Transcript

The Study Session meeting scheduled for 2021-10-12 at Remote

  • THIS IS COMMISSION PRESIDENT FRED FELLEMAN CALLING TO ORDER THE SPECIAL MEETING OF OCTOBER 12, 2021
  • THE TIME NOW IS 832, AND WE'RE MEETING REMOTELY TODAY VIA TEAMS TO COMPLY WITH SENATE CONCURRENT RESOLUTION 8402 AND IN ACCORDANCE WITH GOVERNOR INSLEE PROCLAMATION 2028
  • THIS IS A STUDY SESSION OF THE COMMISSION REGARDING THE 2022 AVIATION DIVISION OPERATING IN CAPITAL BUDGETS
  • PRESENT WITH ME TODAY ARE COMMISSIONERS BOWMAN, CALKINS CHO, AND STEINBRUECK
  • I'LL ASK THAT WE DO A ROLL CALL OF ALL COMMISSIONERS TO ASSURE EVERYONE IS ONLINE
  • CLERK HART, PLEASE CALL THE ROLL
  • THANK YOU
  • BEGINNING WITH COMMISSIONER BOWMAN PRESENT
  • THANK YOU, COMMISSIONER CALKINS HERE
  • THANK YOU, COMMISSIONER CHO PRESENT THANK YOU, COMMISSIONER STEINBRUECK
  • THANK YOU, COMMISSIONER FELLEMAN, PRESENT
  • THANK YOU
  • YOU HAVE ALL COMMISSIONERS AND ATTENDANCE THIS MORNING
  • WELL, THANK YOU, CLERK HART, AND THANK YOU MEMBERS OF THE COMMISSION STAFF AND OUR LISTENING PUBLIC ON TEAMS FOR JOINING US ALL TODAY
  • I'LL ASK ALL PARTICIPANTS TO REMAIN MUTED WHEN NOT SPEAKING TO HELP ALLEVIATE ANY BACKGROUND NOISE DURING THE MEETING
  • WE HAVE A FULL AGENDA THIS MORNING AND HAVE TIME FOR QUESTIONS
  • SO I ASKED THAT WE ALL STAY MINDFUL OF OUR ADJOURNMENT TIME OF 1015
  • WE'LL HAVE ANOTHER MEETING BEGINNING PROMPTLY AT 1030
  • WE CERTAINLY ARE PACKING IT IN FOR ALL OF US AS WE APPROACH THE END OF THE YEAR AND BUDGET DISCUSSIONS ARE CRITICAL
  • COMMISSIONERS ARE ENCOURAGED TO USE THE TEAM'S TOOL FOR HAND RAISING OR THE CHAT BOX WHEN NEEDED
  • ALSO, THIS IS A STUDY SESSION TODAY'S FORMAT DOES NOT PROVIDE FOR PUBLIC COMMENT DURING THE MEETING, HOWEVER, WILL ALWAYS WELCOME WRITTEN COMMENTS AND OF COURSE, MEMBERS OF THE PUBLIC MAY SIGN IN TO ADDRESS THE COMMISSION UNDER THE PUBLIC COMMENT SECTION OF ANY REGULAR MEETING WHICH WILL FOLLOW THIS AT NOON
  • THIS MEETING IS BEING BROADCAST LIVE AND WE'LL BE AVAILABLE AFTER THE MEETING ON DEMAND ON THE PORT WEBSITE
  • OUR PRESENTATION TODAY IS PART OF THE 2022 BUDGET PROCESS BRIEFING
  • OUR TOPIC IS THE AVIATION DIVISION OPERATING AND CAPITAL BUDGETS
  • LET'S HEAR FROM EXECUTIVE DIRECTOR METRUCK TO OPEN OUR DAY AND INTRODUCE OUR PRESENTERS
  • EXECUTIVE METRUCK THANK YOU, PRESIDENT FELLEMAN
  • GOOD MORNING, COMMISSIONERS
  • THANK YOU FOR THIS TIME TODAY FOR A COMPREHENSIVE BRIEFING ON THE PROPOSED 2022 BUDGET FOR SEATTLE TACOMA INTERNATIONAL AIRPORT
  • IN OUR LONG RANGE CAPITAL IMPROVEMENT PLAN FOR AVIATION, SEA IS EMERGING FROM ONE OF THE MOST CHALLENGING EPISODES IN ITS HISTORY
  • THE COVID PANDEMIC WITH ARE EMERGING FROM THE COVID PANDEMIC, WITH A RELATIVELY HEALTHY FINANCIALS ENHANCED BY FEDERAL ASSISTANCE AND POSITIVE FORECASTS FOR TRAVEL GROWTH IN THE COMING YEAR
  • WE CAN CONGRATULATE LANCE LITTLE, MANAGING DIRECTOR OF AVIATION AND EVERYONE AT THE AIRPORT FOR WEATHERING THIS CRISIS AND LOOKING AHEAD TO DELIVERING ITS KEY PRIORITIES FOR THIS CRITICAL GATEWAY
  • YOU WILL HEAR FROM LANCE AND BORGAN ANDERSON, DIRECTOR OF AVIATION FINANCE AND BUDGET, THAT THE REBOUND AND TRAFFIC CAME MORE QUICKLY THAN ANTICIPATED
  • WHERE THIS YEAR WE EXPECT PASSENGER VOLUME TO BE 26% BELOW THE RECORD YEAR OF 2019
  • NEXT YEAR WILL BE JUST 5% BELOW, NOT TO ROB THE PRESENTATION, WE ARE MAKING SOME STRONG PROGRESS ON CAPITAL PROJECTS UNDER CONSTRUCTION DESPITE COVID RELATED DELAYS AND INCREASE COST WILL ALSO BE PLEASED TO HEAR THE AIRPORT IS MAKING PROGRESS TOWARDS ITS COMMUNITY EQUITY AND ENVIRONMENTAL STEWARDSHIP GOALS, INCLUDING REDUCING SKILL ONE AND TWO GREENHOUSE GAS EMISSIONS FREE REPLACEMENT PARTNERED WITH KING COUNTY ON A STUDY LOOKING AT THE CONVERSION OF MUNICIPAL SOLID WASTE TO AIRCRAFT FUELS IN IMPLEMENTING SUSTAINABLE PROJECT FRAMEWORK
  • ALL THIS WORK DOES NOT COME
  • INEXPENSIVELY
  • COSTS ARE GROWING AND YOU'LL SEE MANY OF THE PLAN NEW HIRES WILL BE CONCENTRATED IN SUPPORTING OUR CAPITAL IMPROVEMENT PROJECTS
  • THE NEED TO UPGRADE, MODERNIZED, AND EXPAND SEA TO HANDLE THE CURRENT AND FORECASTED GROWTH IS SIGNIFICANT
  • NEXT YEAR WE'LL FORECAST A HALF A BILLION DOLLARS IN CAPITAL SPENDING OVER THE NEXT FIVE YEARS
  • OUR CAPITAL PLAN WILL TOTAL NEARLY $4 BILLION AND THIS DOES NOT INCLUDE ANY SAMP NEARTERM PROJECT RELATED CONSTRUCTION
  • I'LL NOW TURN IT OVER THE PRESENTATION TO LANCE TO KICK US OFF
  • LANCE, GOOD MORNING
  • THANK YOU
  • EXECUTIVE DIRECTOR, METRUCK AND GOOD MORNING, COMMISSIONERS
  • THANK YOU FOR HAVING US HERE TODAY
  • I THINK SOMEONE IS GOING TO RUN THE SLIDES FOR US TODAY
  • OKAY
  • YES
  • THANKS
