CAME CLOSE TO ACHIEVING OUR GREENHOUSE GAS REDUCTION TARGETS, AND AS WE MOVE AHEAD AND ACHIEVE ONE MILESTONE, WE MAKE ANOTHER TO CONTINUE TO MOTIVATE OURSELVES
  • TO GO FURTHER
  • WE'VE MADE SIGNIFICANT INVESTMENTS IN CLEANER ENERGY, AND THIS IS NOT TOKEN, AND IT IS CERTAINLY NOT GREEN WASHING
  • WE ARE TRANSITIONING OUR INFRASTRUCTURE AND FACILITIES TO BE GREENER AND TO USE CLEAN ENERGIES
  • WE'VE PRESSURED OUR TENANTS AT THE AIRPORT AND SEAPORT TO DO THE SAME AND TO DO MORE
  • WE WILL USE OUR INFLUENCE WORLDWIDE IN THE ORGANIZATIONS INVOLVED IN AREAS OF CLIMATE PROTECTION IN PARTICULAR AND SHIPPING AND AVIATION
  • SO TODAY IT IS WITH MY PLEASURE THAT THE ENERGY AND SUSTAINABILITY COMMITTEE, WHICH HAS FUNCTIONED EXTREMELY WELL IN THE PRECEDING YEARS AND HAS KEPT A STEADY HAND ON A TILLER TOWARD BECOMING MORE SUSTAINABLE AND GREENER
  • WE RECOMMEND ALONG MY COLLEAGUE, PORT COMMISSIONER STEPHANIE BOWMAN, AND I, CO-CHAIR THAT THE COMMITTEE NAME CHANGED TO SUSTAINABILITY, ENVIRONMENT AND CLIMATE COMMITTEE TO BETTER DESCRIBE AS OUR EXECUTIVE DIRECTOR, SAID THE BROAD REACH OF EFFORTS THAT ARE BEING UNDERTAKEN ACROSS ALL DIVISIONS AT THE PORT
  • IT MAY SEEM LIKE JUST A NAME CHANGE, BUT IT IS BACKED BY VERY REAL INITIATIVES, AS I'VE MENTIONED, DIRECTED AT CLIMATE PROTECTION, GREENHOUSE GAS REDUCTION, SUSTAINABILITY AND ENVIRONMENTAL REMEDIATION
  • WE ARE INDEED IN A CODE RED CRISIS GLOBALLY, ACCORDING TO THE IPCC
  • SO ADDING CLIMATE GIVES ADDITIONAL EMPHASIS FOR WHAT WE ARE ALREADY COMMITTED TO DOING AND TO DO MORE AND TO BRING A GREATER SENSE OF URGENCY TO THOSE EFFORTS
  • WE CAN DO IT
  • WE'LL CONTINUE TO MOVE THE NEEDLE
  • I'M COMMITTED TO ADVANCING MEANINGFUL CHANGE, AS I KNOW MY COLLEAGUES ON THE COMMISSION AND STAFF ARE THE PORT OF SEATTLE, AND OUR STAFF ARE LEADING THE WAY IN MANY AREAS AND THERE IS MUCH MORE TO DO
  • SO WITH THAT, ENOUGH SAID, I'LL HEAD IT OFF TO COMMISSIONER BOWMAN
  • THANK YOU
  • I WILL BE VERY BRIEF
  • WE NEED TO DO MORE AND WE NEED TO DO IT SOONER IS COMMISSIONER STEINBRUECK SAID, THIS IS A COMMITTEE NAME CHANGE
  • I DON'T THINK WE NEED TO DISCUSS THAT TOO MUCH MORE, BUT I DO THINK WE NEED TO SEND THE MESSAGE I SENT HELP SEND THE MESSAGE THAT THIS COMMISSION IS ABSOLUTELY COMMITTED TO CARBON REDUCTION, CARBON SEQUESTRATION AND ENERGY EFFICIENCY THROUGHOUT EVERY SINGLE PORT OF SEATTLE OPERATION
  • AND I BELIEVE THAT OUR STAFF IS WITH US AND PERHAPS WE NEED TO BE PROVIDING MORE GUIDANCE WITH THAT, AND THIS COMMISSION INTENDS TO DO SO
  • SO I HOPE THAT OUR COLLEAGUES CAN SUPPORT THE SMALL CHANGE AND LET'S GET ON BOARD
  • THANK YOU
  • THANK YOU
  • COMMISSIONER STEINBRUECK AND BOWMAN, MR COMMISSION PRESIDENT, WOULD YOU LIKE ME TO CALL FOR OTHER QUESTIONS, PLEASE
  • THANK YOU
  • WE'LL GO TO COMMISSIONER CALKINS
  • NO, I'M SUPPORTIVE OF THE NAME CHANGE
  • I THINK IT'S A GOOD IDEA
  • I THINK WE NEED TO MAKE SURE THAT THE ACRONYM IS PRONOUNCED ORALLY TO THE WAY WE USE THAT ACCIDENT IN OTHER PLACES IN THE PORT
  • SO I WOULD ENCOURAGE US TO SAY SEAC BECAUSE THE AIRPORT IS SEA, BUT THAT'S A MINOR THING
  • THANKS FOR YOUR EFFORT ON THE COMMISSIONERS BOWMAN AND STEINBRUECK
  • THANK YOU
  • COMMISSIONER CALKINS MOVING TO COMMISSIONER CHO
  • YEAH
  • JUST A QUICK QUESTION FOR MY COLLEAGUES, I GUESS, WAS THE WAS THE POINT TO NARROW THE FOCUS OF THE COMMITTEE OR SPECIFY OR TO BROADEN IT? BECAUSE, IN MY VIEW, SUSTAINABILITY, ENVIRONMENT AND CLIMATE ARE KIND OF REDUNDANT
  • SO I'D LIKE SOME CLARITY IN TERMS OF AND WE'VE TAKEN OUT ENERGY
  • THE SUSTAINABILITY GOES WELL BEYOND CLIMATE PROTECTION
  • IT'S HOW WE LIVE, IT'S HOW WE USE MATERIALS, IT'S AVOIDING WASTE AND MANY OTHER THINGS
  • AND ENVIRONMENTAL REMEDIATION CERTAINLY SUPPORTS CLIMATE PROTECTION, TREE PLANNING, HABITAT RESTORATION, WATER QUALITY, ADDRESSING OCEAN ACIDIFICATION
  • I DON'T SEE IT AS REDUNDANT AT ALL
  • AND I SEE IT AS BEING MORE INCLUSIVE AND LESS NARROWLY DEFINED BY SIMPLY SUSTAINABILITY AND ENERGY
  • ENERGY
  • WHAT'S THAT? IT COULD BE ANY KIND OF ENERGY
  • MAYBE WE'RE LOOKING TO PRODUCE MORE FOSSIL FUELS, SOMEBODY MIGHT THINK, AND EXPANDING OUR ENERGY PORTFOLIO
  • SO FOR ME, IT NEEDED BETTER DEFINITION AND SPECIFICITY
  • BUT ALSO IT IS INDEED A RECOGNITION OF HOW BROADLY THE PORT EFFORTS ARE BEING DIRECTED IN ALL THESE AREAS
  • I HAVE TO SAY I HAD NO IDEA WHEN I FIRST CAME TO THE PORT, ALL THE EFFORTS THAT WERE UNDERWAY
  • AND I HAVE YET TO FIND ANOTHER PORT, EITHER IN NORTH AMERICA OR WORLDWIDE THAT IS WORKING HARDER THAN THE PORT OF SEATTLE WHEN IT COMES TO THESE CRITICALLY IMPORTANT ENVIRONMENTAL AND CLIMATE PROTECTION ISSUES
  • GREAT
  • THANKS FOR THE EXPLANATION
  • I'M VERY SUPPORTIVE OF THIS
  • THANK YOU
  • COMMISSIONER CHO
  • COMMISSIONER FELLEMAN, BACK TO YOU
  • THANK YOU
  • JUST AS A QUICK BIT OF HISTORY, I ARRIVED AT THE PORT GETTING ELECTED IN 2016 STARTED 2017 ON THE HEELS OF THE SHELL RIG
  • I WAS IMMEDIATELY PRESENTED WITH THE QUESTION BY STAFF
  • SO HOW MUCH OIL IS ACCEPTABLE? AND I SAID, WELL, THAT'S AN IMPOSSIBLE QUESTION
  • THAT'S EITHER TOO MUCH OR TOO LITTLE TO ANYBODY
  • AND I SAID, WHAT NEEDS TO HAPPEN
  • WHAT NEEDS TO HAPPEN IS THAT THE PORT NEEDS TO TAKE RESPONSIBILITY FOR ITS OWN EMISSIONS AND TEND TO ACCOUNT FOR THAT
  • AND SO REALLY, THE ISSUE THAT WAS THE FOCUS WAS HOW WE PRODUCE ENERGY OR USED ENERGY
  • AND SO WHILE CLIMATE AND ENERGY ARE DIRECTLY RELATED, THE POINT WASN'T POINTS TO BE ACCOUNTING FOR
  • AND OBVIOUSLY, THE MORE TRANSPARENT YOU ARE ABOUT IT, THE MORE SUBJECT YOU ARE ABLE TO MAKE DECISIONS THAT ARE SUSTAINABLE
  • AND SO THAT WAS THE POINT
  • I THINK THE POINT RIGHT NOW IS HOW IT IMPACTS THE CLIMATE AND THAT WE HAVE TO ALSO BUILD RESILIENCY TO RESPOND TO THE CLIMATE
  • SO I'M VERY MUCH IN SUPPORT OF THE BROADENING OF THAT MESSAGE
  • I JUST THINK IT WAS IMPORTANT TO UNDERSTAND WHY IT CAME ABOUT, BUT I DO HAVE BECAUSE IT STARTED IN 2017
  • I DO WANT TO HAVE A SMALL AMENDMENT TO THE MOTION, WHEREAS THE FIRST LINE WOULD BE, WHEREAS ON JANUARY SOMETHING I FORGOT THE EXACT DATE
  • 2017, THE PORT OF SEATTLE COMMISSION ESTABLISHED THE ENERGY AND SUSTAINABILITY COMMISSION COMMITTEE
  • I MEAN, AND THEN WE JUMPED TO 2021 AND THEN GO ON FROM THERE
  • SO THAT WOULD BE MY FRIENDLY AMENDMENT
  • AND I WOULD MR COMMISSION PRESIDENT, LET'S GO AHEAD AND WELL, THANK YOU FOR THAT
  • FIRST AND FOREMOST, LET'S GO AHEAD AND WAIT TO GET THE AMENDMENT ON THE FLOOR UNTIL WE HAVE THE MAIN MOTION ON THE FLOOR
  • AND WE HAVE A MUCH CERTAINLY
  • AND WE HAVE A LITTLE BIT OF WORK TO DO BEFORE WE EVEN GET TO THAT
  • RIGHT
  • SO THIS IS GOING TO BE WE'RE GOING TO WAIVE OUR NORMAL POLICIES HERE BY HAVING TO WAITING THE SECOND READING SO THAT THE MOTION NEEDS TO BE THE EXACT LANGUAGE HERE
  • I WILL TRY TO GET STRAIGHT
  • LET'S FIRST MAKE SURE THAT THE MOTION IS MOVED
  • AND SECONDED, LET'S GO AHEAD AND GO TO THE TOP OF 22 AND SUSPEND THE RULES BEFORE WE GO THERE TO SUSPEND THE RULES
  • IS THAT THE FIRST MOTION? I'M SORRY
  • THE PROBLEM IS THAT I WENT FROM 21 TO 23
  • THAT'S MY PROBLEM
  • SO, COMMISSIONER, RESOLUTIONS ARE REQUIRED TWO READINGS PER OUR BYLAWS UNLESS THE COMMISSION SUSPENDS THE RULE AND CONSOLIDATES THE READING INTO ONE UNANIMOUS CONSENT
  • IS THERE A MOTION AND A SECOND TO SUSPEND THE RULES TO ALLOW TODAY FOR ONE READING PROVIDING FOR FINAL ACTION ON THE RESOLUTION TODAY
  • SO MOVED SECOND
  • OKAY
  • THE MOTION HAS BEEN MOVED AND SECONDED TO SUSPEND THE COMMISSION RULES REGARDING THE TWO READING REQUIREMENT, PROVIDING FOR THE POSSIBILITY THAT THE FINAL ACTION BE TAKEN ON THE RESOLUTION TODAY
  • CLERK HART, PLEASE TO CALL THE ROLL ON THE VOTE
  • COMMISSIONERS, PLEASE SAY YES OR NO WHEN YOUR NAME IS CALLED
  • THANK YOU, MR COMMISSIONER
  • PRESIDENT, THIS IS ON THE MOTION TO SUSPEND THE RULES BEGINNING WITH COMMISSIONER BOWMAN
  • AYE THANK YOU, COMMISSIONER CALKIN
  • AYE
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONERS
  • STEINBREUCK
  • YES
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS FOR THIS MOTION
  • SO THE MOTION PASSES
  • I WOULD LIKE TO THEN INTRODUCE I THINK AT THIS POINT WE INTRODUCE THE WE DO NEED A MAIN MOTION ON THE FLOOR AND I WILL MOVE THE MOTION STANDING ON THE SHOULDERS OF COMMISSIONER FELLEMAN AND OUR PREDECESSOR COLLEAGUES WHO HAD THE DEEP UNDERSTANDING AND NEED FOR ESTABLISHING A GREATER PRIORITY EFFORTS AROUND CLIMATE PROTECTION AND ENERGY AND SUSTAINABILITY AND THE ENVIRONMENT
  • I MOVE THE MOTION
  • SECOND
  • ALRIGHT
  • SO IS THERE ANY FURTHER DISCUSSION ON THE MOTION? I DO NOT SEE ANY HANDS RAISED
  • MR COMMISSION PRESIDENT
  • OKAY
  • AND YOU HAVE AN AMENDMENT THAT YOU WOULD LIKE TO OFFER? SURE
  • NOW WOULD BE THE TIME
  • THANK YOU
  • SO UNFORTUNATELY, I DON'T HAVE THE EXACT DATE OF THE MOTION
  • IT'S OPTION BY THE COMMISSION
  • BUT I WOULD JUST LIKE TO ADD THE FIRST SENTENCE TO THE RESOLUTION NUMBER 3791 TO SAY, WHEREAS ON JANUARY 2017 OF SOME DATE IN PARTICULAR, THE PORT OF SEATTLE COMMISSION ESTABLISHED THE ENERGY AND SUSTAINABILITY COMMITTEE
  • I UNDERSTAND, MR COMMISSION PRESIDENT, THAT YOU WOULD LIKE AWARE, AS COST ADDED FOR ESTABLISHMENT OF THE ORIGINAL COMMITTEE
  • THANK YOU, SIR
  • THAT IS THE AMENDMENT BEFORE US
  • DO I HAVE A THAT WAS THE SECOND THAT IT HAS BEEN MOVED IN SECOND AND FOR THE AMENDMENT
  • ALRIGHT, SO LET US HAVE A VOTE ON THE AMENDMENT, PLEASE
  • WE'LL CALL THE ROLL FOR THAT BEGINNING WITH COMMISSIONER BOWMAN ON THE MOTION TO AMEND
  • AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE
  • THANK YOU, COMMISSIONER CHO, AYE
  • THANK YOU, COMMISSIONER
  • STEINBREUCK
  • YES
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE
  • ALRIGHT
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS ON THE MOTION TO AMEND
  • THIS IS A PRIMARY AMENDMENT
  • OKAY, SO THE MOTION PASSES AND NOW WE NEED TO HAVE A MOTION ON THE MAIN MOTION AS AMENDED
  • THIS IS THE VOTE FOR THE MAIN MOTION AS AMENDED, SEEING NO FURTHER DISCUSSION, COULD YOU PLEASE CALL THE ROLL? THANK YOU
  • BEGINNING WITH COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER STEINBREUCK
  • YES
  • THANK YOU, COMMISSIONER
  • FELLEMAN
  • AYE, THANK YOU
  • THAT MOTION PASSES FIVE YESSES ZERO NOS
  • THANK YOU VERY MUCH
  • WELL, WE DID RESERVE FULL 15 MINUTES FOR THAT DISCUSSION LONGER THAN WE EXPECTED
  • THANK YOU VERY MUCH FOR THAT, COMMISSIONERS
  • WE'RE MOVING ON TO ITEM 10 B