  • AS STEVE JUST SAID, THE BUDGET FOR 2021 OR FOR 2022 IS GOING TO LOOK SIGNIFICANTLY DIFFERENT THAN THE ONE FOR 2021 BECAUSE WE'RE EXPECTING TO BE BACK AT ABOUT 95% OF THE WORK PRIOR TO THE TO THE PANDEMIC
  • SO THIS MORNING, COMMISSIONERS AND SEE, WE HAVE A LOT OF MATERIAL TO COVER
  • HOWEVER, WE WANT TO MAKE SURE WE COVER THE INMATE THAT WORKS
  • I WANT TO MAKE SURE WE COVER THE INFORMATION THAT YOU WANT
  • SO WE'LL KIND OF TAKE YOUR QUEUE
  • THERE ARE AREAS THAT WE'RE GOING TO TOUCH ON ON EACH OF THE SLIDES, BUT THEY'LL TAKE YOUR QUEUE IN TERMS OF IF YOU NEED ADDITIONAL DETAILS ON ANY OF THE AREAS, FEEL FREE
  • MORGAN AND I WILL TRY TO ANSWER AS MANY QUESTIONS AS POSSIBLE, BUT I THINK WE HAVE SOME FOLKS ONLINE THAT MAY BE ABLE TO GET INTO SOME OF THE DETAILS I WILL FOCUS MAINLY ON LIKE CABLE WIFE
  • WE'RE GOING TO BE ASKING FOR ALL THESE RESOURCES AS PART OF FOR OPERATING AND CAPITAL BUDGET AND THEN ORGAN, WE'LL GET INTO MORE THAN WHAT WHAT WE'RE ASKING FOR
  • SO NEXT SLIDE, PLEASE
  • SO JUST REAL QUICKLY IN THE PRESENTATION OUTLINE AND COMMISSIONER OF HOME AND I'LL TRY TO MAKE SURE WE KEEP IT IN THE TIME FRAME TO YOU AND THE OTHER COMMISSIONERS HAVE ENOUGH TIME TO ASK SOME QUESTIONS
  • WE'LL JUST TALK AGAIN ABOUT THE PROCESS THAT WE GO THROUGH TO GET TO OUR BUDGET
  • MOST OF YOU HAVE SEEN THIS ALREADY
  • I THINK IT'S ALSO IMPORTANT THAT WE REITERATE HOW EVERYTHING THAT THE ORGANIZATION IS ALIGNED WITH THE OBJECTIVES THAT HAVE BEEN OUTLINED IN THE SAME AGENDA BY THE COMMISSIONERS
  • THING WE DO ON A YEAR TO YOUR BASIS IS ALIGNED WITH THE COMMISSIONERS DIRECTIVE THAT WE'VE BEEN GIVEN
  • OF COURSE, WE DO NOT OPERATE IN A VACUUM
  • THERE IS INTERNAL EXTERNAL FACTORS THAT WE HAVE TO CONSIDER TO LEVERAGE OR EVEN MITIGATE TO GET A STORE GOALS
  • AND WE'LL ALSO JUST REITERATE THE TEN STRATEGIC PRIORITY AREAS THAT WE FOCUS ON
  • AND AS I SAID, AFTER THAT BORGAN, WE'LL GET INTO THE DETAILS OF THE OPERATING ON THE CAPITAL BUDGET
  • THAT'S ALL THE RESOURCES THAT WE'RE ASKING FOR TO GET TO THESE RESOURCES OR TO GET TO THESE OUTCOMES
  • ARE THESE OBJECTIVES NEXT SLIDE, PLEASE
  • SO AGAIN, THIS PYRAMID BASICALLY SHOWS HOW WE ALIGN WITH THE GOALS AND OBJECTIVE THAT THE COMMISSIONERS HAVE ESTABLISHED
  • WE'RE JUST GOING TO FOCUS MAYBE ON JUST GIVE TWO EXAMPLES IN THE TWO OF THEIR GOALS THAT HAVE BEEN ESTABLISHED
  • ONE IS TO ADVANCE THIS REGION AS A LEADING TOWARDS AND DESTINATION AND BUSINESS ENGAGEMENT OF THE OTHER ONE IS TO BE A HIGHLY EFFECTIVE PUBLIC AGENCY
  • WE'RE GOING TO SHOW THE THINGS THAT WE'RE ASKING FOR IN OUR BUDGET ALIGNED WITH AT LEAST TWO OF THESE COURSE THAT'S ESTABLISHING THIS INTERACT AND THE NEXT ONE, SO MANY OF YOU HAVE SEEN THIS
  • THIS IS A PROCESS THAT WE GO THROUGH TO GET TO THE BUDGET
  • ONE OF THE THINGS I'VE ALREADY SAID IS THAT THE BUDGET IS NOT THE END
  • IT'S A MEANS TO AN END, AND THE END IS TO GET US TO THOSE LONG TERM GOALS, TO GET US TO THE CENTRAL AND THE GOALS THAT HAVE BEEN ESTABLISHED BY THE COMMISSION
  • EVERY THREE OR SO A YEAR, WE DO A FULL BLOWN STRATEGIC PLAN
  • BUT EVERY YEAR WE ACTUALLY REVIEW OUR LONG TERM GOALS TO ENSURE THAT WE ARE STILL IN ALIGNMENT
  • AND THOSE ARE THE GOALS WE'RE TRYING TO STILL ESTABLISH
  • WE'RE GOING TO TALK A LITTLE BIT ABOUT THE RESULTS OF OUR SWAT ANALYSIS
  • ONCE WE HAVE DONE AN ESTABLISH THE GOALS, WE DO WHAT'S CALLED A GAP ANALYSIS
  • WE LOOK AT WHERE WE ARE NOW RELATIVE TO WHERE WE'RE TRYING TO GET TO
  • AND THEN WE COME UP WITH STRATEGIC OBJECTIVES IN ORDER TO CLOSE THAT GAP, TO GET US TO THOSE GOALS
  • AND WE WILL HAVE KEY PERFORMANCE INDICATORS THAT WE USE AS OUR MEASURE TO GET US THERE
  • AND YOU'LL SEE SOME OF THESE AS WELL
  • SO ONCE WE HAVE DONE THAT, THAT'S KIND OF A STRATEGIC PLANNING PART OF THE PROCESS TO THE IMPLEMENTATION PART
  • THIS IS WHERE THE RUBBER MEETS THE ROAD
  • WE DEVELOP OUR ANNUAL BUSINESS PLAN
  • THESE ARE THE SPECIFIC THINGS THAT WE DO EVERY YEAR IN ORDER TO GET US TO THE LONG TERM GOALS
  • AND THEN IN ORDER TO EXECUTE THE THINGS IN OUR BUSINESS PLAN, WE ASK FOR RESOURCES
  • WE ASK FOR PEOPLE
  • WE ASK FOR MONEY, WE ASK FOR EQUIPMENT, AND THAT BASED STILL FORMS THE BUDGET
  • AND THAT'S WHAT WE'RE GOING TO BE
  • THAT'S THE DETAILS OF WHAT YOU'RE GOING TO BE SEEING TODAY, AND WE ACTUALLY TRICKLE THIS ALL THE WAY DOWN TO THE PERFORMANCE PLANS OF EACH OF THE INDIVIDUALS WITHIN THE AIRPORTS, EVERYTHING THAT EVERYBODY DOES AS PART OF THEIR PERFORMANCE PLAN
  • WELL, ALMOST EVERYTHING, ANYWAY IS ALIGNED SOME WAY SOMEHOW BACK ALL THE WAY UP TO THE CENTER AGENDA
  • SO THAT'S THE PROCESS THAT WE GO THROUGH NEXT SLIDE
  • I SO SORRY
  • THIS SLIDE IS KIND OF BUSY, BUT THIS SHOWS JUST SOME EXAMPLE OF HOW THE SPECIFIC THINGS THAT WE'RE DOING IN THE CENTER