  • AND BEFORE WE DO, MR COMMISSION PRESIDENT, JUST TO NOTE THAT THE MAIN MOTION AS AMENDED IS ADOPTED
  • THANK YOU
  • I THOUGHT THAT'S WHAT I SAID, BUT GOOD
  • I KEEP ON FORGETTING TO DO THAT
  • MY APOLOGIES
  • ITEM CAN BE, PLEASE
  • THANK YOU
  • WE'LL GO AHEAD AND READ THAT INTO THE RECORD
  • ITEM 10 B IS AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO SIGN AN INTERLOCAL AGREEMENT WITH UNIVERSITY OF WASHINGTON? S GRANT PROGRAM FOR THE PORT TO HOST 1 12 MONTH HERSHMAN FELLOWSHIP POSITION
  • COMMISSIONERS WITH THIS AUTHORIZATION WILL BRING ON A SEA GRANT FELLOW TO PROVIDE CAPACITY FOR HABITAT RELATED WORK THAT WE WOULD OTHERWISE LACK STAFF TO ACCOMPLISH
  • SOME OF THIS WORK INCLUDES PARTICIPATING IN THE DESIGN, CONSTRUCTION AND MONITORING OF THE MITIGATION BANK PROJECTS IN SUPPORTING THE INNOVATION IN THE PORT HABITAT MITIGATION BANKING PROGRAM
  • THE SEA GRANT FELLOW WILL ALSO HAVE OPPORTUNITIES TO SUPPORT OTHER PROJECTS THAT WE ARE ENGAGED IN, INCLUDING HELP THROUGH THE PARTNERSHIP WITH THE PUGET SOUND RESTORATION FUND, THE DEPARTMENT OF NATURAL RESOURCES, ECOLOGY, UNIVERSITY OF WASHINGTON AND OTHERS
  • JOHN SLOAN, SENIOR MANAGER, ENVIRONMENTAL PROGRAMS, WILL PRESENT JOHN HI
  • THANK YOU
  • AND GOOD AFTERNOON
  • EXECUTIVE DIRECTOR, METRUCK AND COMMISSIONERS
  • WE COULD BRING UP THE PRESENTATION AND WE HAVE A COUPLE OF SLIDES
  • SO THIS REQUEST THAT YOU HEARD IS TO PROVIDE AUTHORITY TO EXECUTE AN INTERLOCAL AGREEMENT WITH UW THAT ALLOWS US TO ENGAGE WASHINGTON A GRANT FELLOW AGAIN THIS YEAR TO HELP SUPPORT OUR HABITAT AND STEWARDSHIP PROGRAM
  • SUPPORT A LITTLE ABOUT WASHINGTON SEA GRANT
  • IT WAS ESTABLISHED TO HELP UNDERSTAND AND ADDRESS CHALLENGES FACING WASHINGTON'S OCEANS AND COAST
  • SEA GRANT FUNDS, RESEARCH, FOSTERS EDUCATION, AND SUPPORT SEVERAL GRADUATE FELLOWSHIP PROGRAMS PERSON TO GRADUATE OR RECENTLY FINISHED GRADUATE STUDENTS WHO ARE ENGAGED IN OCEAN AND COASTAL POLICY ISSUES
  • NEXT SLIDE SO THE COST OF THIS FELLOWSHIP IS AROUND 40,000 DOLLARS, WHICH IS INCLUDED IN OUR 2021 EXPENSE BUDGET REQUEST
  • SO THERE'S NO ADDITIONAL FUNDING REQUESTED AT THIS TIME
  • THE FELLOW, IT'S IMPORTANT TO NOTE, WILL BE AN EMPLOYEE OF THE UNIVERSITY OF WASHINGTON THAT THEY ARE EMBEDDED IN OUR MARITIME ENVIRONMENT SUSTAINABILITY DEPARTMENT FOR A PERIOD OF 12 MONTHS
  • IT START IN SEPTEMBER AND FINISH THE FOLLOWING SEPTEMBER 2022
  • PRIMARILY, THE WORK THEY'LL UNDERTAKE WILL BENEFIT SEVERAL EXISTING PROJECTS AND INITIATIVES WITHIN OUR DEPARTMENT
  • NEXT SLIDE SO THE PRIMARY FOCUS THAT WE WOULD TASK THEM WITH WILL BE TO SUPPORT OUR HABITAT MITIGATION BANK, THE COMPLETION OF THE DUWAMISH RIVER PEOPLE PARK IN SPRING OF 2022, ALSO KNOWN AS TERMINAL ONE AND 17
  • WE'LL BE GETTING OUR FIRST ALLOTMENT OF MITIGATION CREDITS
  • THE HERSHMAN FELLOW WILL BE BROUGHT ON BOARD TO HELP THE HABITAT TEAM AND COMMERCIAL MARKETING STAFF TO DEVELOP A BUSINESS PLAN THAT WILL IDENTIFY STRATEGIES FOR IDENTIFYING WHO OUR CUSTOMERS ARE AND MARKETING THE CREDITS TO THEM
  • IN ADDITION, THE FELLOW WILL PROVIDE SUPPORT FOR OTHER IMPORTANT INITIATIVES, INCLUDING THE FLOATING WETLAND ISLANDS PROJECT THAT WE'VE HAD UNDERWAY WITH THE UNIVERSITY OF WASHINGTON FOR A COUPLE OF YEARS NOW, AS WELL AS OUR ALTERNATIVE BANK LINE STABILIZATION PROGRAM THAT'S GETTING UNDERWAY, HELPING SEA GRASS RESTORATION PROJECTS AND RESEARCH THAT WE'RE DOING AS WELL AS OUR OCEAN ACIDIFICATION ACTION PLAN RECOMMENDATIONS
  • AND WITH THAT, I'M HAPPY TO ANSWER ANY QUESTIONS ABOUT THE POSITION
  • THANK YOU, JOHN
  • I ASKED YOU TO DO THIS BECAUSE I THINK THIS IS JUST ONE OF THOSE THINGS THAT THE PORT DOES THAT MANY PEOPLE DON'T KNOW OF
  • AND WE ARE GREATLY APPRECIATIVE OF THE WORK THAT YOU DO AND WANT TO MAKE SURE THAT OUR COMMISSIONERS KNOW THE GREAT STUFF THAT WE SUPPORT THAT SOMETIMES GOES UNNOTICED
  • SO IF THERE'S A CLERK HART, IF YOU GO AROUND THE ROOM TO SEE IF THERE'S ANY FURTHER QUESTIONS, CERTAINLY BEGINNING WITH COMMISSIONER BY ONE, NO QUESTION
  • SOUNDS LIKE A GREAT PROGRAM
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • COMMISSIONER CALKINS, NONE FOR ME EITHER
  • THANK YOU, COMMISSIONER CHO
  • SOUNDS GREAT
  • THANKS
  • NO QUESTIONS
  • THANK YOU
  • COMMISSIONER STEINBRUECK, FULLY SUPPORTIVE
  • THANK YOU
  • THANK YOU
  • COMMISSIONER FELLEMAN, I HAVE ONE QUESTION FOR YOU
  • MY UNDERSTANDING IS THAT I LOVE THE FACT THAT WE CAN TURN A HABITAT RESTORATION INTO AN ECONOMIC BENEFIT THROUGH BANKING
  • THERE'S SOMETHING PERFECTLY VERY PORT LIKE ABOUT THAT
  • IT'S A DOUBLE WIN
  • BUT MY UNDERSTANDING IS THAT WE DON'T GET A LOT OF CREDIT FOR THIS MARINE HABITAT RESTORATION
  • AND I WAS THINKING ABOUT BRINGING THIS AS A FEDERAL LEGISLATIVE PRIORITY FOR OUR 2022 SESSION, AND I WAS WONDERING IF YOU HAD ANY INSIGHT ON THAT TO SHARE WITH US? YEAH
  • THE MODEL THEY USE TO ESTABLISH CREDITS, IT'S REALLY FOCUSED ON THE ESTUARY
  • SO IT WORKS REALLY WELL IN THE DUWAMISH UPSTREAM OF HARBOR ISLAND
  • IT DOESN'T WORK QUITE AS WELL FOR SHALLOW SUBTIDAL AND DEEP SUBTIDAL ENVIRONMENTS
  • I KNOW
  • NOAA'S HAD SOME FOCUS ON THAT
  • AND THEY'RE WORKING TO IMPROVE THAT MODEL
  • AND WHEN WE GET TO BUILDING OUR T 25 PROJECT, WE'D LIKE TO SEE THE KELP THAT WE INTEND TO INSTALL
  • THEY'RE CREDITED A LITTLE MORE HIGHLY
  • THERE'S WORK TO THAT END RIGHT NOW, BUT ADDITIONAL SUPPORT FROM THE PORT TO PUSH THEM ALONG WOULD BE VERY WELCOME
  • THANK YOU VERY MUCH
  • SO, COMMISSIONERS BEFORE FOREWARNED, I WILL BRINGING THIS UP IN OUR LEGISLATIVE AGENDA DEVELOPMENT FOR NEXT YEAR
  • THANKS SO MUCH FOR THAT QUICK SUMMARY, JOHN
  • AND GOOD LUCK TO YOU AND CARRYING ON THIS GREAT WORK
  • CLERK HART, CAN YOU MOVE ON TO ITEM 10 C
  • WE NEED A MOTION AND A SECOND ON THE FLOOR
  • WHAT'S THAT? WE ARE ACTUALLY PRORATING MONEY FOR THIS
  • THANK YOU
  • DO WE HAVE A MOTION? SO MOVED SECOND, SECOND
  • THANK YOU SO MUCH
  • WE HAVE A MOTION AND A SECOND CLERK HART
  • PLEASE CALL THE ROLL
  • THANK YOU FOR THE VOTE, BEGINNING WITH COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER CALKINS, BEFORE I VOTE, CAN I JUST ASK, IS THIS BECAUSE IT'S AN ILA OR BECAUSE THE QUANTITY IS NOT HIGH ENOUGH TO TRIGGER THE DELEGATION? BUT IS THAT THE REASONING AND THE VOTE, THE REASON BEHIND THE VOTE IS SO THAT YOU BECOME AWARE OF WHAT IS HAPPENING
  • IT IS COMPLETELY WITHIN THE JURISDICTION
  • IT WAS ORIGINAL ON CONSENT
  • YES
  • AND THEN I'LL JUST ADD THAT IT IS BECAUSE IT IS AN ILA
  • THAT IS THE REASON IT HAS TO CENSOR THE COMMISSION
  • YES
  • GOT IT
  • THANK YOU
  • CLICK I'M AN AYE
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER STEINBRUECK, AYE
  • YES
  • THANK YOU, COMMISSIONER FELLEMAN
  • AYE,I BUT I WAS THE ONE THAT PULLED IT OUT OF CONSENT
  • CORRECT
  • THAT IS CORRECT, MR COMMISSION PRESIDENT
  • AND THE QUESTION WAS IF IT HAS TO BE ON THE AGENDA FOR COMMISSION APPROVAL IN GENERAL BECAUSE IT'S AN ILA, THE ANSWER IS YES
  • I SEE IT WHETHER IT WAS ON CONSENT OR NOT
  • CORRECT
  • AND THE PORT, THE DELEGATION OF AUTHORITY
  • THANK YOU FOR THAT
  • CLARIFICATION
  • SO WE HAVE UNANIMOUS SUPPORT
  • SO THE MOTION PASSES
  • THANK YOU
  • THANK YOU
  • WELL, THAT WAS FUN
  • LET'S SAY MOVING ON TO 10-C, PLEASE
  • MOVING ON TO 10-C
  • I'LL GO AHEAD AND READ THAT INTO THE RECORD
  • THIS IS THE SOUND INSTALLATION PROGRAM BRIEFING
  • COMMISSIONERS TODAY STAFF ARE HERE TO BRIEF YOU ON SOME EXCITING NEWS ABOUT THE PROGRESS AND FUTURE PLANS FOR OUR AIRPORT SOUND INSULATION PROGRAM
  • AT YOUR DIRECTION, THE AIRPORT STAFF HAS WORKED VERY HARD TO EXPAND ITS CAPABILITY TO ACCELERATE SOUND INSULATION OF SINGLE FAMILY HOMES, APARTMENTS OF CONDOMINIUMS STEVE ST LOUIS, WHO YOU MAY KNOW, LED THE SIGNIFICANT TASK OF MANAGING THE INTERNATIONAL RIVALS FACILITY PROJECT FOR THE PROJECT MANAGEMENT GROUP HAS BEEN HIRED AS THE SOUND INSULATION PROGRAM MANAGER
  • JULIE KINSEY, AN EXTERNAL HIRE WITH BACKGROUNDED, RESIDENTIAL CONSTRUCTION AND PROJECT MANAGEMENT, IS THE NOISE PROGRAM MANAGER FOR SOUND INSULATION
  • SHE WILL BE HEADING UP THE PROJECT COORDINATION AND OWNER OUTREACH AND ENGAGEMENT
  • BOTH ARE HERE TO FIRST BRIEF YOU ON THE PROGRESS AND FUTURE PLANS OF THE PROGRAM
  • AS A MAJOR FIRST STEP, THEY'LL BE SEEKING YOUR APPROVAL FOR FUNDING TO BEGIN NOISE TESTING, PLANNING AND DESIGNING FOR THE APARTMENT SOUND INSTALLATION PROJECTS
  • WITH THAT, I BELIEVE I'M HANDING IT OVER TO STEVEN
  • THANK YOU, THE EXECUTIVE DIRECTOR METRUCK AND GOOD AFTERNOON, COMMISSIONERS
  • I'M STEVEN ST LOUIS, SOUND INSTALLATION PROGRAM MANAGER FOR THE AVIATION PROJECT MANAGEMENT GROUP
  • OUR BRIEFING TODAY WILL PROVIDE AN OVERVIEW OF ACCELERATION ACCOMPLISHMENTS, STATUS UPDATE FOR ALL THE SEPARATE CAPITAL IMPROVEMENT PROGRAMS, PROGRAM FUNDING PLAN OVERVIEW, PROGRAM RISKS AND CHALLENGES, AND OUR NEXT STEPS
  • NEXT SLIDE
  • NEXT SLIDE
  • THANK YOU
  • THIS BRIEFING WILL DISCUSS MANY OF THE ACTIONS TAKEN TO ITS A COMMISSION MOTION
  • A TREMENDOUS AMOUNT OF WORK HAS BEEN TO ACCOMPLISH THIS YEAR
  • IN CONJUNCTION WITH FINANCE AND BUDGET
  • WE FINALIZE THE PLAN OF FINANCE, WHICH YOU'LL HEAR ABOUT LATER IN THE PRESENTATION
  • WE'VE EXECUTED THE CONSULTANT PROGRAM MANAGEMENT CONTRACT
  • THIS IS A CONSULTANT TEAM COMPRISED OF TECHNICAL EXPERTS EXPERIENCED IN DELIVERING SOUND INSTALLATION PROGRAMS ACROSS THE COUNTRY
  • WE'VE ADDED ADDITIONAL MANAGERS TO SUPPORT ACCELERATION PROGRAM, SUCH AS MYSELF AND MY COLLEAGUE JULIE KINSEY, WHO ARE BOTH PRESENTING TODAY
  • JUST LAST WEEK, WE RECEIVED A POSITIVE MAJORITY AND INTEREST VOTE FROM THE AIRLINES SUPPORTING THE APARTMENT PROGRAM
  • OUR TEAM IS NOW WELL POSITIONED TO CONTINUE AT AN ACCELERATED PACE, SETTING THE PROGRAM UP FOR SUCCESS
  • NEXT SLIDE, PLEASE
  • THIS TEAM WORKS OR HIGHLIGHTS HOW THE TEAM HAS GROWN EXPONENTIALLY SINCE THE ACCELERATION MOTION
  • WE BROUGHT OUR NEW MANAGERS AND CONTINUE TO EXPAND THE TEAM WITH INTERNAL RESOURCES
  • PRIOR TO ACCELERATION
  • THE SOUND INSTALLATION PROGRAM TEAM CONSISTED OF ONLY FOUR FULL TIME STAFF MEMBERS WORKING ON THE PROGRAM
  • THE PORT TEAM NOW CONSISTS OF MORE THAN 25 KEY TEAM MEMBERS FROM OVER FIVE DIFFERENT PORT GROUPS SUPPORTING THE PROGRAM
  • THERE ARE ALSO MANY OTHER PORT GROUPS THAT PROVIDE SUPPORT TO THE SOUND INSTALLATION PROGRAM ON A LIMITED BASIS, AND OUR TEAM HAS THEIR FULL SUPPORT AND CALLED UPON
  • JUST LAST MONTH, THE PORT EXECUTED THE CONSULTANT PROGRAM MANAGEMENT CONTRACT