  • AND IT ALSO GIVES AN OUTLINE OF WHERE WE ARE
  • WE HAVE LONG TERM GOALS
  • SO THIS KIND OF SHOWS US A STATUS OF WHERE WE ARE AND SOME OF THEM, AS YOU MAY RECALL, COMMISSIONERS, ONE OF THE GOALS THAT WE'RE TRYING TO GET THE LONG TERM OVER THE NEXT TEN TO 20 YEARS IS TO BECOME WHAT WE CALL A FIVE STAR RATED AIRPORT
  • SKYTRACKS FIVE STAR RATED AIRPORT
  • THERE'S NO FIVE STAR SKYTRACKS, FIVE STAR RATED AIRPORT IN THE USA OR IN NORTH AMERICA, I THINK RIGHT NOW AND THERE ARE VERY FEW FOUR STARS
  • SO OUR OBJECTIVE IS TO GET TO FOUR STAR BY 2025, AND THEN AFTER THAT, MAYBE WITHIN THE NEXT FIVE OR SO YEARS GET TO A FIVE STAR AIRPORT
  • SO WE ARE RIGHT NOW WE'RE AT A THREE
  • WE HAVE, LIKE, 50 AREAS THAT WE'RE MEASURING, AND EVERY YEAR IT'S GOING TO TRY TO GET TEN UP GOES TO FOUR STARS
  • SO RIGHT NOW WE'RE STILL ON TRACK TO BE A FOUR STAR SKYTRACK AIRPORT BY 2025
  • ANOTHER OBJECTIVE THAT WE HAVE JUST REAL QUICK IS TO HAVE 30 YEAR ON INTERNATIONAL SERVICES OVER 2000 MILES BY 2025
  • WE'RE ALSO TRACK IN THAT AREA
  • WE HAD ELEVEN SERVICES COMING BACK TO US AFTER THE PANDEMIC, AND WE HAVE TWO NEW SERVICES ALREADY THIS YEAR, AND WE HAVE WESTJET, ANOTHER NEW SERVICE TO START LATER THIS YEAR AS WELL
  • SO WE'RE ON TRACK THERE AS WELL
  • AND THE LEVEL OF SERVICE YOU GUYS HAVE HEARD ME SAY WE NEVER AGAIN TRY TO GET UP TO A LEVEL OF SERVICE FOR THE ENTIRE AIRPORT DURING PEAK
  • THAT'S THE LONG TERM GOAL
  • OUR GOAL FOR 2025 IS TO GET THE IF, ALL OUR GATES, CHECKPOINT, RESTROOMS, ETCETERA
  • UP TO LEVEL OF SERVICE OPTIMAL BY 2025
  • AND WE'RE ON TRACK IN DEPTH HERE AS WELL
  • NEXT SLIDE ON THE CAPITAL DEVELOPMENT SIDE, AND WE'RE GOING TO BE ASKING FOR A LOT OF RESOURCES IN THIS AREA
  • ORGAN IS GOING TO SPEAK MORE ABOUT THAT
  • WE HAVE SET A GOAL THAT AGAIN, IS ALIGNED WITH THE CENTURY AGENDA TO COMPLETE 75% OF LARGE AVIATION PROJECTS WITHIN BUDGET AND WITHIN SCHEDULE LARGE DEFINED AS PROJECT OVER 50 MILLION
  • WE ARE DELAYED
  • WE'RE NOT ON TRACK IN THAT AREA
  • WE HAVE TWO PROJECTS, THE IF AND THE PACKAGE OPTIMIZATION THAT'S BEHIND SCHEDULE RIGHT NOW
  • SO WE'RE WORKING TO TRY TO GET THOSE DONE
  • ANOTHER OBJECTIVE THAT WE HAVE IS TO HAVE 75% OF THE SCHEDULED MY PHONE
  • WELL, IT'S NOT A LARGE PROJECT
  • IT SAYS LARGER, BUT IT'S ACTUALLY FOR ALL OUR PROJECTS TO HAVE FIVE OF THE GOALS EACH YEAR
  • RIGHT NOW WE'RE ON TRACK
  • WE'RE AT AND THEN WE HAVE OUR CASH FLOWS THAT WE ALSO ATTRACT AND OUR OBJECTIVE YEAR, WHERE YOUR STATE 75% OF PLANNED CASH FLOW
  • SO WE'RE ABOUT 93%
  • SO WE'RE ON TRACK IN THAT AREA AS WELL
  • NEXT SLIDE, AS I SAID, WE DON'T OFFER IT IN A VACUUM, THEIR INTERNAL AND EXTERNAL FACTORS THAT WE HAVE TO CONTEMPLATE
  • WE HAVE TO MITIGATE THE WEAKNESSES AND THE THREATS AND WE HAVE TO TAKE ADVANTAGE OF OUR STRENGTHS AND OPPORTUNITIES
  • OUR RECOVERY IS REALLY UNCERTAIN
  • BERGEN IS PROBABLY GOING TO TALK A LITTLE BIT MORE ABOUT THAT
  • WE WERE ON THIS REALLY NICE PATH TO RECOVERY, BUT THEN THE DATA VARIANT JUST CAME OUT OF NOWHERE AND THAT'S BECOME A CONCERN
  • BUT WE'RE STILL ON TRACK TO COME BACK
  • WE HAVE TWO VERY STRONG HUB AIRLINES HERE AT THE AIRPORT AT THAT FAVORS VERY WELL FOR US
  • WE HAVE BRAND NEW FACILITIES, THE NORTH SATELLITE
  • WE THE IF THAT'S GOING TO BE OPEN IN SOON AND WE HAVE A MAJOR CAPITAL DEVELOPMENT PROGRAM THAT'S UNDERWAY THAT YOU'RE GOING TO HEAR ABOUT
  • WE DID NOT REALLY SLOW DOWN DURING THE PANDEMIC, AND WE'RE GOING TO BE NEEDING A LOT OF RESOURCES TO SUPPORT THE PROGRAMS GOING FORWARD
  • YOU'RE GOING TO SEE THAT IN OUR BUDGET REQUESTS
  • WE'RE ALSO FORTUNATE TO GET A LOT OF SUPPORT FROM FEDERAL RELIEF
  • THE INDUSTRY GOT 20 BILLION
  • WE GOT ALMOST 400 MILLION
  • WE'RE REALLY ADVOCATING FOR THE INFRASTRUCTURE PACKAGE WHO ARE HOPING WILL BE PASSES 20 BILLION IN THERE FOR AIRPORTS AGAIN WHEN WE'RE HOPING TO GET ABOUT 400 MILLION OVER FIVE YEAR PERIOD
  • NEXT SLIDE, THESE ARE THE SAME AREAS THAT WE HAD LAST ERAS OF FOCUS
  • THEY REMAIN THE SAME
  • JUST REALLY WANT TO HIGHLIGHT ALL THE THINGS THAT WE ARE ASKING FOR AS PART OF THE CAPITAL AND THE OPERATING BUDGET IS ACTUALLY IN ALIGNMENT OR IN SUPPORT OF THESE TOP TEN STRATEGIC AREAS
  • NEXT SLIDE WE HAVE GONE THROUGH
  • WE HAVE UPDATED OUR GOALS AND OBJECTIVES
  • AS I SAID, WE REVISE AND REVIEWED WHAT WE'RE TRYING TO GET TO BY 2025 STILL REMAINS PRETTY MUCH INTACT
  • YOU'RE GOING TO SEE WHAT WE'RE TRYING TO ACHIEVE FOR 22 NOW WHAT WE'VE DONE, WE HAVE A LOT OF STUFF THAT WE'RE TRYING TO GET DONE ON THIS BUDGET
  • AS THE THING STEVE MENTIONED EARLIER IS VERY DIFFERENT THAN THE BUDGET BEFORE, BECAUSE WE EXPECT TO GET BACK TO ABOUT 90 95% OF WHERE PIER TO THE PANDEMIC
  • SO WE EXPECT TO GET EVERYTHING DONE BECAUSE WE WERE ASKING FOR RESOURCES