  • THIS TEAM CONSISTS OF MORE THAN 150 TEAM MEMBERS WITH EXPERTISE IN SUPPORTING SOUND INSTALLATION PROGRAMS ACROSS THE COUNTRY
  • I ANTICIPATE OVER THE COURSE OF THE PROGRAM THAT WELL OVER 200 TEAM MEMBERS, NOT INCLUDING CONTRACTORS, WILL BE INVOLVED IN THE SOUND INSTALLATION PROGRAM
  • NEXT SLIDE, PLEASE
  • THE SOUND INSTALLATION BOUNDARY MAP HIGHLIGHTS THE 18 APARTMENT COMPLEXES CONSISTING OF 903 UNITS, TWO CONDOMINIUM COMPLEXES CONSISTING OF 88 UNITS, SEVEN PLACES OF WORSHIP IN 140 SINGLE FAMILY HOMES THAT ARE ALL POTENTIALLY ELIGIBLE TO PARTICIPATE IN THE SOUND INSTALLATION PROGRAM
  • WE WILL SPEAK TO THE PLANNED STATUS OF EACH OF THESE PROGRAMS AND NOW I'LL INTRODUCE THEM
  • TURN OVER TO MY COLLEAGUE JULIE KENSEY, WHO IS A NEWPORT HIRE
  • THE NOISE PROGRAM MANAGER SAYS SOUND INSULATION WITH AVIATION ENVIRONMENTAL JULIE
  • THANK YOU, STEVE
  • NEXT SLIDE, PLEASE
  • SO GOOD AFTERNOON
  • EXECUTIVE DIRECTOR METRUCK IMPORT COMMISSIONERS
  • I'LL BE SHARING WITH YOU OUR PROGRAM STATUS UPDATE TODAY
  • NEXT SLIDE, PLEASE
  • SO THE PORT HAS A STRONG HISTORY OF SUPPORT FOR SOUND INSULATION PROJECT SINCE ITS INCEPTION IN 1985
  • TO DATE, THE PORT HAS INVESTED APPROXIMATELY 300,000,000 DOLLARS IN SOUND INSULATION OF OVER 9 400 HOMES
  • THE PORT SPENT APPROXIMATELY 100,000,000 DOLLARS IN ACQUISITION AND RELOCATION OF OVER 1 400 HOMES AND FIVE MOBILE HOME PARKS THAT WERE MOST IMPACTED BY YOUR OPERATIONS
  • WE HAVE PARTNERED WITH EDUCATION PROVIDING 14,000,000 DOLLARS TO HIGHLINE COLLEGE TO SOUND INSULATE 14 BILLIONS
  • AND THE HIGHLINE SCHOOL DISTRICT IS PART OF A 15 SCHOOL, 100,000,000,000 DOLLAR JOINT INVESTMENT WITH THE FAA
  • TO DATE, WE HAVE COMPLETED NINE OF 15 SCHOOLS
  • AND NEXT, WE'D LIKE TO SHARE WITH YOU THE DETAILS OF THIS SOON TO BE COMPLETED TEST SCHOOL HIGHLINE HIGH SCHOOL NEXT SLIDE, PLEASE
  • FIRST, WE'D LIKE TO THANK COMMISSIONER BOWMAN FOR BEING AVAILABLE TO TOUR THIS EXCITING NEW SCHOOL, AND IT'S FAIR TO SAY THAT WE WERE ALL VERY IMPRESSED WITH THE FACILITY
  • THIS PROJECT WAS FUNDED THROUGH A HIGHLINE SCHOOL DISTRICT LEVY AS WELL AS PORT AND FAA SUPPORT
  • SOME OF THE KEY FEATURES OFFERS A PRODUCTION KITCHEN THAT WILL ACTUALLY SUPPORT FIVE OTHER SCHOOLS, HAS TWO THEATER SPACES, MULTIPLE INDUSTRIAL DESIGN SHOPS, STATEOFTHEART CHEMISTRY LAB AND A COLLABORATIVE WORKSPACE DESIGN
  • WITH THE PORT INVESTMENT, THE HIGHLINE SCHOOL DISTRICT WAS ABLE TO UTILIZE THE KAWNEER DESIGNED FOR EDUCATION SERIES
  • WINDOWS, A PRODUCTS SOUND TRANSMISSION CLASS, OR STC RATING INDICATES ITS ABILITY TO REDUCE SOUND INTO STRUCTURE
  • THE HIGHER THE NUMBER, THE GREATER THE SOUND ABSORPTION
  • AT AN STC OF 44, THERE IS LIMITED EXTERIOR NOISE TRANSFER EVEN AS AIRCRAFT LAND AND TAKE OFF
  • THE VENTILATION SYSTEM IS DESIGNED TO BE A CLOSED SYSTEM WITH EXTERNAL AIR
  • THE HIGHLINE SCHOOL DISTRICT YOU UTILIZES THE MERV 13 FILTERS NOW ON
  • MOST FILTERS WILL CAPTURE THE LARGER PART OF SUCH AS DUST OR POLLEN
  • A MERV 13 ACTUALLY WILL CAPTURE 85% OF THE FINE ONE TO 3 MICRON SIZED PARTICLES VERSUS A MERV 8, WHICH ONLY CAPTURES 20%
  • THIS WILL DRAMATICALLY IMPROVE THE INDOOR AIR QUALITY AT THE SCHOOL
  • NEXT SLIDE, PLEASE
  • AS PART OF OUR PROGRAM DESIGN, WE'VE WORKED EXTENSIVELY WITH THE OFFICE OF EQUITY, DIVERSITY AND INCLUSION, AND THEY WERE ABLE TO HELP HIGHLIGHT SOME OPPORTUNITIES FOR US
  • THE FIRST IS THE SOUND INSULATION PROGRAM WEBSITE
  • THERE'S VERY LIMITED TEXT AND IMAGERY TO INFORM ON THE NATURE OF OUR PROGRAM, AND THIS IMPACTS OUR ABILITY TO FULLY LEVERAGE THE WEBSITE AS AN INFORMATION HUB AND TO MAXIMIZE THE PORT GOOGLE TRANSLATE FUNCTIONALITY, WHICH WILL ACTUALLY CONVERT TEXT INTO AN AVAILABLE 109 LANGUAGES
  • SO WE HAVE PARTNERED WITH EXTERNAL RELATIONS AND WE ARE ACTIVELY ENGAGED IN MAKING THESE ENHANCEMENTS
  • WE'VE ALSO MODIFIED OUR OUTREACH EFFORTS THROUGH MORE FREQUENT COMMUNICATIONS AS WELL AS A VARIETY OF MESSENGERS, AND WE WILL BE USING A NUMBER OF DIFFERENT MODES FROM EDITORS AND POSTCARDS
  • WE WILL CONTINUE TO PARTNER WITH KING COUNTY PROGRAMS, THE OFFICE OF EQUITY, DIVERSITY AND INCLUSION, AS WELL AS EXTERNAL AFFAIRS THROUGHOUT THE PROGRAM
  • NEXT SLIDE PLEASE
  • SINGLE FAMILY HOMES HAVE BEEN A CONSTANT IN THE SOUND INSULATION PROGRAM SINCE 19 85
  • THE VOLUME OF WORK IS CONNECTED TO PARTICIPATION, AND THERE REMAINS 140 POTENTIALLY ELIGIBLE PROPERTIES WITHIN OUR NOISE BOUNDARY
  • NOW, BASED ON HISTORIC ESTIMATES, WE BELIEVE 80 WILL APPLY DURING OUR ACCELERATION PROJECT
  • DURING OUR JUNE OUTREACH CAMPAIGN, WE ACTUALLY HAD A RESPONSE RATE BOOSTED MOSTLY BY NEWER OWNERS, WHICH BRINGS OUR PARTICIPATION NOW TO 51 OUT OF THE 140
  • THE NUMBERS PROVIDED IN THIS UPDATE WILL CONTINUE TO GROW THROUGH OUR EXPANDED OUTREACH
  • IN 2021, WE WILL BE COMPLETING CONSTRUCTION ON AT LEAST 10 HOMES WITH 41 HOMES READY FOR ENGAGEMENT WITH OUR CONSULTING TEAM
  • IN Q FOUR
  • WE ESTIMATE CONSTRUCTION TO BE TO PACE OF 14 HOUSES OR MORE PER YEAR THAT IS DIRECTLY LINKED TO PARTICIPATION, SUBORDINATION AGREEMENTS AND COVID 19 WILL CONTINUE TO BE FACTORS FOR US, WHICH WE WILL MONITOR CLOSELY
  • NEXT SLIDE PLEASE
  • THE REMAIN TWO ACTIVE COMPLEXES AND CONSTRUCTION OF BILL ANCIEN IN THE CITY OF DES MOINES IS COMMENCING THIS MONTH
  • OUR HOT REAL ESTATE MARKET
  • WE HAVE ENCOUNTERED A NUMBER OF UNIT SALES IN THE COMPLEX
  • WHEN A UNIT SELLS, WE WANT TO ACTUALLY RESTART THE DOCUMENT PROCESS WITH THE NEW OWNER, AND SO THIS HAS DELAYED SOME OF OUR PROGRESS
  • WE WILL BE ADDING ADDITIONAL CONSTRUCTION SCHEDULES AS WE COMPLETE OWNER AGREEMENTS
  • NEXT SLIDE, PLEASE
  • WE HAVE BEGUN APARTMENT OWNER OUTREACH AND WE'VE DONE SO IN TWO PHASES
  • THE FIRST WAS A SMALLER GROUP TO TEST AND MEASURE THE MESSAGING
  • WE ACTUALLY HAD A FOUR OUT OF FIVE OF THOSE BUILDING OWNERS HAVE A LOCKED AND THIS IS IN ADDITION TO THE KING COUNTY HOUSING AUTHORITY PROPERTY THAT WE HAD ALREADY PARTNERED WITH
  • WE HAVE SINCE TRIGGERED THE SECOND PHASE AND PARTICIPATION IS ALSO STRONG AMONGST THIS GROUP
  • WHAT THIS WILL DO IS IT WILL ALLOW US TO ACOUSTICALLY TEST MORE PROPERTIES THIS YEAR THAN WAS THE ORIGINAL PROJECTION
  • STEVE WILL NOW BE REVIEWING WITH YOU THE OTHER ELEMENTS OF OUR APARTMENT PLAN
  • THANK YOU, JULIE
  • AS I PREVIOUSLY MENTIONED, WE RECENTLY EXECUTED THE PROGRAM MANAGEMENT CONSULTING CONTRACT, SO THAT WAS A PRETTY BIG STEP FORWARD WITH THE APARTMENT PROGRAM
  • THIS IS ONE EXAMPLE OF HOW THE TEAM HAS WORKED TOWARDS ACCELERATING THE PROGRAM
  • IN SEVEN MONTHS, WE WENT FROM BEING AUTHORIZED TO PROCURE THE PROGRAM MANAGEMENT CONSULTANT TO EXECUTE IN A CONTRACT
  • THIS PROCUREMENT PROCESS TYPICALLY TAKES US ABOUT NINE MONTHS TO COMPLETE
  • EXECUTION OF THIS CONTRACT WILL ALLOW THE TEAM TO NOW BEGIN ACOUSTIC TESTING
  • AS JULIE STATED IN Q FOUR, THIS YEAR, WITH TESTING CONTINUING QUARTERLY THROUGH 2022, DESIGN WILL BEGIN ONE
  • SUBORDINATION AGREEMENTS ARE RECEIVED AND WILL BE FOLLOWED BY CONSTRUCTION WITH COMPLETION OF ALL UNITS BY Q 4
  • 2026
  • NEXT SLIDE PLEASE
  • THE APARTMENT PROPERTIES REPRESENT THE LARGEST PROGRAM WITHIN THE SOUND INSTALLATION PROGRAM, AND IT IS THE CRITICAL PATH OF THE ENTIRE PROGRAM
  • ACOUSTIC TESTING AND OUTREACH IS SCHEDULED TO BEGIN Q 4 2021 AND BE COMPLETED Q 4 2023
  • THE TEAM WILL BE CONDUCTING OUTREACH AND TESTING QUARTERLY FOR APARTMENT COMPLEXES THAT ARE PARTICIPATING IN THE PROGRAM
  • DESIGN AND PERMITTING IS SCHEDULED TO BEGIN Q 4 2021 AND WILL BE ONGOING THROUGHOUT THE PROGRAM COMPLETION NO LATER THAN Q 3 2025
  • I'D LIKE TO HIGHLIGHT THAT DESIGN AND PERMITTING WILL CONSIST OF SEVERAL SEPARATE DESIGN PACKAGES, MANY OF WHICH WILL BE COMPLETED CONCURRENTLY THROUGHOUT THE PROGRAM DURATION
  • CONSTRUCTION IS ANTICIPATED TO BEGIN Q 3 2022 AND WILL BE ONGOING THROUGHOUT THE PROGRAM COMPLETION NO LATER THAN Q 4 2026
  • AND JUST LIKE DESIGN AND PERMITTING, CONSTRUCTION WILL CONSIST OF SEVERAL MAJOR WORKS CONTRACTS BEING COMPLETED CONCURRENTLY THROUGHOUT THE DURATION OF THE PROGRAM
  • NEXT SLIDE, PLEASE
  • AND NOW I'LL TURN IT BACK OVER TO JULIE
  • THANK YOU, STEVE
  • NEXT, WE'RE GOING TO COVER TWO OTHER FUTURE PROJECTS THAT ARE PLANNED FOR IN 2022 AND 2023
  • THERE ARE SEVEN IDENTIFIED PLACES OF WORSHIP WITHIN OUR NOISE BOUNDARY
  • THESE TYPES OF PROJECTS REQUIRE A VERY DIFFERENT DESIGN AND CONSTRUCTION PLAN THAN RESIDENCE
  • THESE ARE VERY ACTIVE FACILITIES, SOME OF WHICH CONTAIN OPERATING SCHOOLS, A FOOD BANK, AND A MULTITUDE OF COMMUNITYBASED ACTIVITIES
  • ONE OF THE KEY ATTRIBUTES THAT WE LOOKED FOR IN OUR DESIGN FIRM WAS A DEEP KNOWLEDGE IN THIS SPACE
  • NEXT SLIDE, PLEASE
  • THERE ARE TWO SINGLE FAMILY HOMES AND ONE MULTI FAMILY BUILDING THAT ARE IN THIS THAT ARE ELIGIBLE FOR VOLUNTARY ACQUISITION
  • THE SOUTH ATZ PROGRAM DETAILS HAVE NOT YET BEEN DEFINED AND STAFF WILL BE WORKING ON THIS IN THE VERY NEAR FUTURE
  • NEXT SLIDE PLEASE
  • SO ALL SUBORDINATION HAVE ALWAYS BEEN A PART OF OUR PROCESS
  • THEY HAVE BECOME PROGRESSIVELY MORE CHALLENGING TO ACQUIRE
  • AFTER EXTENSIVE RESEARCH IN 2020, THE TEAM IDENTIFIED THE SPECIALIZED CONSULTING TYPE NEEDED TO FACILITATE THE PROCESS
  • WITH THEIR INDUSTRY CONTACTS, WE'RE SEEING AN IMPROVEMENT IN THE ACQUIRING OF SUBORDINATION AGREEMENTS IN AVERAGE OF FOUR MONTHS TO DATE
  • THEY HAVE SECURED 33 OF THE REQUIRED 47 SINGLE FAMILY HOME AND CONDO OWNER AGREEMENTS, AND THEIR WORK CONTINUES
  • NOW, THE 14 OUTSTANDING SUBORDINATION HIGHLIGHT THE TWO CHALLENGES THAT WE NOTE ON THE SLIDE
  • SEVEN OF THE REMAINING SUBORDINATION RELATE TO OWNERS THAT HAVE NOT YET SIGNED THE LENDER SPECIFIC THIRD PARTY AUTHORIZATION FORM THAT ACTUALLY ENABLES OUR CONSULTANT TO WORK ON THEIR BEHALF
  • THIS IS DOING PART TO OWNERSHIP CHANGES IN WHICH WE HAVE TO RESTART A PROCESS
  • THE OTHER HALF ARE INSTANCES IN WHICH LENDERS ARE FORWARD TO RESPOND
  • SOME ARE VERY UNFAMILIAR WITH THE PROGRAM AND HAVE MORE QUESTIONS
  • OTHER PROPERTIES ACTUALLY HAVE MULTIPLE LENDERS, AND SO IT DOES REQUIRE A LONGER PROCESS
  • WE WILL CONTINUE TO USE OUR LESSONS LEARNED AND FURTHER REFINE OUR PROCESS WITH OUR CONSULTING TEAM
  • SO NEXT, I WOULD LIKE TO TURN THE DISCUSSION OVER TO REGARDING FUNDING TO MY COUNTERPART ON WIN, THE SENIOR MANAGER OF AVIATION FINANCE AND BUDGETS
  • AND NEXT SLIDE, PLEASE
  • THANK YOU, JULIE
  • GOOD AFTERNOON, COMMISSIONERS AND EXECUTIVE DIRECTOR
  • I WILL BE PRESENTING THE FUNDING PLAN FOR THE NOISE PROGRAM