  • HOWEVER, WE HAVE PRIORITIZED THE LIST OF REQUESTS THAT WE HAVE JUST IN CASE, FOR WHATEVER REASON, WE CAN'T GET EVERYTHING DONE
  • THEN WHAT'S THE PRIORITY? DO WE TRY TO FIGURE IT OUT IN THE MIDDLE OF NEXT YEAR WHEN SOMETHING MIGHT BE HAPPENING? OR DO WE TRY TO FIGURE IT OUT FROM NOW? AND SO WE HAVE THREE PRIMARY CATEGORIES, THE THINGS THAT WE MUST GET DONE, THE THINGS THAT OUR REGULATORY, THE THING THAT COMMISSIONERS HAVE DIRECTED US TO DO
  • SO THAT'S ONE CATEGORY
  • THEN WE HAVE WHAT'S CALLED OUR WILDLY IMPORTANT
  • BUT THESE ARE THE TOP FIVE THINGS THAT WE MUST DO NO MATTER WHAT
  • AND THEN WE HAVE WHAT WE CALL THE PRETTY IMPORTANT COST ACRONYM PEAKS FOR THOSE THINGS
  • SO THOSE ARE THE THREE CATEGORIES THAT WE HAVE TO PRIORITIZE THE WORK THAT WE'RE DOING
  • BUT THE OBJECTIVE IS TO GET EVERYTHING DONE
  • WE TAKES AND OF COURSE, THE MOST DOES AND THE REGULAR TOURIST STUFF
  • NEXT SLIDE IT'S A COUPLE OF EXAMPLES OF THE MOST DOES
  • FOR EXAMPLE, WE HAVE TO MAINTAIN OUR OPERATING CERTIFICATE, SO WE HAVE TO DO A PART 139 INSPECTION EVERY YEAR BY THE FAA
  • FOR THE LAST THREE YEARS, WE HAVE HAD ZERO DISCREPANCIES, AND WE WANT TO MAINTAIN THAT TSA AUDIT
  • FOR THE LAST FOUR YEARS, WE HAVE HAD ZERO DISCREPANCIES
  • AGAIN, WE'D LIKE TO CONTINUE THAT AND WE HAVE OTHER AREAS IN TERMS OF OUR TO RESPOND TO NON COMPLIANT ISSUES WITHIN FIVE DAYS
  • AS AN EXAMPLE, I WANT TO MAKE SURE WE MAINTAIN WE MAINTAIN THOSE
  • SO THESE ARE EXAMPLES OF SOME OF THE THINGS THAT WE ACTUALLY MUST DO, SOME OF THE THINGS THAT ARE REGULATORY
  • NEXT SLIDE AGAIN, THESE ARE OTHER EXAMPLES OF THINGS THAT OUR REGULATORY AND THAT WE MUST DO DIRECTIVE THAT WE HAVE GOTTEN FROM COMMISSIONERS RESILIENCY
  • WE'RE GOING TO BE DOING AN EXERCISE EACH YEAR
  • THAT EXERCISE COULD RANGE FROM HOW WE RESPOND TO A CLEAN CRASH
  • IT COULD BE HOW WE RESPOND TO AN ACTIVE SHOOTER
  • IT COULD BE AN EARTHQUAKE, ET CETERA
  • BUT WE'RE GOING TO BE DOING THAT EVERY YEAR
  • WE HAVE MONEY IN THE BUDGET NEXT YEAR ALSO TO CONTINUE AND EXPAND THE TRAIN AND FOR HUMAN TRAFFIC EXTRA
  • THESE, AGAIN, ARE SOME OF THE EXAMPLES IN THE MOSCOW CATEGORY
  • NEXT SLIDE AND COMMISSION DIRECTED CATEGORY AS WELL
  • AND THESE ARE EXAMPLES OF WEEKS ACHIEVE A 5% REDUCTION IN MAJOR INCIDENT RATES THAT THE AIRPORT SAFETY IS EXTREMELY IMPORTANT TO US
  • DISCOVER CHALLENGING ONE FOR US BECAUSE IT DOES NOT ONLY DEPEND ON US, WE HAVE TO DEPEND ON PRETTY MUCH EVERY TENANT WITHIN THE AIRPORT TO ACTUALLY MEET THESE GOALS
  • AND MAJOR INCIDENTS COULD INCLUDE DAMAGE TO AN AIRPLANE, SOMEBODY GETS INJURED, AN INCIDENT THAT COST OVER $1,000, ET CETERA
  • SO OUR GOAL IS TO GET A 5% REDUCTION
  • I MENTIONED THE SKY TRACK GOALS THAT WE HAVE AND OF COURSE, FINANCIAL SUSTAINABILITY
  • AS WE DO ALL OF THIS, WE HAVE TO MAKE SURE WE MAINTAIN A DEBT SERVICE COVERAGE AT 1.4
  • BUT BORGAN IS GOING TO TALK ABOUT THAT, AND WE'RE TRYING TO GET TO A 14 MONTH OFF ON CASH ON HAND BY 2022
  • OUR LONG TERM GOAL IS TO GET TO 18 MONTHS OF CASH IN HAND
  • NEXT SLIDE THESE ARE EXAMPLES OF SOME OF WHAT WE CALL PIGS, AS YOU SAW, COMMUNITY WITH A PRIORITY UNDER THE WEEKS
  • WE ALSO HAVE COMMUNITY AS A PRIORITY AND THE PRETTY IMPORTANT GOALS AS WELL
  • WE HAVE SEVERAL OBJECTIVES AND TARGETS THAT WE HAVE AS PART OF A NOISE WORKING GROUP AND THE FEDERAL POLICY WORKING GROUP OUR GOAL IS TO ACTUALLY ACHIEVE ALL OF THOSE IN 2022 FOR CUSTOMER SOME EXPERIENCE GOALS
  • YOU CAN SEE SOME OF THOSE GET EVERYBODY THROUGH THE SECURITY CHECKPOINT WITHIN 22 MINUTES OR LESS
  • THE CAPITAL DEVELOPMENT PART COMPLETE THE SAM ESTIMATE THAT'S WHAT SAM IS GOING TO BE PASSED IN US
  • WE PLAN TO COMPLETE THAT BY Q ONE
  • NEXT SLIDE, PLEASE
  • I ANOTHER EXAMPLE OF PEAKS
  • COMMISSIONERS
  • WE HAVE BEEN AGAIN WORKING VERY HARD WITH THE ENVIRONMENTAL GROUP TO TRY TO ENSURE THAT WE MEET THE GOALS AND OBJECTIVES AS ESTABLISHED BY THE COMMISSIONERS TO REDUCE GREENHOUSE GAS EMISSIONS AT THE AIRPORT, NOT JUST SCOPE ON SCOPE TO BUT ALSO SCOPE THREE
  • SO THESE ARE JUST SOME OF THE EXAMPLES OF WHAT WE'RE TRYING TO MEET
  • NEXT SLIDE
  • AND I THINK THIS IS MY FINAL SLIDE, THE SUSTAINABILITY PROJECT FRAMEWORK
  • WE REALLY GOT A CHANCE TO RUN IT THROUGH THE FIRST MAJOR PROJECT, WHICH IS THE C ONE OR WHAT WE'RE INTO A CLOUD IN THE CONCOURSE EXPANSION PROJECT
  • IS THERE LOTS OF LESSONS LEARNED
  • SO THE ENVIRONMENTAL TEAM AND OUR TEAM, THE ARRAIN TEAM, IS GOING TO ACTUALLY GO THROUGH AND TWEAK AND FINALIZE THAT SUSTAINABLE PROJECT FRAMEWORK
  • WE'RE REALLY LEARNED A LOT FROM THAT
  • JUST SOME OF THE HOW WE'RE DOING STUFF AND TRY TO ESTABLISH THE FRAMEWORK FOR BUDGETING PROCESS