  • NEXT SLIDE PLEASE
  • THE PORTS PRIOR FUNDING PLAN FOR THE NOISE PROGRAM WAS BASED ON RESOLUTION 2683 WHICH WAS PASSED IN 2013 APPROVING THE PART 150
  • THE SINGLE FAMILY HOMES INSTALLATIONS SPANNING PACE WAS TIED TO THE AVAILABILITY OF LAND
  • NEXT SLIDE PLEASE WITH THE ACCELERATION MOTION PASSED BY COMMISSION IN 20
  • IN FEBRUARY 2020, THE FUNDING PLAN WAS UPDATED TO ACCOMMODATE THE MOTION
  • THE NOISE PROGRAM CONSISTS OF FIVE CAPITAL PROJECTS
  • IT WAS A TOTAL AMOUNT OF 201,000,000 DOLLARS WITH THE CORRESPONDING CASH FLOW
  • THE PROJECT CASH FLOW RESPECT FULL PARTICIPATION AND THAT THE PLAN WOULD BE UPDATED REGULARLY AS CONDITION CHANGE
  • THE FEDERAL AVIATION ADMINISTRATION AIRPORT IMPROVEMENT PROGRAM GRANTS FOR MOST MITIGATION PROJECTS AT SEATAC COMPETE NATIONWIDE WOULD SOUND IN SOUND MITIGATION PROJECTS AT OTHER AIRPORT
  • THE FAA DETERMINES ANNUALLY THE AVAILABILITY OF FUNDS DEPENDING UPON THE NUMBER OF APPLICATIONS FROM ALL AIRPORT NATIONWIDE
  • CONSEQUENTLY, PLANNING IS CHALLENGING BECAUSE THE EXACT AVAILABILITY OF FUNDS FOR THE DURATION OF THE SOUND INSULATION AND ACQUISITION PROGRAMS IS UNKNOWN
  • NOISE GRANTS TYPICALLY FUNDS APPROXIMATELY 80% OF ELIGIBLE COSTS, WITH THE REMAINING AMOUNT BEING FUNDED THROUGH REVENUE BONDS
  • THE AIRPORT WOULD BE REQUIRED TO FUND THE REMAINING 20% PLUS ANY INELIGIBLE COSTS
  • NEXT SLIDE PLEASE
  • THE FUNDING PLAN ASSUMES AN ANNUAL AMOUNT OF 10,000,000 OF PLANS, WHICH IS LIKELY SCENARIO FROM 2020 TO 2029
  • HOWEVER, THE PORT WOULD CONTINUE TO APPLY FOR GRANTS THEREAFTER
  • THE CURRENT FUNDING PLAN ASSUMES THE USE OF 7.1 MILLION FROM THE FAA REINVESTED FUND, 9.2 MILLION OF GRANTS THAT WE GOT RECEIVED AND 80,000,000 A TUTOR WANTS IN 15,000,000 OF REVENUE BONDS
  • THE DEBT SERVICE OF THE REVENUE BONDS WOULD BE CHARGED IN THE AIRLINE WEIGHT BASE AND IS PART OF THE LANDING FEE
  • NEXT SLIDE PLEASE
  • TO MANAGE THE UNCERTAINTY OF THE GRANT AVAILABILITY AND ULTIMATELY FUND THE BALANCE OF COSTS NOT GRANT FUNDED, THE PORT HAS DEVELOPED THE FOLLOWING PLAN, THE USE OF COMMERCIAL PAPER IS AN INTERIM FUNDING SOURCE UNTIL THE AVAILABILITY OF GRANTS IS KNOWN
  • CONTINUE TO APPLY FOR THE GRANTS TO FIND RETROACTIVE SPENDING ISSUE AIRPORT REVENUE BONDS WHEN RETROACTIVE REIMBURSEMENT IS UNLIKELY AND TFC HAS INSUFFICIENT CAPACITY FOR THE NEXT FIVE TO 10 YEARS WITHOUT SHIFTING FROM OTHER PROJECTS SUCH AS THE NORTH SATELLITE AND THE INTERNATIONAL ARRIVALS FACILITY PROJECTS AND THE USE OF TAX LEVY CAN BE A FUNDING SOURCE AVAILABLE
  • NEXT SLIDE PLEASE
  • THEY ARE PROJECT LISTS AND UNCERTAINTIES IN THE PORT FUNDING PLAN
  • HOWEVER, THE FOCUS IS DESIGNED TO ALLOW THE PORT TO MINIMIZE THE AIRLINE WEIGHT BASED IMPACT, LOWER COSTS OR REDO SCOPE DUE TO INELIGIBILITY OR OWN A RELUCTANT TO PARTICIPATE COMBINED WITH ANTICIPATED GRANTS WOULD FURTHER TO REDUCE THE WEIGHT BASED IMPACT WITH AIRLINES AT THIS TIME, I WOULD LIKE TO TURN IN ORDER TO SEE THANKS
  • NEXT SLIDE PLEASE
  • THIS SLIDE HERE REPRESENT SOME OF OUR PROJECT RISKS
  • TIMING TO IDENTIFY WHO IS PARTICIPATING IN THE PROGRAM IS ONE OF THE HIGHER RISKS OF THE PROGRAM
  • EARLY OUTREACH AND COORDINATION IS KEY TO GAIN EARLIER PARTICIPATION IN THE PROGRAM
  • ONCE THEY AGREE TO PARTICIPATE, WE CAN THEN INITIATE ACOUSTIC TESTING
  • ANOTHER TOP RISK TO THE PROGRAM IS THE ABILITY TO ATTAIN SUBORDINATION AGREEMENTS
  • THE PORT TEAM AND THE CONSULTANT TEAM SPECIALIZING IN THESE TYPES OF AGREEMENTS WILL BE HELPING OWNERS NAVIGATE THE PROCESS
  • WITHOUT AGREEMENTS IN PLACE, DESIGNS CANNOT PROCEED
  • NEXT SLIDE, PLEASE
  • PROGRAM NEXT STEPS
  • THE NEW CONSULTANT PROGRAM MANAGEMENT TEAM WILL BEGIN PLANNING, TESTING AND DESIGN
  • WE'LL BE CONTINUED WITH OWNER OUTREACH
  • AND AS SUBORDINATION AGREEMENTS FOR APARTMENT COMPLEXES ARE RECEIVED, DESIGNS WILL BEGIN
  • WE'LL CONTINUE ACCELERATING A SINGLE FAMILY HOMES PROGRAM
  • WE PLAN ON COMPLETING CONSTRUCTION ON THE VILLA AND CONDOMINIUM COMPLEX FOR ALL THE UNITS WITH AGREEMENTS IN PLACE
  • APARTMENT DESIGN AUTHORIZATION
  • MANY OF THE ITEMS PRESENTED RELATED TO THE APARTMENT PROGRAM ARE DEPENDENT ON DESIGN AUTHORIZATION, WHICH I'LL BE PRESENTING AND REQUESTING AS AN NEXT AGENDA ITEM TODAY
  • NEXT SLIDE, PLEASE
  • AND ANY QUESTIONS
  • CLERK HART, CAN YOU PLEASE CALL THE ROLL? OF COURSE, BEGINNING WITH COMMISSIONER BOWMAN FOR QUESTIONS? WELL, THANK YOU
  • YEAH, I HAVE SEVERAL QUESTIONS, AND I'M GOING TO START WITH LET ME SEE IF I UNDERSTAND THIS CORRECTLY WITH THIS ACCELERATED PROGRAM
  • ARE YOU SAYING THAT WE'RE GOING TO BE DOING 10 HOMES PER YEAR? DID I UNDERSTAND THAT CORRECTLY? I THINK I'LL HAVE JULIE ANSWER THAT QUESTION
  • NO, IT'S MORE THAN 10 HOMES PER YEAR
  • DO YOU WANT TO GO OVER THE THE ANNUAL PLAN AND WHAT'S THAT BASED ON? CERTAINLY
  • AND THANK YOU, COMMISSIONER POINTS FOR THAT QUESTION
  • SO WE CAN CLARIFY
  • SO FOR THIS YEAR, THE NUMBER OF HOMES THAT WE ARE ON PACE TO DO ARE JUST OVER 10
  • AND THAT REPRESENTS HOMEOWNERS THAT WERE ALREADY IN THE PIPELINE, THAT WE HAD AGREEMENTS NEXT YEAR
  • THAT NUMBER WILL BE MUCH LARGER
  • AND REALLY, WHAT WE'RE LOOKING AT IS THE NUANCE SPECIFICALLY WITH SINGLE FAMILY IS THE FACT THAT OUT OF, YOU KNOW, 9,400 THAT HAVE BEEN COMPLETED OVER THE LAST THREE DECADES, WE ARE DOWN TO A VERY SMALL GROUP OF 140 HOMES THAT PREDOMINANTLY HAVE NOT BEEN WILLING TO PARTICIPATE IN THE PROGRAM
  • AND SO THERE WILL BE INITIALLY BECAUSE OF OUR EARLY OUTREACH, A MUCH LARGER GROUP PROJECTED OVER THE NEXT COUPLE OF YEARS THROUGH THE BALANCE OF THE PROGRAM, JUST DEPENDING UPON PARTICIPATION, THAT'S REALLY WHAT'S GOING TO DRIVE THE NUMBER OF HOMES
  • SO THE FORTUNATE THING IS AS [inaudible 02:20:20] AS PART OF THE FUNDING PROGRAM, BECAUSE WE ARE NO LONGER LIMITED TO THAT DIRECT LINK WITH GRANT FUNDS, WE NO LONGER HAVE THAT AS A BARRIER
  • SO NOW IT'S REALLY IT'S TYING IT TO THE PARTICIPATION AND DOING EVERYTHING IN OUR POWER SUPPORT TO SPEED SOMEONE THROUGH THE PROCESS
  • OKAY, THAT'S MY FIRST
  • SO YOU SAID ABOUT 14 HOMES THIS YEAR AND YOU SAID GREATLY EXPANDED FOR NEXT YEAR
  • WHAT IS GREATLY EXPANDED MEAN? THAT'S ANOTHER GREAT QUESTION
  • SO CURRENTLY WHAT WE HAVE AGREEMENTS IN PLACE, AND ONCE WE HAVE THE CONSULTANT FULLY ON BOARD AND CAN BEGIN, WE ALREADY HAVE EIGHT HOMES
  • THEY'RE READY TO MOVE INTO CONSTRUCTION
  • SO WE ARE ALREADY NEAR THAT LEVEL
  • WE HAVE ANOTHER
  • AND THEY ARE PART OF THAT GROUP OF 41 THAT WE HAVE TESTING THAT WE HAVE DESIGNS AND DOCUMENTS FOR
  • SO IN TERMS OF WHAT THE ACTUAL NUMBER OF CONSTRUCTION WILL BE EACH YEAR, THAT'S VERY HARD TO PREDICT RIGHT HERE
  • JUST BECAUSE IT DOES BECOME IT'S A MATTER OF HOW DO THEY ACOUSTICALLY TEST, WHAT RATE DO THE CONSTRUCTION DID THE SUBORDINATION AGREEMENTS COME IN AND THEN WE MOVE THEM FORWARD INTO CONSTRUCTION? WHAT I JUST WOULD LIKE TO CONVEY IS WE ARE NOT GOING TO ATTEMPT TO HAVE ANY ARTIFICIAL LIMITS ON HOW MANY WE DO
  • OUR GOAL, WE ARE VERY LASER FOCUSED ON THE CRITICAL MISSION, WHICH IS TO MOVE HOMEOWNERS THROUGH THE PROCESS AS QUICKLY AS POSSIBLE SO THAT WE CAN PROVIDE THIS
  • WE OKAY, LET ME ASK YOU A QUESTION ANOTHER WAY
  • WHAT ARE THE 1, 2 OR THREE THINGS THAT WOULD SPEED UP THE PROCESS TO HAVE MORE RESIDENCES, PLACES OF WORSHIP AND SCHOOLS DONE MORE QUICKLY? WHAT IS STILL TO HOLD UP? I UNDERSTAND IN THE PAST, IT'S BEEN THIS COORDINATION AGREEMENTS, WHICH I PERSONALLY SPENT A LOT OF TIME ON
  • THEN IT WAS WE NEEDED A CONSULTANT
  • IT SOUNDS LIKE IT TOOK SEVEN MONTHS TO GET A CONTRACT FOR A CONSULTANT
  • THAT'S GREAT
  • WE'VE GOT SOMEBODY ON BOARD
  • WHAT ARE THE TOP THREE THINGS THAT COULD BE DONE IF THOSE WERE ACCOMPLISHED THAT COULD DRAMATICALLY ACCELERATE THIS PROGRAM
  • I'M NOT SURE WHO IS THE BEST PERSON TO ANSWER THAT, BUT IF YOU COULD REALLY LASER FOCUS ON A COUPLE OF THINGS THAT WOULD BE LIKE, GOD, WE COULD GET 30 HOMES DONE THIS YEAR INSTEAD OF JUST EIGHT, WHAT WOULD THAT BE? AND I'M SITTING OUTSIDE SO THAT FOLKS CAN HEAR ME ON THE FLIGHT PASS, THOUGH
  • BUT I WANT TO BE CLEAR, I'M ONLY ON BEACON HILL, SO I'M NOT DIRECTLY IMPACTED THE WAY OUR AIRPORT COMMUNITIES ARE
  • SO, AGAIN, REALLY, ONE CAN TRY AND HELP WITH THAT QUESTION
  • THAT WOULD BE GREAT
  • THANK YOU, SAM
  • YES, THIS IS STAN SHEPHERD
  • I'M THE MANAGER OF THE NOISE PROGRAMS AND WHAT WE REALLY DO IS WE BELIEVE AT THIS POINT, THE PROGRAM THAT WE'RE PUTTING TOGETHER WITH THE GREAT HELP OF JULIE AND STEVE, ARE REALLY AIMED AT MEETING THAT COMMISSION RESOLUTION THAT FINISHED THE PROGRAM BY THE END OF 2026
  • SO THAT'S REALLY THE ACCELERATION
  • WE'RE ON TRACK AND MEET THAT SO FAR
  • WE'VE PUT THE FUNDING PLAN TOGETHER TO GET THERE
  • WE'VE GOT THE STAFF TOGETHER
  • IT WAS REALLY A STAFFING ISSUE AND THE MANAGEMENT ISSUE TO GET THE PROJECT MOVING ALONG
  • WE'VE HIT ALL THOSE STEPS
  • WE'VE GOT SOME GREAT PEOPLE IN PLACE AT THIS POINT, AND WE'VE GOT THE FUNDING PLAN IN PLACE
  • WE'VE GOT WHAT WE YOU'RE GOING TO APPROVE NEXT TO THAT CONTRACT AUTHORIZATION TO MOVE THROUGH THE APARTMENT SOUND INSULATION PROGRAMS SO I THINK WE'RE MOVING IT'S PRETTY FAST SPEED AT THIS POINT TO GET IT IN PLACE, WE'VE ELIMINATED THAT KIND OF ISSUE WITH THE FUNDING
  • SO WE'RE MOVING ALONG PRETTY QUICKLY WITH THIS, BUT IT'S REALLY STAFFING FUNDING AND THE OVERSIGHT OF THE PROJECT TO MOVE IT FORWARD
  • SO BUT YOU'VE GOT THE STAFFING IN PLACE, YOU FEEL LIKE THE FUNDING IS NOT AN ISSUE MOVING FORWARD
  • CORRECT
  • OKAY
  • WE'RE AT A POINT WITH HANS GROUP THAT THEY HAVE A PLAN IN PLACE TO ACTUALLY UPFRONT THE COST OF THESE PROGRAMS IF WE CANNOT GET FAA GRANTS IN PLACE BEFORE THE CONSTRUCTION BEGINS
  • WE WORKED WITH THE FAA TO MAKE SURE THAT IF WE DO THAT UPFRONT FUNDING AT A LATER DATE, THESE PROGRAMS WILL BE ELIGIBLE FOR GRANT REIMBURSEMENT
  • IF AN FAA FUNDING GRANT BECOMES AVAILABLE SOMETIME IN THE FUTURE, WE CAN GET PAID FOR WHAT WE'VE ALREADY DONE IN THE PAST
  • SO THAT HELPS US ALSO TO RECOVER THOSE COSTS THAT WOULD OTHERWISE JUST BE AT THE PORT EXPENSE
  • OKAY
  • AND THEN TWO MORE QUESTIONS
  • YOU HAD TALKED ABOUT THIS GOING INTO THE RATE BASE
  • HAVE WE EVER CONSIDERED AS PART OF THE SLOA AGREEMENTS TO REALLY ACCELERATE THE FUNDING FOR THIS PROGRAM USING SLOA? I HAVE TO TURN THAT BACK TO HAN HERE
  • YES
  • WE ARE GOING THROUGH THE AIRLINE NEGOTIATION, AND THAT CAN BE A TOPIC, AND I WILL BRING IT INTO THE PORT OF THE PLAN FOR THE AIRLINE NEGOTIATIONS
  • OKAY
  • I THINK I WOULD AT LEAST ONE LIKE TO SEE IT BE CONSIDERED
  • I KNOW THAT THE AIRLINES WILL PUSH BACK, BUT AT THE END OF THE DAY, IT IS THE PLANES THAT ARE CAUSING THE NOISE
  • IT'S NOT THE PORT OF SEATTLE
  • IT IS THE PLANES
  • SO THOSE ARE ALWAYS TOUGH NEGOTIATIONS, BUT I THINK THAT THEY SHOULD BE PAYING HELPING FUND THIS PROGRAM MOVING FORWARD, PARTICULARLY FOR THE EXPLORATION
  • YEAH
  • AND AS STEVE MENTIONED, WE JUST RECEIVED THE MII MAJORITY OF INTEREST FROM THE AIRLINE, AND IT WAS APPROVED FOR THE APARTMENT 13,000,000 FOR THE PROJECT
  • SO WE'RE REALLY HAPPY WE'RE COLLABORATING WITH THEM, AND WE'RE FILLING THEM IN
  • AND SO IT'S A COLLABORATION OF WORD
  • SO WE GOT THAT THROUGH WITH AIRLINES
  • OKAY
  • EXCELLENT
  • AND THEN JUST ONE LAST QUESTION ON ONE OF THE FINAL SLIDES, YOU HAD SOME CHANGES THE RISK TO THE PROGRAM, AND ONE WAS A CHANGE TO THE NOISE CONTOURS
  • COULD YOU TALK ABOUT WHY YOU SAW THAT AS A RISK? THIS IS STANDING AT ALL
  • I'LL GO AHEAD AND TALK TO THAT ONE
  • THE FAA APPROVES THE NOISE CONTOUR FOR THESE TYPE OF PROGRAMS WE'VE TALKED ABOUT IN THE PAST, AND IT'S ONLY ELIGIBILITY WITHIN THAT CONTOUR THAT THEY WILL FUND PROGRAMS SO OUR CONTOUR RIGHT NOW IS GETTING OLD
  • IT WAS DONE IN OUR LAST PART 150 STUDY
  • IT WAS ACTUALLY YOUR PROJECTED CONTOUR FOR THE YEAR 2018 WHEN WE DID THAT
  • SO WE'RE GOING TO BE LOOKING AT THOSE CONTOURS AGAIN COMING UP IN ANOTHER YEARS, WE WOULD PROBABLY GO INTO ANOTHER PART 150 STUDY STARTING AT THE END OF NEXT YEAR
  • AND WHEN THAT CONTOUR IS UPDATED, WE HAVE TO ACCEPT THE RESULTS OF IT
  • SO THAT COULD BE EITHER A LARGER CONTOUR OR A SMALLER CONTOUR
  • FROM THE INDICATIONS WE'VE TALKED WITH OUR CONSULTANTS RIGHT NOW, IT'S NOT GOING TO BE DRAMATIC, WE DON'T THINK
  • BUT THERE COULD BE SOME AREAS THAT CHANGE WITH IT
  • AND IF THOSE AREAS CHANGE, EITHER WE COULD BE MORE INCLUSIVE OR THINGS WOULD NO LONGER BE ELIGIBLE
  • SO THAT'S A RISK THAT WE'RE TAKING MOVING FORWARD
  • AND IT'S A RISK THAT IT IS JUST BASICALLY STATISTICS ON THE AIRPORT OPERATIONS THAT PUTS US INTO THAT
  • OKAY
  • THANK YOU
  • AND THEN FINAL FINAL QUESTION, I PROMISE, IN TERMS OF THE PORT PACKAGES, HOMES THAT HAD BEEN PREVIOUSLY INSULATED IN THOSE PACKAGES FAILED
  • COULD YOU GIVE US AN UPDATE ON WHERE WE ARE WITH THAT? YEAH
  • WE HAVEN'T MOVED THAT ONE INTO A PROJECT YET
  • AS YOU CAN SEE, WE'VE REALLY HAD A LOT OF WORK GOING ON WITH ALL OF THE OTHER THINGS WE PUT TOGETHER HERE WITH APARTMENTS AND CHURCHES AND ALL THE OTHER STUFF
  • SO WE HAVEN'T MOVED THAT INTO A PROJECT YET, AND IT STILL IS UNKNOWN WHERE THE FUNDING IS GOING TO COME FROM ON THAT
  • SO WHAT WE HAVE IS A PROJECT THAT IS UNFUNDED
  • WE KNOW THERE'S TWO DIFFERENT ELEMENTS TO THAT
  • THERE'S ONE THAT IS REALLY JUST FAILED WINDOWS
  • SO WE KNOW THINGS ARE BREAKING THE GETTING OLD
  • IT'S PART OF THE PROCESS
  • AND THEN THERE'S ANOTHER EFFORT BY THE FAA
  • I CALL IT THE 1993 EFFORTS
  • AND WITH THAT, THE FAA HAS INDICATED THAT ANY HOMES BUILT PRIOR TO SOUND INSULATED PRIOR TO 1993 MAY NOT HAVE BEEN DONE UNDER THEIR STANDARDS
  • SO THEY'RE ALLOWING SOME GRANT FUNDING FOR THOSE PROJECTS SPECIFICALLY DONE 1993 UNDER AN FAA GRANT
  • AND WHAT THEY'RE SAYING IS THAT WE WE WOULD GO BACK INTO THOSE HOMES, WE WOULD SOUND TEST THOSE HOMES
  • AND IT WOULD BE BASED ON THAT ELIGIBILITY WITHIN THE CONTOUR AND THE SOUND TESTING THAT WE COULD GO BACK IN AND DO SOME RETRO FITS WITH THOSE TYPE OF PROJECTS
  • THOSE COULD BE GRAND ELIGIBLE
  • THE OTHERS CANNOT
  • SO IF IT'S JUST A FAILED PACKAGE, WINDOW FRAMES ARE BREAKING OR WHATEVER IT IS, THOSE ARE NOT GRANT ELIGIBLE AT THIS POINT
  • SO WE'RE WORKING WITH OUR GOVERNMENT RELATIONS STAFF, ERIC SEINFELD, TO COME UP WITH SOME OPPORTUNITIES TO LOOK AT OTHER GRANT FUNDING KIND OF PROCESSES WITH THAT TO GET US GRANT FUNDING
  • ONE OF THOSE IS THROUGH THE FEDERAL BUDGET RECONCILIATION PROCESS, WHICH IS GOING TO HAPPEN AT THE FOLLOW THIS YEAR
  • SO HE'S GOING TO KEEP AN EYE ON THAT
  • HE'S ALSO LOOKING AT THE FAA REAUTHORIZATION BILL, WHICH IS GOING TO HAPPEN IN 2023
  • SO WE HAVE A COUPLE OF OPPORTUNITIES THERE TO INVESTIGATE HOW WE CAN GET SOME MORE GRANT FUNDING ELIGIBLE FOR THESE PROJECTS
  • OKAY
  • WELL, THEN THANK YOU
  • NO
  • AND THAT WAS ACTUALLY THAT ILLUMINATED A LOT
  • I THINK WE'VE GOTTEN QUESTIONS OVER THE LAST COUPLE OF YEARS ABOUT PORT PACKAGES AND WHY HASN'T MOVED FORWARD
  • AND IT SOUNDS LIKE THERE'S NO REAL PROGRAM TO MOVE IT FORWARD
  • AND IT'S LOOKING AT DIFFERENT SOURCES OF FEDERAL FUNDING WHERE WE MAY BE ELIGIBLE FOR THAT
  • BUT THE COMMISSION CAN MAKE A DECISION TO FIND FUNDING FOR THOSE PACKAGES THAT HAVE FAILED IN THE PAST
  • AND I FROM ALMOST SAY IT'S A PRIORITY FOR ME
  • I KNOW THAT WE ALL CARE VERY DEEPLY ABOUT THE FOLKS THAT LIVE DIRECTLY AROUND THE AIRPORT
  • AND I BELIEVE WE NEED TO DO MUCH MORE THAT'S EVERYTHING FROM PLANT MORE TREES TO KEEP THE NOISE DOWN AND CARBON SEQUESTRATION TO HELPING THE PEOPLE THAT LIVE AROUND THE MOST URBAN AIRPORT IN THE COUNTRY
  • AND SO IF WE NEED A COMMISSION MOTION THAT DIRECTS THE STAFF TO LOOK AT OTHER FUNDING SOURCES, INCLUDING THE TAX OR SLOA, SO THAT WE CAN GO BACK AND DO THE PORT PACKAGES
  • BUT I'M UNWILLING TO WAIT ANYMORE FOR FEDERAL FUNDING TO COME FORWARD TO HELP FIX A PROBLEM THAT'S BEEN OUT THERE FOR MORE THAN 20 YEARS
  • THANK YOU
  • THANK YOU, COMMISSIONER BOWMAN
  • MOVING THE COMMISSIONER CALKINS JUST COMMENT TO SAY I REALLY APPRECIATE THE WORK THAT OUR FEDERAL GOVERNMENT AFFAIRS TEAM HAS DONE TO COORDINATE EFFORTS WITH OUR CONGRESSIONAL DELEGATION ON ADDRESSING THAT VERY ISSUE, THAT THIS IS A NATIONWIDE PROBLEM, THAT AVIATION NOISE IMPACTS COMMUNITIES AROUND AIRPORTS ALL OVER THE COUNTRY
  • AND I'M PROUD OF THE PORT OF SEATTLE FOR LEADING ON INNOVATIVE PROGRAMS TO IDENTIFY THE PROBLEM AND ALSO LEADING ON ADVOCACY EFFORTS TO GET THE KIND OF FEDERAL LEVEL FUNDING WE NEED TO REALLY ADDRESS THEM
  • AND I'M APPRECIATIVE TO THE COMMUNITY ENGAGEMENT WE'VE GOTTEN THROUGH THINGS LIKE THE HIGHLINE FORUM AND AND MANAGING DIRECTOR LYTTLE'S IDEA TO CREATE START, WHERE WE GO STRAIGHT TO COMMUNITY MEMBERS AND ASK FOR HER AND WORK WITH THEM AND USING COMMUNITY DERIVED IDEAS TO ADDRESS SOME OF THESE PROBLEMS WITHIN THE LEGAL MEANS THAT WE HAVE A SUPPORT AND THEN ALSO TO GO AS A COLLECTIVE GROUP TO DC AND ADVOCATE FOR CHANGES SO THAT WE CAN DO MORE
  • SO CONGRATULATIONS TO OUR TEAM FOR IDENTIFYING THESE THINGS, AND ALSO FOR THANK YOU FOR TAKING WHAT WAS REALLY LED BY COMMISSIONER BOWMAN THE IDEA TO ACCELERATE THESE PACKAGES
  • AND COMING BACK TO US TODAY WITH A PLAN FOR HOW YOU CAN BE ABLE TO DO THAT AND RECOGNIZING THAT YOU'RE WORKING WITHIN BANKING AND LEGAL MORASS THAT IS VERY CHALLENGING TO NAVIGATE
  • BUT THANK YOU TO ALL OF YOU WHO ARE WORKING ON THIS
  • THANK YOU
  • COMMISSIONER CALKINS
  • MOVING TO COMMISSIONER CHO
  • YEAH
  • THANKS FOR THE PRESENTATION TO YOUR TEAM STAND AND EVERYONE ELSE
  • I WANT TO ASK A QUESTION ABOUT REVISITING THE SUN MITIGATION THAT WAS DONE 23 YEARS AGO
  • IF WE WERE TO DECIDE TO GO BACK AND FREE UP OR WE INSTALL THE MITIGATION PACKAGES BECAUSE THEY FAILED, WILL WE STILL REQUIRE OR NEED TO GET YOUR SUBORDINATION AGREEMENTS OR IS THAT JUST A REQUIREMENT FOR FAA REIMBURSEMENT? YEAH
  • THE SUBORDINATION AGREEMENTS DON'T HAVE ANYTHING REALLY TO DO WITH THE FA REIMBURSEMENT
  • IT'S STATE LAW THAT WE ACTUALLY HAVE TO OBTAIN A NAVIGATION EVENT
  • AND IN ORDER TO GET THAT NAVIGATION EVENT ON A PROPERTY THAT HAS A MORTGAGE, THEN WE REQUIRE THAT SUBORDINATION AGREEMENT
  • OKAY
  • SO IT STILL APPLY
  • IF THE PROPERTY FROM 30 YEARS AGO THAT GOT THE SUN MITIGATION NEEDS A FIX AND STILL HAS A MORTGAGE, WE WOULD STILL NEED TO GO AND GET THAT
  • MOST LIKELY, WE WOULD HAVE TO UPDATE THAT AVIATION SENT, WHICH WOULD REQUIRE US TO HAVE THAT SUBORDINATION AGREEMENT
  • OKAY
  • OKAY
  • I THINK THAT WAS MY ONLY POINT OF CLARIFICATION
  • I MEAN, I OBVIOUSLY AGREE WITH MY COLLEAGUE STEPHANIE THAT WE SHOULD DO IT
  • WE CAN TO ACCELERATE THIS EFFORT, AND I THINK WE'VE COME UP WITH SOME CREATIVE SOLUTIONS HERE
  • AND SO I LOOK FORWARD TO SEEING HOW MANY MORE YOU CAN GET IN THE NEXT FEW MONTHS
  • BUT I'M ALSO OPEN TO ADDITIONAL RECOMMENDATIONS FROM YOU AND YOUR STAFF ON HOW WE CAN ACCELERATE THIS
  • THANK YOU
  • I JUST WANT ONE POINT TO THE COMMISSIONER CHILD
  • THANK YOU VERY MUCH
  • I DO WANT TO POINT OUT
  • SO NOW THAT WE HAVE THIS CONSULTANT, EXPERT TEAM ON BOARD WHO'VE DONE THIS ALL ACROSS THE COUNTRY, OUR PLAN IS TO REALLY WORK WITH THEM AND IDENTIFY ANY POTENTIAL INNOVATIVE OPPORTUNITIES TO CONTINUE TO ACCELERATE THE PROGRAM
  • I JUST WANT TO POINT OUT OUR TEAMS ULTIMATE GOAL IS TO COMPLETE THE PROGRAM AS QUICKLY AS FEASIBLE AND WITH IN LINE WITH PORT PROCESSES AND PROCEDURES, BUT ALSO A HIGH LEVEL OF QUALITY
  • SO THAT'S MY ULTIMATE GOAL
  • I WANT TO DO IT AS QUICKLY AS POSSIBLE AND GET IT DONE AS QUICKLY AS POSSIBLE WITHIN LINES OF OPERATING HERE AT THE PORT
  • THANK YOU
  • THANK YOU, COMMISSIONER CHO
  • MOVING TO COMMISSIONER STEINBRUECK
  • THERE WE GO ON THE MIC
  • WE SHOULD HAVE THE MASTER CONTROLLER MANAGE THE TOGGLE SWITCH
  • I CAN'T UNMUTE YOU
  • I CAN ONLY MUTE YOU
  • OKAY
  • WELL, I GUESS YOU'RE NOT OMNIPOTENT
  • I JUST WANT TO EXPRESS MY APPRECIATION FOR THESE EFFORTS
  • IT'S BEEN, I WOULD SAY, SOMEWHAT LONG, AND HE PASSED THE ACCELERATION POLICY TO I THINK IT WAS TWO YEARS AGO
  • I WANT TO EXPRESS MY APPRECIATION FOR COMMISSIONER BOWMAN, IN PARTICULAR, FOR HER STRONG AND DETERMINED LEADERSHIP TO GET MORE DONE FASTER AND IN A BETTER WAY
  • IT'S BEEN CHALLENGING
  • IT'S COMPLICATED
  • IT'S NOT AN EASY TASK TO RETROFIT SOME 140 HOMES AND BUILDINGS AND OTHER FACILITIES, BUT IT IS ALL IMPORTANT
  • AND WE KNOW THAT IT'S ONE OF THE MOST IMPORTANT AND DIRECT THINGS WE CAN DO TO AMELIORATE NOISE IMPACT ON LOCAL COMMUNITIES WITHIN THE CONSTRAINTS, UNFORTUNATELY, THAT WE HAVE UNDER FAA REGULATIONS
  • BUT I THINK THIS IS A GREAT RENEWED EFFORT, AND WE JUST HAVE TO KEEP THAT EFFORT GOING STRONG AND EXPEDITIOUSLY
  • AND I HOPE WE CAN FIND OTHER WAYS, PERHAPS, OR THE SOUTH KING COUNTY COMMUNITY IMPACT FUND TO ADVANCE MORE ENVIRONMENTAL HELP, IF YOU WILL REMEDIATION SUPPORT AND COMBINE THAT WITH OPPORTUNITIES FOR LOCAL GREEN JOBS AT THE SAME TIME
  • THANK YOU VERY MUCH
  • THANK YOU, COMMISSIONER STEINBRUECK
  • COMMISSIONER BOWMAN