  • I'M GOING TO NOW HAND OVER TO OREGON AND OREGON IS GOING TO GET INTO A LOT MORE OF THE DETAILS
  • IF COMMISSIONERS HAVE ANY QUESTIONS AT THIS POINT, WE CAN OR WE CAN WAIT UNTIL BORGAN IS FINISHED TO ANSWER ANY QUESTIONS AND OVER TO BORGAN? WELL, I THINK, LANCE, THAT WAS GREAT AND EXACTLY ON TIME
  • COULD WE JUST TAKE A QUICK MINUTE TO MAKE SURE THAT THERE'S A SEE WHAT THE COMMISSION THINKS OF ANY CLARIFYING OR QUESTIONS AS A RESULT OF THAT VERY ARTICULATE AND EXPEDITED PRESENTATION? GO AHEAD AND RUN THROUGH THE RULE BEGINNING WITH COMMISSIONER BOMAN
  • WELL, COMMISSIONER
  • BOWMAN
  • OH, SORRY
  • I'M TRYING TO TURN MY CAMERA ON HERE
  • IT'S NOT WORKING
  • I DON'T HAVE ANY QUESTIONS RIGHT AT THE MOMENT, LANCE, I PREFER IF YOU JUST KEPT GOING
  • THANK YOU
  • I CAN NONE FOR ME EITHER
  • THANK YOU, COMMISSIONER CHO I'M GOING AS WELL
  • THANKS TO THIS IS GREAT COMMISSIONERS STEINBRUECK? HOW WAS THE 400 MILLION DIVID UP FROM THE FEDERAL RELIEF PACKAGE? WHERE DID IT GO? OH, IT WAS A I CAN GIVE THE DETAIL, BUT IT WAS PRIMARILY FOR OPERATING EXPENSE AND DEBT SERVICE PAYMENT
  • RIGHT AGAIN
  • CORRECT
  • I'LL COVER THAT A LITTLE BIT LATER
  • SO NO DIRECT RELIEF TO TENANTS OR YES, AS PART AS THE SECOND PACKAGE
  • THE CHRIS AND THE ARPA HAD ONE SPECIFICALLY ALLOCATED FOR THE CONCESSIONAIRES AND RENTAL CAR COMPANIES, ETC
  • SO ORGAN IS GOING TO GET INTO SOME
  • ALL RIGHT
  • OKAY
  • I CAN WAIT
  • THANK YOU
  • THANK YOU, COMMISSIONER
  • FOLLOW ME
  • THANK YOU
  • I GUESS NOT NECESSARILY THE ANSWER AT THIS MOMENT, BUT A COUPLE OF THINGS THAT DID JUMP OUT AT ME AND I KNOW I SAW ON THE LATER THAT WE DON'T HAVE A SAM CONTINGENCY BUILT IN ALL OF THE NUMBERS WE HAVE OUR NOT INCLUDING SAM, AND OBVIOUSLY THERE'S SOME UNCERTAINTY, OF COURSE, BUT I DON'T
  • PERHAPS YOU CAN TELL ME WHETHER MAY OR MAY NOT BE A CONTINGENCY IN THERE
  • I ALSO NOTE THAT SPECIFICALLY WE HAVE A SLOWER GOAL WITHIN THE SUSTAINABLE AVIATION FUEL GOAL
  • AND IT JUST SEEMS TO ME IS A VERY SPECIFIC POINT THAT WE'D LIKE TO SEE ADDRESSED AND THEN ALSO THE WHAT DO YOU CALL IT THE PART 50 NOISE
  • SO THE GOAL IS OF THE 14, 150 NOISE
  • AND I JUST WOULD LIKE AT SOME POINT FOR US TO HAVE A REMIND US ABOUT HOW THAT NUMBER GOT PICKED IS THAT I THINK IT WAS A FEASIBILITY QUESTION, BUT WE CAN GO ON
  • I JUST WANT TO PUT THOSE QUESTIONS OUT THERE UNLESS THERE'S A REAL FAST ANSWER TO ANY OF THOSE
  • WELL, THE SAM, AS I SAID IN ONE OF THE SLIDES, WE'RE GOING TO BE DOING THE ESTIMATE BY Q ONE OF NEXT YEAR
  • ACTUALLY, IT WAS YESTERDAY WORKING
  • WE JUST MET WE WENT THROUGH ACTUALLY VARIOUS DIFFERENT SCENARIO FOR CIP, WHICH INCLUDES AND DOES NOT INCLUDE SAM OR VARIOUS DIFFERENT VERSION OF THE SAM, SO WE CAN MAYBE TALK ABOUT THAT ELITE WHAT WE WE DO NOW ALL AT OUR WORK AND THERE IS ACTUALLY A HUGE INGENIUS ASSOCIATED WITH IT, DEPENDING ON WHICH ONE OF THE SCENARIOS WE ACTUALLY END UP CHOOSING
  • BUT I DON'T THINK IT'S PART OF TODAY'S PRESENTATION, IS IT? NO, IT'S NOT
  • ALRIGHT
  • SO I MEAN, IT OBVIOUSLY IS A MAJOR BUDGET IMPLICATION
  • SO MAYBE YOU CAN JUST GIVE US AN ORDER OF MAGNITUDE WHEN YOU GO INTO FURTHER DISCUSSION
  • OKAY
  • VERY GOOD
  • ALRIGHT, LET US PROCEED
  • YES, I WILL GET READY
  • TURN TO THE QUESTION RELATED TO THE 550, NOT LATER IN THE PRESENTATION
  • I'LL TRY TO GET A RESPONSE TOGETHER FOR THAT
  • THANK YOU
  • OKAY
  • TURNING TO SLIDE 16 HERE BEFORE I GET INTO THE NUMBERS
  • I'D LIKE TO JUST GO OVER A LITTLE BIT OF THE DRIVERS, AND I THINK BOTH STEVE AND LANCE HIT ON THE FIRST TWO POINTS AND THEY'RE EXTREMELY IMPORTANT FOR OUR BUDGET FOR 2022
  • ANOTHER FACTOR IS JUST TO REMIND EVERYBODY THAT WE REALLY DID CUT OUR BUDGET SIGNIFICANTLY IN 2000 AND 22,021
  • AND SOMETIMES THERE ARE COSTS THAT YOU CAN PUT OFF FOR A YEAR, SOMETIMES TWO YEARS
  • BUT WE'RE FINDING THAT A THIRD YEAR IS ALMOST IMPOSSIBLE
  • SO WE'VE GOT A LOT OF THINGS THAT ARE JUST COMING BACK TO OUR BUDGET AND 2022, AND IT'S ALL COVERED LATER
  • THERE'S ELEMENTS OF CAPITAL PROJECTS THAT HAVE EXPENSE PIECES, AND WE'VE GOT TO INCUR THOSE AS WELL
  • AND ON A POSITIVE SIDE, HAVING THE FULL OPENING OF THE INTERNATIONAL ARRIVALS FACILITY AND PHASE TWO OF THE NORTH SATELLITE
  • IT'S GREAT FROM A CUSTOMER SERVICE STANDPOINT, BUT FROM A BUDGET STANDPOINT, WE HAVE THE COSTS OF OPERATING AND MAINTAINING THOSE FACILITIES IN 2022
  • AND WHILE WE WE ARE SEEING COSTS GO UP IN MANY AREAS
  • THE GOOD NEWS IS WE DID RESERVE SOME OF THE FEDERAL RELIEF MONEY FOR 2022, SO THAT WILL GO A LONG WAY TO HELP US OFFSET AIRLINE RATE INCREASES
  • AND ANOTHER POINT I WANT TO MAKE IS THAT THE AVIATION DIVISION TOOK THE 2021 BUDGET AS THE STARTING POINT FOR BUILDING OUR 2022 BUDGET
  • AND BECAUSE THAT 2021 BUDGET WAS REALLY CUT TO THE BONE, WE DESCRIBED IT A LITTLE BIT AS A ZERO BASED BUDGET IN THE SENSE THAT WE WANTED TO BE VERY THOUGHTFUL AND DELIBERATE ABOUT EACH ITEM
  • WE ADDED BACK
  • WE DIDN'T WANT TO JUST AUTOMATICALLY BRING BACK THINGS BECAUSE THEY WERE IN THE 2020 BUDGET, FOR EXAMPLE
  • SO THAT'S AN IMPORTANT CONSIDERATION
  • NEXT SLIDE, PLEASE
  • SO THIS IS THE VISUAL VIEW OF OUR PASSENGER RECOVERY
  • AND THE GREEN BAR IS OUR ESTIMATE FOR 2022
  • AND IS LANCE INDICATED WE'RE EXPECTING TO BE DOWN 5% FROM 2019, BUT IT'S STILL IT'S A 35% GROWTH OVER WHERE WE ARE THIS YEAR
  • SO SIGNIFICANT GROWTH GOING INTO NEXT YEAR
  • THE STORY IS REALLY THE SAME
  • THE RECOVERY IS BEING DRIVEN BY THE DOMESTIC LEISURE MARKET
  • BUSINESS AND INTERNATIONAL ARE LAGGING
  • WE DO EXPECT BUSINESS TRAVEL TO COME BACK NEXT YEAR AND AT LEAST THE EUROPEAN SIDE OF THE INTERNATIONAL TRAFFIC
  • A LOT OF EXPERTS THINK THE ASIAN SIDE MAYBE LAGGING FURTHER
  • STILL
  • NEXT SLIDE, PLEASE
  • AND THE VIEW OF OUR CAPITAL PROGRAM, CERTAINLY THE LAST FOUR YEARS WE HAVE SPENT LITERALLY THE HIGHEST LEVEL WE'VE EVER SPENT FOR THE AVIATION DIVISION
  • AND WHAT WE'RE BUILDING TO IS SOMETHING THAT IS SIGNIFICANTLY ABOVE THAT
  • AND WE'LL TALK ABOUT SOME OF THE PROJECTS THAT ARE DRIVING THAT WOULD CARRY
  • STEVEN STARTS TO GET INTO THE DETAILS OF THE CAPITAL PROGRAM, BUT TO YOUR POINT, COMMISSIONER FELLEMAN, THIS FORECAST, AS HIGH AS IT IS, DOES NOT INCLUDE SAM
  • AND WHEN WE START TO LAYER IN THOSE PROJECTS OVER THE NEXT FIVE TO TEN PLUS YEARS, WE'LL LIKELY SEE A CONTINUED VERY HIGH LEVEL OF SPENDING GOING OUT
  • NEXT SLIDE, PLEASE
  • SO WHAT I WANT TO START WITH HERE IS JUST HOW WE BUILD THE BUDGET
  • AND THIS IS JUST THE AVIATION SPECIFIC BUDGET
  • LATER ON, I'LL SHOW THE TOTAL AIRPORT COST, INCLUDING THE COST FROM CENTRAL SERVICES
  • WHAT WE START WITH IS OUR 2021 BUDGET
  • EVERYTHING IN GREEN IS A COST REDUCTION
  • EVERYTHING IN RED IS A COST ADDITION
  • SO THE FIRST THING WE DO IS WE PULL OUT EVERYTHING THAT WAS A NON RECURRING ITEM THAT WAS IN THE 2021 BUDGET, AND THEN WE LOOK FOR SAVINGS AND THE MOST SIGNIFICANT SAVINGS
  • THE COST REDUCTION COLUMN THERE IS THAT WE ELECTED TO INCREASE THE PAYROLL VACANCY FACTOR TO 5%
  • IT WAS ONE AND A HALF PERCENT IN 2021
  • AND THIS AVIATION HERE ACCOUNTS FOR A LITTLE OVER SIX AND A HALF MILLION DOLLARS OF SAVINGS
  • WE THINK IT'S A REASONABLE ASSUMPTION, BUT IT DOES REPRESENT A SIGNIFICANT RISK IN OUR BUDGET WHEN IT COMES TO COST INCREASES IN THIS LINE ITEM THAT'S CHARGES TO CAPITAL
  • THERE'S SOME OFFSETS BUILT IN THERE
  • WE'RE ADDING A LOT OF RESOURCES CONSULTANTS TO SUPPORT OUR CAPITAL PROGRAM, BUT MOST OF THOSE ARE BEING CHARGED TO CAPITAL
  • SO THE REAL DRIVERS HERE IN OUR COST INCREASES ARE JUST OUR PAYROLL COSTS
  • AND I THINK AS DAN THOMAS TALKED ABOUT TWO WEEKS AGO, IT INCLUDES THE COST OF OUR REPRESENTED WORKERS FOLLOWING THE TERMS OF THEIR CONTRACTS, AS WELL AS AN ESTIMATED 6% INCREASE FOR THE PAY FOR PERFORMANCE FOR THE NON REPRESENTED FOLKS
  • IN ADDITION, WE HAVE A NUMBER OF COSTS THAT ARE TIED TO OUR REVENUES AND SOME OTHER COST INCREASES BELOW THAT LINE
  • WHAT WE CALL THE BASELINE ARE REALLY WHAT THE REST OF THE PRESENTATION IS GOING TO TALK ABOUT IS ALL THE NEW ADDITIONS THAT WE'RE REQUESTING, AND THE TOTAL ABOUT $39 MILLION
  • SOME OF THEM ARE PROPOSED TO BE ADDED TO THE BASELINE, AND SOME ARE ALSO NON RECURRING ITEMS BUT GOING FROM 242,000,000 TO 286 IS WHAT THE NEXT SLIDE WILL ILLUMINATE
  • NEXT SLIDE, PLEASE
  • SO I'M GOING TO GIVE YOU THREE SLIDES IN A ROW THAT SLICE OUR BUDGET REQUESTS IN DIFFERENT WAYS TO HELP YOU UNDERSTAND WHAT WE'RE DOING
  • GIVEN THE QUANTITY OF THE PROPOSED ITEMS 203, I WILL NOT BE GOING THROUGH EACH ONE INDIVIDUALLY, BUT I'LL TRY TO GIVE THE HIGHLIGHTS, BUT I WOULD WANT TO SAY UP FRONT THAT IN THE APPENDIX, WE HAVE LISTED EVERY SINGLE ONE OF THESE ITEMS SO LET ME START ON THE LEFT SIDE AND LOOKING AT OUR OVERALL NUMBERS
  • WE HAD BUDGET REQUESTS TOTALING ALMOST 49 MILLION, AND WE'RE PROPOSING FOR APPROVAL 39 MILLION
  • OF THOSE LOOKING AT THE FTES AGAIN, 106 WERE PROPOSED, AND WE ARE PROPOSING FOR APPROVAL 81.6 AND THEN ON THE RIGHT SIDE, TYING BACK TO THE CATEGORIES THAT LANCE DISCUSSED WITH YOU A MOMENT AGO
  • YOU CAN SEE HOW THOSE SAME BUDGET REQUESTS ARE ORGANIZED BY THE MUST, THE WIGS AND THE PIGS
  • AND THEN WHAT I'VE ALSO DONE IS BREAK OUT TWO MORE CATEGORIES BECAUSE I THINK THEY'RE HELPFUL AND THAT'S THE EXPENSE TIED TO CAPITAL PROJECTS
  • AND REALLY THOSE ARE THOSE ARE MUTED, TOO
  • UNLESS YOU WANT TO CANCEL THE CAPITAL PROJECT AND THEN THE NEW FACILITY COSTS
  • WHEN WE BRING ON A LOT OF NEW SPACE, WE HAVE TO MAINTAIN THAT SPACE