  • THANK YOU
  • I HAD TWO QUESTIONS
  • 1 WAS INVOLVING THE FOLKS WHO ARE ACTUALLY DOING THE WORK
  • ARE WE MAKING SOME SORT OF INTERNSHIP EFFORTS ASSOCIATED WITH THIS CONSTRUCTION WORK? INTERNSHIPS WITH THE CONSTRUCTION WORK? SO ARE YOU ASKING ABOUT STAFFING FOR INTERNS WITHIN THE CONSTRUCTION MANAGEMENT PROJECT MANAGEMENT GROUP, OR ARE YOU ASKING ABOUT APPRENTICE TYPE POSITIONS WITH THE TRADES? YES
  • ANYTIME
  • THIS IS A BIG UNDERTAKING, I THINK, MOSTLY IN TERMS OF TRADES, PERSONALLY
  • BUT IF THIS DOES AN OPPORTUNITY TO REALLY GET YOUR HANDS INVOLVED WITH A LOT OF WORK
  • SO I'LL HAVE TO GET BACK TO YOU ON THAT QUESTION AND TAKE THAT BACK TO MY CONSTRUCTION MANAGEMENT TEAM AND TAKE A CLOSER LOOK AT THAT
  • BUT WE CAN CERTAINLY GET BACK TO YOU WITH THAT QUESTION
  • THANK YOU
  • AND WHEN WE THINK ABOUT THIS PROGRAM, IT'S CALLED INSULATION, BUT WE OFTEN THINK OF JUST WINDOWS
  • SO WHAT ARE SOME OF THE OTHER THINGS THAT WE DO TO REDUCE NOISE? JULIE, YOU WANT TO TAKE THAT ONE? YEAH
  • I'LL TAKE THAT
  • IT ALSO KIND OF SPEAKS TO WE TALKED QUITE A BIT ABOUT WITH HIGHLINE SCHOOL AND USING THE MERV 13 FILTERS
  • AND SO PART OF THE SOUND INSULATION PROJECT IS ALSO THE AIR VENTILATION
  • AND SO IN STRUCTURES THAT DON'T HAVE A FURNACE, WHICH IS PREDOMINANTLY CONDOS APARTMENTS, ONE OF THE ELEMENTS THAT WE DO IS WE WILL ACTUALLY CREATE AN EXTERNAL AIR INTAKE BECAUSE REALLY THE SOUND WE CAN PUT IN WINDOWS, BUT AS SOON AS YOU OPEN THEM, YOU SORT OF LET THE SOUND BACK IN
  • THE VENTILATION SYSTEMS IS ALSO A KEY ELEMENT OF IT
  • AND SO WHENEVER WE ARE PUTTING IN THE EXTERNAL AIR INTAKE, WE ARE USING THOSE SAME MERV 13 FILTERS SO THAT WE CAN ACHIEVE THE BEST INDOOR AIR QUALITY
  • WE'RE A LITTLE BIT MORE LIMITED IN TERMS OF SINGLE FAMILY HOMES BECAUSE WE DO USE EXISTING FURNACES FOR THE DISTRIBUTION
  • AND THOSE FURNACES HAVE KIND OF THEIR OWN MAXIMUM CAPACITY IN TERMS OF FILTRATION
  • AND SO THEN WE LINK TO THAT
  • THAT'S FASCINATING
  • I MEAN, I WOULD HAVE HAD NO IDEA THAT WHAT AN INCREDIBLY BENEFICIAL SECONDARY BENEFIT TO THE COMMUNITIES THAT LIVE THERE
  • I MEAN, I ALWAYS THOUGHT THAT THE FAA PROGRAM SHOULD HAVE WE CAN MITIGATE NOISE, BUT WE NEVER DO THINGS TO DIRECTLY MITIGATE AIR
  • BUT IN FACT, THE NOISE PROGRAM DOES MITIGATE AIR
  • SO I THINK THAT'S A GREAT TOFOR AND WOULD LOVE TO KNOW MORE
  • THE OTHER SIDE BENEFIT, I WOULD ASSUME, IS GOING TO HAVE OF GREENHOUSE GAS REDUCTION MEASURES
  • AND SO I'M JUST WONDERING WHETHER WE'VE TAKEN ANY ATTEMPT TO CALCULATE HOW MUCH THESE ARE VALUE IMPROVEMENTS GO TOWARDS ENERGY SAVINGS
  • YEAH
  • AND THANK YOU FOR THAT QUESTION
  • I WILL SAY I DON'T KNOW THAT WE'VE STUDIED THAT EXTENSIVELY, BUT AS WITH YOUR OTHER QUESTION, I THINK THAT'S A GOOD ONE FOR US TO TAKE BACK TO OUR BROADER TEAM TO BE ABLE TO IDENTIFY THOSE TYPES OF PIECES OF INFORMATION AS WELL
  • I JUST THINK THIS IS A GREAT UNDERTAKING
  • THANK YOU, COMMISSIONER BOWMAN, FOR CONTINUING TO PUSH FORWARD
  • BUT I MEAN, THIS IS A GREAT THING FROM THE ORGANIZATION
  • AGAIN, WE NEED TO TAKE MORE CREDIT FOR THE WORK THAT WE DO AND WHEN THEY'RE NOT THE PRIMARY PURPOSE
  • BUT THESE ARE OTHER GREAT, GREAT ACCOMPLISHMENTS THAT I I LOOK FORWARD TO
  • YOU TELLING US ABOUT ALL THE ADDITIONAL BENEFITS THAT YOU'RE GOING TO BRING TO THE NEIGHBORHOOD
  • SO I THANK YOU VERY MUCH
  • I GUESS WE NEED A MOTION NOW
  • NO, THERE IS NO ACTION ON THIS ITEM IS TO COMMISSION ME
  • YES, THAT IS FOR THE NEXT ACTION
  • SO YOU ARE CORRECT, BUT IT IS STILL COMING
  • ALRIGHT
  • SO ACTUALLY YES, UNLESS THERE'S ANY FURTHER QUESTIONS, WE WILL MOVE ON THEN TO I BELIEVE IT'S 10-D
  • THIS IS ITEM 10-D AND I'LL READ IT INTO THE RECORD
  • THIS IS FOR AUTHORIZATION FOR THE EXECUTIVE DIRECTOR TO PLAN, DESIGN AND PREPARE CONSTRUCTION DOCUMENTS FOR THE APARTMENT SOUND INSTALLATION PROGRAM LOCATED WITHIN THE CURRENT NOISE REMEDY BOUNDARY NEAR THE SEATTLE TACOMA INTERNATIONAL AIRPORT
  • IN THE AMOUNT NOT TO EXCEED 34,386,000 DOLLARS FOR A TOTAL APARTMENT PROGRAM COST OF 133,515,000 DOLLARS
  • SO MOVED SECOND
  • OKAY, LET'S GO AHEAD AND GET TO EXECUTIVE DIRECTOR METRUCK FIRST FOR HIS INTRO AND THEN WE WILL HEAR FROM STAFF BEFORE THE MAIN MOTION
  • COMMISSIONER, OF COURSE, THIS IS THE AGENDA ITEM DIRECTLY TIED TO THE BRIEFING YOU JUST RECEIVED
  • AND STEVE IS PREPARED TO PRESENT THE REQUEST TO AUTHORIZE DESIGN FOR THE ENTIRE AUDIENCE INSTALLATION APARTMENT PROGRAM
  • SO I DON'T KNOW IF YOU DESIRE THAT BRIEFING OR STEVE, WE CAN MR WELL, I MEAN, CAN YOU GIVE US A QUICK SYNOPTIC REVIEW? I MEAN, IT SEEMS LIKE YOU JUST GAVE US THE BEEF OF THE STORY
  • YEAH, I CAN GIVE IT A QUICK OVER YOU
  • I DON'T KNOW IF YOU WANT TO RUN THROUGH THE PRESENTATION
  • JUST THREE QUICK SLIDES JUST TO KIND OF GIVE YOU GUYS MORE OF AN OVERVIEW OF THE APARTMENT PROGRAM WHAT WE HAVE GOING ON
  • BUT THANK YOU
  • YEAH, SURE
  • SO THANKS, EXECUTIVE DIRECTOR METRUCK
  • AND AGAIN, GOOD AFTERNOON, COMMISSIONERS
  • NEXT SLIDE, PLEASE
  • SO IT'S FOR THE PROGRAM TODAY
  • I'M REQUESTING DESIGN AUTHORIZATION FOR THE 3,400,000 DOLLARS
  • THIS REQUEST WILL SUPPORT THE COMMISSION MOTION TO ACCELERATE ON INSTALLATION PROGRAM
  • AS I'VE ALREADY STATED, THIS IS THE LONGEST CRITICAL PATH OF THE PROGRAM WILL BE COMPLETING 18 APARTMENT COMPLEXES WITH 903 UNITS
  • THE AUTHORIZATION WILL ALSO ALLOW THE TEAM TO BEGIN AND COMPLETE ALL OF SIC TESTING, PLANNING, PROJECT DOCUMENTATION, THE SUBORDINATION AGREEMENT, SUPPORT AND COORDINATION NEEDED AND PREPARATION OF ALL DESIGN AND CONSTRUCTION DOCUMENTS ALONG WITH MANY OTHER SCOPE ELEMENTS NEEDED TO SUPPORT THE PROGRAM
  • STAFF WILL BE RETURNING TO COMMISSION Q 1 2022 FOR CONSTRUCTION AUTHORIZATION FOR THE FIRST DESIGN PACKAGE
  • AND I DID ALSO WANT TO HIGHLIGHT WE MENTIONED IT A COUPLE OF TIMES, BUT THE MII VOTE THE AIRLINE SUPPORTED WITH A PASSING BOAT LAST WEEK FOR 133,000,000 DOLLARS OF SUPPORTING THE PROGRAM
  • SO THAT WAS A BIG WIN THE MILESTONE
  • SO I TALKED TO THIS IN THE LAST PRESENTATION, ACOUSTIC TESTING AND OUTREACH SCHEDULE FOR Q 4 2021 TO BE COMPLETED IN Q 4 2023
  • AND THAT'S REALLY FOR THE TEAM TO FINISH UP AND CONDUCT ALL THE OUTREACH, ALL THE TESTING FOR THE APARTMENT COMPLEXES PARTICIPATING THE PROGRAM
  • AND THEN WE'LL MOVE ON TO THE DESIGN AND PERMITTING THOSE PACKAGES
  • I PLAN ON COMPLETING Q 3 20, 25, AND THAT WILL BE DESIGNED AND PERMITTING SEVERAL PACKAGES THROUGHOUT THE ENTIRE PROGRAM DURATION, ALONG WITH CONSTRUCTION ANTICIPATED TO BEGIN CONSTRUCTION Q 3 2022 THROUGHOUT PROGRAM COMPLETION NO LATER THAN Q 4 2026
  • AND AS I MENTIONED, I'M GOING TO DO EVERYTHING WE CAN TO ACCELERATE THAT DATE, JUST LIKE DESIGN AND PERMITTING
  • THE CONSTRUCTION IS GOING TO HAVE SEVERAL SEPARATE MAJOR WORK CONSTRUCTION PACKAGES THROUGHOUT THE PROJECT
  • AND WE'LL BE WORKING CLOSELY WITH OUR PROGRAM MANAGEMENT CONSULTANT TO IDENTIFY ANY POTENTIAL ACCELERATION OPPORTUNITIES AS WE CONTINUE TO GO OUT THROUGHOUT THE WHOLE PROGRAM
  • NEXT SLIDE, PLEASE
  • NEXT SLIDE, PLEASE
  • I MISSED THAT ONE
  • SORRY
  • AND THIS NOISE BOUNDARY MAP HIGHLIGHTS 18 APARTMENT COMPLEXES SHOWN IN RED
  • THESE ARE ALL THE POTENTIALLY ELIGIBLE APARTMENT COMPLEXES TO PARTICIPATE IN THE SOUND INSTALLATION PROGRAM
  • SO, ESSENTIALLY, IF ALL 18 APARTMENT COMPLEXES ARE ELIGIBLE AND PARTICIPATE IN THE PROGRAM, THIS WILL CERTAINLY REPRESENT A SIGNIFICANT UNDERTAKING FOR THE PROGRAM TODAY
  • I'M ASKING FOR YOUR SUPPORT AGAIN, ONE STEP CLOSER TO BEING ABLE TO PROVIDE SOUND INSTALLATION TO THE IMPACTED RESIDENTS WITHIN OUR SURROUNDING COMMUNITY
  • MY TEAM IS COMMITTED TO GETTING THIS DONE AS QUICKLY AND SAFELY AS POSSIBLE
  • SO, AS I'VE ALREADY HEARD, YOU'VE ALREADY SUPPORTED THE PROGRAM, SO I REALLY APPRECIATE THAT
  • FANTASTIC
  • CLERK HART, DO YOU WANT TO I SEE
  • COMMISSIONER STEINBRUECK, YOU HAVE A QUESTION? YEAH
  • I THINK WE'VE TALKED ABOUT THIS BEFORE, BUT IT STRIKES ME THAT PRIORITIZING THE APARTMENT BUILDINGS WHERE A LOT MORE PEOPLE LIVE AND IN CLOSER PROXIMITY OUGHT TO BE A CONSIDERATION
  • THERE'S ALSO ECONOMIES OF SCALE WITH REGARD TO THE LARGER BUILDINGS, I THINK, AND MORE WORK TO SET UP AND BREAK DOWN AND ALL OF THOSE THINGS
  • BUT IT JUST SEEMS TO ME MORE PEOPLE CAN BENEFIT FASTER IF WE PRIORITIZE THE 18 APARTMENT BUILDINGS
  • YES
  • JULIE MIGHT BE ABLE TO SPEAK A LITTLE BIT TO YOU HOW WE'RE PRIORITIZING TO WORK HERE
  • OKAY
  • THAT'S MY QUESTION
  • WE ARE ACTUALLY WORKING WITH THE OFFICE OF DIVERSITY AND EQUITY DIVERSITY AND INCLUSION ON CREATING A GIS MAP, AND THAT'S GOING TO DO SOME OVERLAYS WITH
  • WELL, I'LL LET JULIE EXPLAIN IT A LITTLE BIT
  • AND TO THAT POINT, THESE ARE RENTERS AS OPPOSED TO HOMEOWNERS
  • PROBABLY YOU CAN BE ALL THE APARTMENTS
  • AND SO THE LIKELIHOOD IS THAT THERE MAY BE MORE LOW INCOME HOMEOWNERS
  • I MEAN, RENTERS UNDER THE EQUITY INDEX MEASUREMENTS
  • THAT, AGAIN, OFFER ANOTHER REASON, IF YOU WILL, FOR PRIORITIZATION
  • ABSOLUTELY TRUE
  • YOU WANT TO GIVE A LITTLE OVERVIEW ON WHAT WE'RE PLANNING TO DO HERE? I CAN
  • AND WHAT I WOULD SHARE IS WE HAVE ACTUALLY BEEN WORKING WITH THE OFFICE OF EQUITY DIVERSITY INCLUSION WITH THE EQUITY INDEX THAT YOU SPOKE OF
  • WE SPECIFICALLY DIDN'T SPEAK TO IT IN OUR PRESENTATION BECAUSE WE KNOW THEY ARE COMING TO COMMISSION IN SEPTEMBER, AND SO WE CERTAINLY DON'T WANT TO STEP ON THEIR MESSAGE
  • IT IS A WONDERFUL TOOL
  • WE HAVE USED IT TO BE INCORPORATED IN OUR PROCESSES SO THAT WE ARE DESIGNING WITH EQUITY
  • YEAH
  • AND JUST TO FINISH ON THAT POINT, AS I SAID, BESIDES EQUITY AS A DRIVER HERE, IT'S THE POINT THAT I WAS TRYING TO MAKE IS THAT APARTMENT BUILDINGS OFFER ONE WAY TO ACCELERATE THE BENEFITS FOR MORE PEOPLE
  • BECAUSE OF THE SIMPLE FACT THAT THEY'RE HIGHER DENSITY
  • A SINGLE APARTMENT PROJECT MAY ENCOMPASS A FAIR NUMBER MORE PEOPLE THAN A SINGLE FAMILY RESIDENCE
  • AND IT'S NOT EITHER OR IT'S ABOUT HOW WE PRIORITIZE
  • THANK YOU, COMMISSIONER STEINBRUECK
  • I DO SEE COMMISSIONER BOWMAN HAND UP AS WELL
  • GREAT
  • THANK YOU
  • WHO DOES THE PERMITTING? IS IT KING COUNTY? AND CAN YOU IDENTIFY ANY EFFICIENCIES THAT COULD ACCELERATE THE PERMITTING PROCESS? THE PERMITTING WILL BE WITH THE LOCAL CITIES THE CITY OF DES MOINES AND BURIEN
  • OKAY, SEATAC
  • SO THEY'LL BE THE LOCAL PERMITTING AGENT
  • AND OUR CONSULTANT HAS SOME CONTACTS AND THEY'RE WELL VERSED AND PERMITTING WITHIN THESE CITIES