  • WE HAVE TO CLEAN THE SPACE, WE HAVE TO CLEAN THE WINDOWS
  • AND SO THERE'S A LOT OF COSTS TIED TO NEW FACILITIES
  • AND THEN, OF COURSE, WE HAVE OTHER ITEMS AS WELL, WHICH WILL TOUCH ON NEXT SLIDE, PLEASE
  • SO WHAT I'M DOING ON THIS SLIDE IS HIGHLIGHTING THE BIGGEST INDIVIDUAL DOLLAR ITEMS AND SO YOU CAN SEE AT THE TOP OF THE LIST
  • AIRLINE REALIGNMENT
  • THIS IS THE PROJECT TO REALLY OPTIMIZE OUR USE OF THE INTERNATIONAL ACCESSIBLE GATES ON CONCOURSE, AND IT REQUIRES MOVING UNITED OFF OF CONCOURSE OVER TO CONCOURSE B, MOVING DELTA OVER TO CONCOURSE AND MOVING THEIR RELATED FACILITIES AND SPACES
  • SO IT'S ACTUALLY QUITE A COMPLEX PROJECT, AND THERE WILL BE EXPENSE ELEMENTS OF IT
  • THE SECOND ITEM IS 81 FTES AND THE COST TO OUR BUDGET
  • NOW, MANY OF THEM ARE BEING CAPITALIZED BECAUSE THEY SUPPORT THE CAPITAL PROGRAM, BUT THERE STILL IS A SIGNIFICANT COST
  • THE NEXT ITEM IS THE CONSOLIDATED SERVICES CONTRACT, AND THIS IS THE CONTRACT WE USE TO PROVIDE SUPPORT FOR THE CHECKPOINT QUEUING
  • WE USE IT OUT IN THE GARAGE FOR THE GROUND TRANSPORTATION OPERATIONS
  • THEY'RE THE SERVICE PROVIDERS THAT REALLY HELP PASSENGERS AND HELP US THROUGH OUR BUSY TIMES
  • WE'RE BRINGING THIS BACK AS A REQUEST THIS YEAR
  • IT'S AN EXISTING CONTRACT, BUT WE FEEL WE FINALLY RIGHT SIZED IT
  • WE CUT IT BACK DRAMATICALLY FOR THIS YEAR, AND NOW WE'RE BRINGING UP BACK TO A LEVEL THAT WE THINK IS PROBABLY THE RIGHT LEVEL GOING FORWARD
  • SO IN THE FUTURE, WE EXPECT THIS WILL BE PART OF THE BASELINE BUDGET
  • NEXT ITEM IS PLANNING
  • WE HAVE A NUMBER OF PLANNING STUDIES
  • THE MOST SIGNIFICANT ITEM WITHIN THIS ONE, 7 MILLION IS A PLAN TO STUDY THE ULTIMATE REPLACEMENT FOR THE SATELLITE TRANSIT SYSTEM THAT CONNECTS TO THE NORTH AND SOUTH SATELLITE TO THE MAIN TERMINAL, AND THAT SYSTEM WILL BE REACHING THE END OF ITS LIFE IN ABOUT TEN YEARS OR SO, AND BEING ABLE TO START THE PLANNING PROCESS FOR WHAT COMES NEXT IS CRITICAL
  • THE NEXT ITEM IS, OF COURSE, COMPLETING THE SUSTAINABLE AIRPORT MASTER PLAN, ENVIRONMENTAL REVIEW THAT'S OBVIOUSLY GONE ON A LITTLE BIT LONGER THAN WE ORIGINALLY ANTICIPATED, BUT WE DO EXPECT TO COMPLETE THAT NEXT YEAR
  • THE OTHER ITEMS, I THINK MANY OF THEM ARE SELF EXPLANATORY, AND YOU'VE SEEN THEM BEFORE
  • I DID WANT TO CALL OUT STOCK, FURNITURE AND EQUIPMENT
  • THIS IS THE OFFICE BUILDING ACROSS THE STREET FROM THE AIRPORT, AND THIS IS THE SPACE THAT IS BEING OCCUPIED BY THE INTERNATIONAL ARRIVALS FACILITY CONTRACTOR
  • WHEN THEY MOVE OUT, WE WILL BE TAKING OVER THAT SPACE AND WE NEED TO FURNISH IT
  • THE OTHER THING I WANTED TO MENTION WAS THE AE CONFERENCE SPONSORSHIP
  • WE'RE EXCITED TO HAVE THAT CONFERENCE COMING TO SEATTLE NEXT YEAR, AND THAT'LL BE AN OPPORTUNITY TO SHOWCASE SOME OF THE NEW AIRPORT FACILITIES AS WELL
  • SO WITH THAT, LET'S MOVE ON TO THE NEXT SLIDE, PLEASE
  • SO THIS IS THE LAST SLIDE THAT SLICES AND DICES THOSE 203 BUDGET REQUESTS
  • AND HERE AGAIN BY THE SAME STRATEGIC CATEGORIES THAT LANCE HIGHLIGHTED EARLIER
  • AND YOU CAN SEE WHERE THE SIGNIFICANT DOLLARS AND FTES ARE GOING
  • AND I'LL JUST SAY NOW IN THE NEXT TWO SLIDES AFTER THIS, I'LL BE HIGHLIGHTING FURTHER WHAT'S INSIDE THESE
  • BUT RIGHT NOW, I JUST WANTED TO HAVE YOU FOCUSED THAT IT'S REALLY HEALTH AND SAFETY
  • IT'S CUSTOMER EXPERIENCE, ITS ENVIRONMENT AND SUSTAINABILITY
  • AND THEN FINALLY, THE MOST RESOURCES ARE GOING TO ASSET MANAGEMENT, CAPITAL PLANNING AND CAPITAL DELIVERY
  • THAT'S WHERE WE SEE 44 FTES AND ALMOST $20 MILLION
  • NEXT SLIDE, PLEASE
  • SO HERE ARE WHAT I'LL CALL THE HIGHLIGHTS INSIDE EACH OF THOSE CATEGORIES, AND I'M NOT GOING TO TOUCH ON EACH ONE OF THESE
  • BUT AS LAND SYNDICATED AT THE OUTSET UNDER HEALTH AND SAFETY, WE DO HAVE THE RESILIENCY EXERCISE, WHICH WE EXPECT TO BE AN ANNUAL EXERCISE UNDER COMMUNITY
  • YOU CAN SEE THE A CONFERENCE SPONSORSHIP THAT I MENTIONED IN LO AGO AND AT THE TOP RIGHT UNDER SOCIAL RESPONSIBILITY, YOU CAN SEE THE HUMAN TRAFFICKING TRAINING AND THAT'S THE FIRST OF WHAT'S EXPECTED TO BE THE PROGRAM
  • OTHER THINGS WORTH CALLING OUT UNDER CUSTOMER EXPERIENCE
  • WE ARE GOING TO IMPLEMENT A QUALITY ASSURANCE PROGRAM NEXT YEAR, AND THAT'LL BE REALLY IMPORTANT TO HELPING US MAKE SURE WE CAN IDENTIFY AREAS FOR IMPROVEMENT SO WE CAN MOVE THE RATINGS UP TOWARDS THE FOUR STAR
  • NEXT SLIDE, PLEASE
  • UNDER ENVIRONMENT SUSTAINABILITY
  • I WANTED TO CALL OUT THE BUILDING ENERGY EFFICIENCY AUDIT
  • THIS WILL BE STARTING THIS PROGRAM
  • THIS IS A NEW REQUIREMENT AND WE WANT TO GET OUT IN FRONT OF THAT
  • AND THEN WE ALSO HAVE WHAT IS THE PASSENGER MODE CHOICE STUDY, WHICH IS GOING TO BE AN IMPORTANT PART OF THE GROUND TRANSPORTATION ACCESS PLAN AND THEN SUPPORT FOR THE TRANSPORTATION MANAGEMENT ASSOCIATION PROGRAM THAT'S STARTING UP ACTUALLY THIS YEAR