  • SO I ANTICIPATE PERMITTING GOING FAIRLY WELL FOR THESE TYPES OF PROJECTS
  • OKAY
  • BUT YOU'LL LET US KNOW IF THE STAFF WILL LET US KNOW IF YOU'VE IDENTIFIED ANY HICCUPS LOAD BLOCKS
  • IT'S TAKING A LITTLE BIT LONGER
  • IS THERE SOMETHING THAT WE CAN DO TO HELP ACCELERATE WITHIN THOSE CITIES? WE KNOW THAT A LOT OF THE CITIES HAVE A LOT OF STRAINS ON THEIR STAFF ALREADY
  • AND SO IF THERE'S ANYTHING THAT WE CAN DO, THERE'S A PROGRAM THROUGH THE ARMY CORPS OF ENGINEERS
  • MANY YEARS AGO, THE PORT TOOK ADVANTAGE OF PROVIDING STAFF TO BE ABLE TO GET CORE PERMITS THROUGH
  • I'M NOT SUGGESTING WE NECESSARILY DO THAT WITHIN THE CITY DES MOINES, FOR EXAMPLE
  • BUT IF YOU'VE IDENTIFIED ANYTHING WITHIN THE CITIES THAT WE COULD HELP ACCELERATE THIS, THAT WOULD BE GREAT TO KNOW
  • ABSOLUTELY, COMMISSIONER
  • WE WILL CERTAINLY KEEP YOU AWARE IF WE RUN INTO ANY SORT OF ROADBLOCKS WITHIN THE LOCAL GOVERNMENTS
  • AS OF RIGHT NOW, I KNOW WE HAVE A PRETTY GOOD WORKING RELATIONSHIP, JUST BASED ON SINGLE FAMILY HOMES AND SOME OF THE CONDO WORK THAT WE'VE DONE, BUT YES
  • ABSOLUTELY
  • ALRIGHT
  • THANK YOU
  • THANK YOU
  • COMMISSIONER BOWMAN
  • MR COMMISSION PRESIDENT
  • I DON'T SEE ANY OTHER HANDS RAISED FOR QUESTIONS
  • YOU'RE ON MUTE, SIR
  • I DIDN'T DO IT RIGHT
  • I'M GLAD YOU JUST FOCUS ON COMMISSIONER STEINBRUECK FOR THAT PURPOSE, BUT SORRY
  • I BELIEVE WE NEED A MOTION THEN TO CONCLUDE TODAY'S MEETING
  • I ALREADY MADE IT
  • FRED AND PETER
  • I CAN DO IT
  • AND WE ALREADY HAVE A SECOND
  • BRILLIANT
  • SO, HER CART, WOULD YOU PLEASE CALL THE ROLL? THANK YOU
  • THIS IS FOR THE VOTE ON THE ADOPTION OF ITEM 10 D, BEGINNING WITH COMMISSIONER BOWMAN
  • AYE
  • THANK YOU, COMMISSIONER CALKINS
  • AYE
  • THANK YOU, COMMISSIONER CHO
  • AYE
  • THANK YOU, COMMISSIONER STEINBRUECK
  • COMMISSIONER STEINBRUECK, YOU'RE MUTED, SIR
  • I DID NOT DO IT
  • HERE WE GO
  • I'M JUST TRYING TO DO MY PART
  • YES, OF COURSE
  • THANK YOU, COMMISSIONER FELLEMAN, AYE
  • THANK YOU
  • YOU HAVE FIVE YESSES AND ZERO NOS FOR THIS ITEM
  • THAT MEANS THE MOTION PASSES UNANIMOUSLY
  • THANK YOU SO MUCH
  • GOD SPEED, FAIR WINDS
  • LET'S SAY THIS IS THERE'S A ROUTE OF APPLAUSE OF GREAT WORK OF OUR STAFF
  • THANK YOU VERY MUCH, COMMISSIONER
  • ALRIGHT THEN
  • WELL, THAT DOES CONCLUDE TODAY'S BUSINESS ITEMS IF WE CAN GO THROUGH A COMMISSIONER EXECUTIVE METRUCK, DO YOU WANT TO MAKE ANY CONCLUDING COMMENTS ABOUT THAT PRESENTATION OR ANY ANNOUNCEMENTS THAT WE SHOULD BE AWARE OF? NO
  • COMMISSIONERS, THANKS FOR YOUR APPROVAL OF THAT AUTHORIZATION SO WE CAN GET GOING ON THAT
  • AND SHE SAID THE APARTMENT PROGRAM IS A BIG PART OF THAT EFFORT
  • BUT I HEAR YOUR FEEDBACK ON LOOKING FOR WAYS
  • ARE THERE ANY OTHER WAYS TO HAVE EFFICIENCIES IN THE PROGRAM? I HEAR THAT TOO
  • AND I WANT TO THANK COMMISSIONER BOWMAN FOR BRINGING THIS UP TOO
  • AND THERE'S SUPPORT AND ALL THE COMMISSIONERS SUPPORT IN THESE EFFORTS
  • EXCELLENT
  • CLERK HART, COULD YOU ASK THE COMMISSIONERS FOR ANY FINAL COMMENTS? FINAL COMMENTS THAN ANY REFERRALS TO COMMITTEES, COMMISSIONER BOWMAN NO FINAL COMMENTS
  • THANK YOU
  • THANK YOU, COMMISSIONER CALKINS, I DO HAVE A COMMENT AND POTENTIAL REFERRAL TO COMMITTEE
  • MONDAYS IPCC REPORT, I THINK, HAS US ALL REEVALUATING THE PACE AT WHICH WE'RE ATTEMPTING TO ADDRESS CLIMATE CHANGE AND OUR PUBLIC COMMENTS TODAY REFLECT OUR COMMUNITIES CONCERN WITH THE STATUS QUO
  • AND WE HAVE AS A PORT, BEEN INNOVATIVE IN CLIMATE ACTION WITH RESPECT TO OUR PEERS
  • BUT EVEN BEING AT THE FOREFRONT AMONGST PORTS ISN'T ENOUGH
  • AND SO AS WE LOOK AT NEAR THE PORT INTERSECTS WITH CLIMATE CHANGING ELEMENTS OF OUR ECONOMY
  • WE HAVE BOTH A RESPONSIBILITY AND AN OPPORTUNITY TO DO THINGS THAT OTHER AGENCIES CAN'T
  • AND I'M REMINDED OF OUR CLEAN TRUCK PROGRAM THAT WE WERE ABLE TO SUCCESSFULLY ROLL OUT FROM 2008 TO INITIALLY 2018 AND THEN IT WAS EXTENDED A YEAR TO 2019 TO FINALIZE
  • AND THE ELEMENTS OF THAT PROGRAM THAT I THINK WERE EFFECTIVE WERE A WILLINGNESS TO PROVIDE THE INDUSTRY IS INVOLVED WITH CLARITY ABOUT WHAT THE END GOAL WAS WITH A TIMELINE THAT WAS CHALLENGING, BUT ACHIEVABLE
  • AND TO BE CLEAR, WHEN IT WAS INITIALLY PASSED, THERE WERE MANY FOLKS SAYING IT WAS NOT ACHIEVABLE AND IT RESULTED IN DRAMATIC DECREASES IN LOCAL AIR POLLUTION AND GOOD GAINS IN GREENHOUSE GAS EMISSIONS REDUCTIONS AS WELL
  • SO WHEN WE LOOK AT THAT MODEL AND THINK ABOUT HOW WE MIGHT APPLY IT TO OTHER AREAS OF SIGNIFICANT CONCERN, I'M PARTICULARLY INTRIGUED TO LEARN HOW WE MIGHT USE A SIMILAR MODEL WITH THE CRUISE INDUSTRY TO SAY WHAT IS A REASONABLE TIMELINE BY WHICH WE COULD EXPECT TO SEE THE INTRODUCTION OF ZERO EMISSIONS CRUISE VESSELS AND EVENTUALLY THE THE PROHIBITION OF ANYTHING BUT ZERO EMISSIONS CRUISE VESSELS
  • AND THAT MAY STRIKE SOME AS BEING BLUE SKY DAYDREAMING
  • BUT AS WE'VE HEARD, WE DON'T HAVE A MOMENT TO LOSE
  • AND SO MY SUGGESTION IS THAT OUR NEWLY NAMED SUSTAINABILITY, ENVIRONMENT AND CLIMATE COMMITTEE PUT TOGETHER A REQUEST THAT WE SEND TO EXECUTIVE DIRECTOR METRUCK AND STAFF, OBVIOUSLY LED BY SANDRA KILROY AND OTHERS, TO COME BACK TO US WITH A TIMELINE
  • AND I THINK IT'S THE LEAST WE CAN DO TO BE RESPONSIVE TO THE INCREASING COURSE OF VOICES AROUND THIS ISSUE AND TO ADDRESS WHAT IS CLEARLY THE CRISIS FOR OUR TIMES
  • HOW ARE WE AS AN AGENCY GOING TO ADDRESS CLIMATE CHANGE? SO THAT'S MY PROPOSAL
  • I DON'T KNOW IF THAT REQUIRES A SECOND OR IF THE CO CHAIRS OF THE SEAC COMMITTEE CAN JUST TAKE THAT AS THEIR WORK PLAN IF THEY SO CHOOSE, BUT THAT WOULD BE MY REQUEST
  • I'LL JUST RESPOND
  • WELL, I THINK WE'LL NEED TO HAVE ADDITIONAL DISCUSSION HERE AND INCLUDE STAFF ON THIS, BUT I'M VERY INTERESTED IN SEEING WAYS WE CAN ACCELERATE OUR EFFORTS
  • I KNOW THERE ARE MAJOR CHALLENGES WITH REGARD TO INFRASTRUCTURE AT THE SEAPORT AND THE COST OF THAT, AND WE'RE IN IT TOGETHER WITH THE ALLIANCE
  • I HAVE NEVER BEEN COMFORTABLE WITH THE 2050 TARGET DATE FOR FULL CARBON NEUTRALITY AT THE SEAPORT
  • THE REALLY BIG CHALLENGE IS, IS BEYOND OUR OWN INFRASTRUCTURE, WHERE WE'RE MAKING GREAT STRIDES
  • IT'S WITH A SCOPE THREE EMISSIONS THAT BEYOND OUR DIRECT CONTROL, WHETHER IT BE AVIATION OR MARITIME
  • IT'S LIKE THE CITY OF SEATTLE CAN CONTROL THE AMOUNT OF DRIVING THAT PEOPLE DO, AND IT'S DRIVEN BY CONSUMERS AND CONSUMER DEMAND AND DEMAND FOR TRAVEL, AIR TRAVEL
  • BUT WE CAN ACCELERATE
  • I THINK WE CAN COMMIT TO TRANSITIONING BOTH OUR TRANSPORTATION FACILITIES AT THE PORT AS WELL AS OUR BUILDINGS, AS I HAVE SOUGHT TO DO WITH REGARD TO TRANSITIONING TO CLEAN ENERGY FOR ALL OF OUR PORT FACILITIES, AND THAT WORK IS UNDERWAY
  • SO LET'S HAVE FURTHER DISCUSSION, AND PERHAPS WE COULD INVITE COMMISSIONER CALKINS TO JOIN US AT MAYBE THE NEXT ENS COMMITTEE
  • I SEE
  • I'M SORRY
  • THE NEXT C COMMITTEE COMMITTEE
  • MR COMMISSIONER
  • PRESIDENT, I JUST WANTED TO GET SOME CLARITY
  • THERE IS COMMISSIONER CALKINS REQUESTING A FORMAL MOTION TO REFER TO COMMITTEE BECAUSE THAT IS A FORMAL MOTION
  • COMMISSIONER CALKINS, IT SOUNDS TO ME LIKE OKAY, RIGHT
  • COMMISSION
  • COMMISSIONER CALKINS, ARE YOU ASKING FOR? I KNOW WE'RE ALL SORT OF NEW TO THESE PROTOCOLS, AND THAT IS WHAT I'M REQUESTING
  • I'M SEEKING A SECOND TO TAKE THIS IDEA TO THE SUSTAINABILITY, ENVIRONMENT AND CLIMATE COMMITTEE FOR CONSIDERATION AS A POTENTIAL WAY FORWARD AND AND BEING ABLE TO USE THE RESOURCES OF OUR COMMITTEE STRUCTURE TO INVESTIGATE THIS FURTHER
  • NO COMMITMENT TO DO IT, BUT TO LEARN MORE TO SOLICIT STAFF INPUT
  • AND THEN IF THE COMMITTEE SO CHOOSES TO, THEN EITHER SEND IT TO EXECUTIVE DIRECTOR METRUCK FOR ACTION OR BACK TO THE FULL COMMISSION TRACTION
  • SO JUST FOR CLARITY, YOU ARE TALKING ABOUT A ZERO EMISSION CRUISE SHIP
  • PRECISELY
  • I'M TALKING ABOUT HOW DO WE LEAD THE WORLD AS A CRUISE TERMINAL IN ADVANCING SOME OF THESE ZERO EMMISSION FUELS TECHNOLOGIES THAT ARE BEING ADOPTED IN OTHER AREAS OF MARITIME, BUT SO FAR, WE'VE NOT SEEN A WHOLE LOT OF HEADWAY WITH CRUISE
  • WELL, I FIND THAT TO BE A LITTLE FANTASTIC
  • WELL, I APPRECIATE YOUR CONCERNS ABOUT IT, WHICH IS PRECISELY WHY IT OUGHT TO BE CONSIDERED IN COMMITTEE
  • THIS IS THE IDEA
  • I WOULD MOTION
  • I WOULD OFFER AN ALTERNATIVE MOTION REQUESTING COMMISSIONER CALKINS PRESENCE AT THE NEXT AVAILABLE SEAC COMMITTEE MEETING TO DISCUSS WAYS IN WHICH WE CAN ACCELERATE OUR EFFORTS TO GO TO ZERO IN THE MARITIME, INCLUDING CRUISE
  • WHAT DOES THAT REQUIRE? MOTION? I DON'T THINK IT DOES
  • BUT SINCE COMMISSIONER CALKINS SEEKING TO MAKE A MOTION FOR THAT PURPOSE, I THINK THERE'S A LOT OF COMPLEXITY, A DISCUSSION THAT NEEDS TO BE TAKEN UP
  • THE STAFF HAS TO BE CLEAR
  • I AM TRYING TO SHIELD STAFF FROM UNNECESSARY WORK
  • THAT IS THE POINT OF DOING IT IN THIS MANNER, RATHER THAN SIMPLY TELLING STEVE GO DO THIS
  • MY GOAL IS TO HAVE IT DONE IN COMMITTEE, AND THEN IF THERE IS MERIT TO IT, THEN IT GOES TO STEVE FOR CONSIDERATION AS A STAFF ACTION
  • BUT AT THIS POINT, I BELIEVE THAT I'M TRYING TO DO THE RIGHT THING HERE IN KEEPING IT WITHIN THE COMMISSION WORK BEFORE WE SEND IT TO STAFF SO THAT IT IS VETTED FOR FEASIBILITY AND ATTAINABILITY BEFORE WE SEND IT TO STAFF
  • THE STAFF THE MEETING
  • SO, SANDY, YOU TELL US SOMETHING, SANDY, WHAT DO YOU THINK? WELL, FIRST OF ALL, THANK YOU FOR RAISING THIS
  • AND CERTAINLY THE PORT COMMISSION AND ALL OF YOU HAVE SET A VERY STRONG VISION FOR THE PORT OF SEATTLE AND BEING A LEADER IN THIS WORK
  • SO WE CERTAINLY APPRECIATE THE CONTINUATION OF THAT
  • JUST A FEW THINGS
  • YOU DID ADOPT THE NORTHWEST PORTS CLEAN AIR STRATEGY THAT DID SET A ZERO EMISSION GOALS, INCLUDING FOR SCOPE THREE, WHICH WOULD INCLUDE SHIFTS
  • SO WE HAVE SOME CONSTRUCT UNDER WAY TO DO THAT
  • ADDITIONALLY, THERE ARE PORTS AND BUSINESSES GLOBALLY WHO ARE STARTING TO RESEARCH THE CONCEPT OF ZERO MISSION SHIPS
  • SO THAT IS HAPPENING
  • AND WE DO HAVE STAFF THAT HAVE STARTED TO CONNECT IN IN THE INTERNATIONAL VENUES THROUGH IAP AND THE GREEN PORT CONGRESS AND OTHER WAYS TO TRACK THIS
  • I WOULD ALSO SAY THAT EXECUTIVE DIRECTOR HAS BEEN A STRONG ADVOCATE OF US ENGAGING AT THE THE INTERNATIONAL LEVEL WITH THE INTERNATIONAL MARITIME ORGANIZATION ON HOW WE CAN HELP PUSH QUICKER LOOK INTO ALTERNATIVE FUELS AND HIGHER STANDARDS AND ALTERNATIVE SHIPS
  • SO I THINK YOU'LL SEE SOME OF THIS MOVING FORWARD AND KIND OF A GROWING FOCUS ON HOW WE AS A PORT CAN HELP WORK WITH OTHER PORTS TO MOVE OUR SCOPE THREE EMISSIONS
  • BUT HAPPY TO CERTAINLY WORK WITH THE COMMISSIONERS, WITH THE COMMITTEE AND WITH THE EXECUTIVE DIRECTOR METRUCK ON RESPONDING TO YOUR INTEREST TO MOVE FASTER
  • I'M SORRY, MR COMMISSION PRESIDENT, I DO SEE DIRECTOR JOHN STEVENS AND ALSO EXECUTIVE REGARDS TO THAT TRICK
  • I SAID EXECUTIVE METRUCK, PLEASE
  • THANKS, COMMISSIONERS, AND BRING THIS UP
  • OBVIOUSLY, THIS IS SOMETHING WE'VE BEEN DISCUSSING AND SANDY DID A NICE JOB OF KIND OF CAPTURING OUR THOUGHTS ABOUT THIS, BUT WE'LL BE GLAD TO DISCUSS THIS FURTHER AT THE SEAC COMMITTEE OF THAT WAY FORWARD AND PARTICULARLY WITH THE EFFORTS THAT WE HAVE UNDERWAY
  • BUT THE DECARBONIZATION OF THE MARITIME INDUSTRY FROM TRANSOCEANIC VESSELS TO LOCAL VESSELS TO FERRIES AND ALL OF THOSE, IT'S A VERY COMPLEX SYSTEM TO DO THAT
  • BUT WE LOOK FORWARD TO DISCUSSING WHAT IS THE ART OF THE POSSIBLE WITHIN THAT FRAMEWORK IN OUR CONTRIBUTION IN OUR INVOLVEMENT IN IT
  • STEPHANIE, I HADN'T RAISED MY HAND
  • I WAS JUST OBVIOUSLY KEENLY INTERESTED IN THIS AND CERTAINLY SHARE THE INTEREST IN IT AS I LOOK AT BUDGETING FOR NEXT YEAR OF ACTUALLY INCLUDED STAFF WORK TOWARDS THESE BOTH RESEARCH AND ADVOCACY EFFORTS
  • BUT OF COURSE WE KNOW IT IS
  • YOU KNOW, THERE'S A LONG ROAD MAP TO GET THERE, SO LOOK FORWARD TO TALKING ABOUT IT MORE AT THE SEAC COMMITTEE AND IT'S NOT SOMETHING STAFF HAS NOT BEEN THINKING ABOUT
  • ALRIGHT, AND I DO APPRECIATE THAT
  • AND MARITIME BLUE IS PARTICULARLY FOCUSED ON AND STEVE NOW SERVES ON MARITIME BLUE
  • THE DECARBONIZATION OF SHIPPING HAS BEEN A KEY FOCUS
  • I DO WANT TO NOTE THAT THE ENS COMMITTEE'S TITLE WAS A LOT EASIER TO SAY JUST BEFORE TODAY
  • IT'S JUST TWO ENS
  • THAT'S A LOT EASIER TO SAY THAN SEAC OR WHATEVER, BUT THAT'S JUST A POINT OF ORDER THERE
  • BUT THE OTHER ISSUE IS THAT THIS IS NICE TO ALWAYS LOOK DOWN THE ROAD, BUT WE HAD TWO TESTIMONIES TODAY ABOUT A VERY TANGIBLE ISSUE ASSOCIATED WITH CRUISE SHIPS
  • AND SO I WOULD LIKE US TO FOCUS ON WHAT'S IMMEDIATELY IN FRONT OF US AND NOT MISS THE OPPORTUNITY
  • AND THE QUESTION OF BURNING LOW SULFUR FUELS VERSUS SCRUBBING AND VERSUS WHAT WE DO WITH THE DOCK VERSUS WHAT WE DO THROUGHOUT WASHINGTON WATERS
  • WHAT IS THIS IS RIGHT BEFORE US
  • THIS IS COMPLETELY VIABLE TODAY, AND THIS HAS BEEN A SUBJECT THAT THE TWO FOLKS WHO TESTIFIED POINTED OUT THEY PARTICIPATED IN THE MLU PROCESS
  • IT'S ONCE EVERY THREE YEARS THE PUBLIC GETS TO PARTICIPATE IN THIS AND THERE HASN'T BEEN A RESOLUTION OF IT
  • I KNOW, STEPHANIE, YOU'VE BEEN VERY MUCH FOCUSED ON THIS, BUT I WOULD LIKE TO HAVE SOMETHING VERY TANGIBLE BEFORE US RESOLVED AND WE CONTINUE TO LOOK DOWN THE ROAD
  • OKAY
  • ALRIGHT
  • I DON'T KNOW
  • DO WE HAVE A SENSE, STEPHANIE, WHEN THE QUESTION OF WHAT THE CONCLUSION OF THE MLU PROCESS WILL BE, DO WE HAVE A TIME FRAME? SO THERE IS A PUBLIC MEETING SCHEDULED ON AUGUST 24 FOR THE CONCLUSION OF THIS ROUND OF THE MLU FOR CONCLUSION OF THIS ROUND OF THE MLU AS WELL
  • BUT I WOULD JUST REMIND COMMISSIONERS THAT AS WE HEARD FROM OUR COMMENT TOURS SINCE JUST PRIOR TO THIS CRUISE SEASON WAS WHEN WELL, THIS CRUISE SEASON WAS WHEN OUR BAN ON SCRUBBER DISCHARGE AND OUR BERTHS WENT INTO EFFECT
  • SO WE HAVE NOW HAD THAT NEW POLICY WE'VE SEEN ABOUT MAYBE 10 SHIPS GO THROUGH THAT NOW DURING PASSENGER OPERATION
  • SO WE ACTUALLY HAVE ADOPTED A NEW POLICY REGARDING SCRUBBER DISCHARGE OR EXHAUST GAS CLEANING SYSTEM DISCHARGE THAT WE ARE NOW OBSERVING HOW THAT WORKS
  • SO WE ACTUALLY HAVE MADE PROGRESS, AND THAT DID RESULT OUT OF THE MLU PROCESS A COUPLE YEARS AGO
  • THAT IS NOT HOW WE IMPLEMENTED IT, BUT THAT IS INDEED WHERE THE CONCEPT AND THINKING ABOUT IT DID INITIATE
  • I DO APPRECIATE THE FACT THAT YOU HAVE ALWAYS KEPT THE FOCUS ON THE CONTINUED IMPROVEMENT OF ART
  • AND I CONTINUE TO ASSERT THAT IF YOU'RE GOING TO TAKE A CRUISE, THE PORT OF SEATTLE IS THE BEST HOME PORT FOR DOING THAT, AND IT'S BECAUSE OF THE WORK AND COMMITMENT YOU CONTINUE TO SHOW
  • AT THE SAME TIME, I WAS WATCHING THE OVATION OF THE SEAS SITTING AN ANCHOR IN THE MIDDLE OF LEA, CLEARLY RUNNING ITS SCRUBBERS
  • AND WHETHER OR NOT, BECAUSE IT'S NOT AT THE DOCK, WHETHER OR NOT THEY'RE ALLOWED TO DO DISCHARGE, OBVIOUSLY, IT'S AT THEIR DISCRETION
  • SO IT'S REALLY ESPECIALLY WHEN WE HAVE SO MANY SHIPS ON THE HOOK RIGHT NOW, IT'S A GOOD ISSUE TO HAVE CLARIFIED
  • I DID NOT MEAN TO NEGATE THE FACT THAT WE CONTINUE TO DO WHAT WE DIRECTLY HAVE CONTROL OVER, BUT ECOLOGY AND THE PORT AND THE CRUISE LINES COMPRISE THE MLU GROUP
  • AND I JUST WOULD LIKE TO SEE THAT COME TO A CONCLUSION
  • AND NOW I KNOW AUGUST 24 TH IS THE DATE
  • SO THANK YOU FOR THAT, MR COMMISSION PRESIDENT
  • BEFORE WE CONTINUE, I JUST WANT TO REMIND THE COMMISSIONER CALKINS HAS A MISSION ON THE FLOOR, SO IT SOUNDS LIKE WE HAVE A PATH FORWARD
  • COMMISSIONERS STEINBRUECK AND BOWMAN WILL INCLUDE ON THE AGENDA AT AN UPCOMING SEAC MEETING, MY PROPOSED DISCUSSION POINT, AND I WILL ATTEND THAT MEETING, AND WE CAN DELVE INTO MORE DETAILS WITH SANDY AND HER TEAM, POTENTIALLY STEPHANIE JONES-STEBBENS, AS WELL, TO GET DEEPER INTO THIS
  • BUT I DO WANT US TO ACTIVELY BE THINKING NOT JUST ABOUT WHAT OUR GOALS FOR THE NEXT YEAR OR TWO YEARS, BUT ALSO OUR GOALS FOR THE NEXT 20 AND 30 YEARS TO ENSURE THAT WE'RE RESPONSIVE TO THESE CONCERNS
  • AND I DON'T THINK IT'S TO PIE IN THE SKY THINKING TO BE TALKING ABOUT WHAT WOULD THAT LOOK LIKE AND HOW DO WE GET THERE? AND THAT'S WHY I DIDN'T PROPOSE A DATE
  • I WANT EXPERTS TO COME BACK AND TELL US IF WE'RE ASPIRATIONAL WHAT WOULD THAT LOOK LIKE? IS THAT 15 YEARS FROM NOW, 30 YEARS FROM NOW? AND WHAT OBSTACLES HAVE WE CREATED THAT WE COULD GET OUT OF THE WAY OR WHAT SIGNALS CAN WE SEND TO THE CRUISE INDUSTRY, MUCH LIKE THE STATE OF CALIFORNIA DID WITH THE AUTO INDUSTRY, AS WE ARE THE CALIFORNIA OF CRUISE IN THE UNITED STATES
  • AND SO IF WE INSIST UPON SOMETHING AND PROVIDE THE TIMELINE, REASONABLE TIMELINE TO GET THERE, I THINK WE COULD HAVE THAT KIND OF INFLUENCE
  • OKAY
  • COMMISSIONS
  • I DID WANT TO NOTE THAT YOU SHOULD PROBABLY HAVE FOR THAT MEETING THE DETAILS ON THE HURTIGRUTEN NEW FLEET THAT THEY ARE RUNNING HYBRID CRUISE SHIPS AND ACTUALLY BURNING FISH OIL IN THEIR BIO PLANTS
  • SO I THINK THE BEST CRUISE SHIP YOU'LL PROBABLY FIND RIGHT NOW IS RUN BY HURTIGRUTEN
  • AND JUST A POINT OF CLARIFICATION, FLORIDA AND MIAMI ARE ARE THE GROUND ZERO FOR CRUISE IN THIS COUNTRY
  • BUT COMMISSIONER STEINBRUECK, ARE WE STILL I WOULD PREFER WE FOCUS ON ATTENTION ON NOT JUST CRUISE
  • I DON'T KNOW WHY WE'RE SINGLING CRUISE OUT WHEN OUR INTEREST IS IN LOOKING AT DECARBONIZATION AND SHIPPING AND THAT INCLUDES CRUISE
  • AND IT'S ABOUT, I THINK COMMISSIONER CALKINS INTERESTS, WHICH I SUPPORT I SHARE IS IN EMERGING NEW TECHNOLOGIES THAT COULD LEAD US DOWN IN THE DIRECTION OF TRANSITIONING TO CLEAN ENERGIES IN THE MARITIME AND IN AVIATION
  • WE'VE PUT TREMENDOUS RESOURCE INTO SAF, WHICH, AS WE KNOW, ISN'T THE END ALL OR THE ANSWER SOLELY
  • THERE ARE OTHER EMERGING TECHNOLOGIES
  • SO WHAT I WOULD ASK STAFF TO DO, AND I WOULD ALSO ASK MY CO CHAIR FOR INTEREST AND SUPPORT AND IDENTIFICATION OF EMERGING TECHNOLOGIES THAT COULD TRANSITION OUR INDUSTRIES, NOT JUST CRUISE, BUT SHIPS AND PLANES TO NEW CARBONLESS ENERGY
  • AND THERE ARE EMERGING TECHNOLOGIES
  • I DON'T KNOW VERY MUCH ABOUT THEM, BUT I DON'T SEE THE POINT IN JUST SINGLING OUT CRUISE HERE THROUGH THE COMMISSION PRESIDENT TO COMMISSIONER CALKINS
  • COMMISSIONER CALKINS, ARE YOU WITHDRAWING YOUR FORMAL MOTION AT THIS POINT BASED ON THIS CONVERSATION? YEAH, I WILL
  • AND COMMISSIONER STEINBRUECK, I'M LOOKING FORWARD TO THAT CONVERSATION IN COMMITTEE
  • THANK YOU
  • OKAY
  • COULD YOU CONTINUE? OH, SANDY, DO YOU STILL MEAN TO HAVE YOUR HEAD UP? YOU GOT TO UNMUTE IF YOU DO THE PORT OF CLARIFICATION ON COMMISSIONER STEINBRUECKS QUESTION, ONE OF THE REASONS WE FOCUS ON CRUISE HERE AT THE PORT OF SEATTLE COMMISSION MEETING IS BECAUSE FOR US, CRUISE IS THE LARGEST PART OF OUR SCOPE
  • THREE EMISSIONS FOR PORT OF SEATTLE
  • THE OTHER SHIPS PORT OF SEATTLE MARITIME
  • I SHOULD SAY THE OTHER SHIPS ARE UNDER THE MANAGEMENT OF THE SEAPORT ALLIANCE
  • OF COURSE, WE WORK VERY CLOSELY WITH THEM, AS YOU KNOW, AND THEY HAVE ADDITIONAL COMMITTEES THAT ARE TAKING UP THIS ISSUE
  • SO THE STAFF WORK VERY CLOSELY ON COLLABORATING
  • BUT THE CRUISE IS WHAT'S THE PORT OF SEATTLE? YEAH, I UNDERSTAND THAT
  • BUT I THINK THE LION SHARE IS PROBABLY NOT CRUISE
  • IT'S PROBABLY CONTAINER CARGO SHIPS
  • AND I DON'T WANT TO BELABOR THIS ANYMORE TODAY, BUT WE'LL FOLLOW UP ON THIS
  • THANKS
  • OKAY
  • I JUST GOT TO ADD TO IT, HER SHIP CRUISES FAR MORE ENERGY INTENT
  • THAT'S THE COMMITTEE
  • LET ME JUST FINISH THE STATEMENT
  • THE OTHER THING IS BECAUSE WE HAVE TARIFF AGREEMENTS AND BERTHING AGREEMENTS WITH CRUISE
  • STEPHANIE HAS BEEN ABLE TO ADVANCE OUR REQUIREMENTS WITH CRUISE IN WAYS THAT AS A LANDLORD PORT, THE PORT ALLIANCE HAS NOT BEEN ABLE TO DO
  • AND THEN THE ONLY OTHER CONSIDERATION WHAT REGARDING RYAN'S COMMENTS ABOUT PHASING IN THE TRUCK ISSUES, WE ALSO HAVE EQUITY CONSIDERATIONS THAT WE'RE GOING TO ASK BUSINESSES TO JUMP TO THE NEXT PHASE
  • WE DELAYED FOR A YEAR SO THAT THE TRUCKERS, WHO ARE SOME OF THE LEAST AFFLUENT PEOPLE IN THE PORT BUSINESS, WE'RE ABLE TO MEET THOSE REQUIREMENTS, SO WE ARE ALWAYS BALANCING THESE CONSIDERATIONS
  • CLERK HART, COULD YOU PLEASE COMPLETE GOING AROUND THE TABLE SO EVERYBODY CAN HAVE THEIR FINAL WORD? YES
  • MOVING TO COMMISSIONER CHO
  • I HAVE NOTHING MORE TO ADD
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • COMMISSIONER STEINBRUECK, ANYTHING THERE? YES, I DO
  • REGARDING ANOTHER STAFF PROMOTION, I'M NOT SURE IF I HEARD DIRECTOR METRUCK MENTIONED THAT OUR VERY OWN DELMAS WHITTAKER, WHO HAS SERVED AS DIRECTOR OF FISHERMAN'S TERMINAL, HAS BEEN PROMOTED TO DIRECTORO OF THE MARINE MAINTENANCE DIVISION
  • I THINK THAT'S A PROMOTION, AND I JUST WANTED TO ACKNOWLEDGE THAT
  • AND CONGRATULATE DIRECTOR WHITAKER
  • YAY
  • THANK YOU
  • COMMISSIONERS STEINBRUECK, MOVING TO COMMISSIONER FELLEMAN FOR FINAL COMMENTS
  • I THINK I'VE SAID QUITE ENOUGH BY NOW, SO THANK YOU SO MUCH FOR ALL OF YOU JOINING US TODAY
  • AND IT WAS A VERY GOOD CONVERSATION TO END ON
  • AND LET US CALL THIS MEETING CLOSED AT 3 17
  • ENJOY THE SUN
  • THANK YOU ALL.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.