  • NOW THE BIG DOLLARS ON THE RIGHT
  • AGAIN, I'VE TALKED ABOUT THE EXPENSE ELEMENTS OF THE CAPITAL PROJECTS
  • THAT'S OBVIOUSLY A BIG PIECE OF THIS
  • BUT HERE'S WHERE WE SEE JUST BUILDING BACK TO 95% OF OUR OPERATIONS, WE GOT TO MAINTAIN OUR EXISTING FACILITIES
  • SO THIS IS SIGNIFICANT DOLLARS AND TEN FTES
  • WE SEE SUPPORT OF THE CAPITAL PROGRAM IS 25 FTES, AND THESE ARE MOSTLY IN THE PROJECT MANAGEMENT GROUP, BUT SOME OF THEM ARE IN OUR OPERATIONS READINESS TEAM, AND SOME ARE IN FACILITIES AND INFRASTRUCTURE TO SUPPORT THE CAPITAL PROGRAM AS WELL
  • AND THEN WE HAVE COSTS ASSOCIATED WITH MAINTAINING OUR NEW FACILITIES
  • AND THESE WOULD BE MOSTLY MAINTENANCE FTES
  • I INDICATED THE PLANNING STUDIES AND THE STAFF ENVIRONMENTAL REVIEW ALREADY
  • NEXT SLIDE, PLEASE
  • OKAY
  • FROM AN FTE STANDPOINT, I THINK THE KEY HERE IS TO WHEN WE LOOK AT WHERE WE WERE IN 2020 AND WHERE WE'RE PROPOSING TO BE IN 2022
  • FROM AN FTE STANDPOINT, WE'RE PROPOSING TO BE IN EXACTLY THE SAME PLACE
  • BUT WHAT I'D LIKE TO CALL OUT IS THAT WE ARE GETTING THERE IN A VERY DIFFERENT WAY
  • AT THE BOTTOM OF THE SLIDE ON THE RIGHT
  • YOU CAN SEE THAT WE ACTUALLY HAD STEVE APPROVED 20 OF 21 FTE MID YEAR THIS YEAR AS WE STARTED TO GET OUR TRAFFIC COMING BACK
  • AND WITH THE 81 THAT WE'RE PROPOSING, THAT IS THE 102 FTES THAT WE HAD BASICALLY FROZEN LAST YEAR
  • BUT AT THE BOTTOM, IF YOU PUT THOSE TWO CATEGORIES TOGETHER, WE ARE ASKING FOR 51 NEW POSITIONS AND MAINTAIN AND ONLY UNFREEZING 51 OF THE FROZEN POSITION
  • SO AGAIN, JUST REINFORCING WHAT I SAID EARLIER
  • WE'RE BEING VERY THOUGHTFUL ABOUT THE POSITIONS WE ASKED FOR, AND IN MANY CASES, WHAT OUR NEEDS ARE NOW ARE ACTUALLY DIFFERENT FROM WHAT WE SAW BACK IN 2020
  • NEXT SLIDE, PLEASE
  • SO HERE IS THE ROLL UP OF ALL OF OUR EXPENSES
  • THIS INCLUDES THE COST FROM CENTRAL SERVICES
  • AND I'VE TRIED TO HIGHLIGHT SOME OF THE DRIVERS OF OUR PAYROLL COSTS AND SOME OF THE OTHERS
  • BUT THE BOTTOM LINE IS OUR COSTS COMPARED TO 2020 BUDGET ARE UP 5.4%
  • AND I HOPE THE EXPLANATIONS I'VE GIVEN FOR SOME OF THE DRIVERS OF OUR BUDGET HELP YOU UNDERSTAND HOW WE GOT THERE
  • NEXT SLIDE, PLEASE
  • IS THAT JUST A SEC HERE? YES
  • WELL, WHAT IS THE COMPARISON WITH 2019, WHICH WOULD BE A MORE TYPICAL YEAR THAN 2020 IN TERMS OF COST INCREASE? LET'S GO BACK THERE, PLEASE
  • OKAY
  • SO WHERE ARE WE? WE ARE PROPOSING A BOTTOM LINE OPERATING EXPENSE OF 397,000,000, AND THE 2019 ACTUAL WAS 355
  • I THINK THAT WHENEVER WE COMPARE TO A PRIOR YEAR, WE HAVE TO REMEMBER THAT THERE WAS A SIGNIFICANT PENSION CREDIT IN 20 AND 19, AND I BELIEVE IT WAS ABOUT FOR THE AIRPORT, IT WAS ABOUT $14 MILLION
  • SO LET'S JUST SAY THAT'S ABOUT 370,000,000
  • AND THAT COMPARES TO THE 397
  • THAT'S STILL AN INCREASE
  • BUT I THINK WHAT I'VE TALKED ABOUT HERE OVER THE LAST FEW SLIDES IS WE HAVE SOME SIGNIFICANT NEW FACILITIES
  • WE HAVE SOME SIGNIFICANT NON RECURRING COST DRIVERS LIKE THE AIRLINE REALIGNMENT
  • OUR BUDGET FOR 2022 IS WHAT WE FEEL WE NEED IN 2022
  • AND YES, IT IS HIGHER THAN 2019
  • NEXT SLIDE, PLEASE
  • OKAY
  • SO NOW WE'RE LOOKING AT A SUMMARY INCOME STATEMENT
  • SO WE SEE THE REVENUES ON THE TOP
  • AND I THINK WHAT WE'VE DONE HERE IS TO ADD IN SOME LINE ITEMS FOR THE FEDERAL RELIEF MONEY SO THAT WE CAN GIVE YOU A MORE COMPREHENSIVE VIEW OF OUR BOTTOM LINE AND WHERE THAT NI IS AFTER FEDERAL RELIEF, YOU CAN SEE THAT WE'RE ACTUALLY GOING UP SIGNIFICANTLY FROM 2020 BUDGET AND FROM PRIOR YEARS AND JUST TO A LARGE EXTENT IS DRIVEN BY THESE FEDERAL GRANTS, BUT IT'S STILL A VERY POSITIVE STORY ON OUR BOTTOM LINE
  • BUT COMMISSIONER STEINBRUECK, YOU CAN SEE THE FEDERAL RELIEF THERE
  • AND I'LL SHOW LATER EXACTLY HOW WE'VE USED IT
  • BUT YOU CAN SEE ALREADY HERE THE AMOUNTS THAT ARE EARMARKED OR EXCUSE ME, DESIGNATED FOR CONCESSIONS RELIEF
  • THE FIVE 3 MILLION IS THE CARISSA PROGRAM THAT WILL USE THIS YEAR AND THE ARPA MONEY THAT'S 21 MILLION WILL BE FOR NEXT YEAR
  • I THINK THE OTHER KEY POINT IS OUR KEY MEASURES THE DEBT SERVICE COVERAGE AND OUR CASH BALANCE
  • AND YOU CAN SEE FOR 2022 DEBT SERVICE COVERAGE 1.9 AS WELL ABOVE WHERE WE FEEL WE NEED TO BE, WHICH WOULD BE TARGETING SORT OF THE 135 TO ONE FOUR RANGE AND OUR CASH BALANCE
  • WE'RE RIGHT ON TARGET GETTING UP TO 14 MONTHS OF ONM COST
  • NEXT SLIDE, PLEASE
  • SO NOW I'M LOOKING AT OUR NON EAR NAUTICAL REVENUES COMPARED TO 2019, BECAUSE IT IS A GOOD THING
  • I THINK WHEN WE'RE LOOKING AT REVENUES TO COMPARE TO OUR LAST ACTUAL YEAR, AND IN THIS CASE, I'VE ADJUSTED FOR THE CONCESSIONS GRANT
  • SO I'VE IN EFFECT, ADDED THAT MONEY BACK IN
  • SO YOU CAN SEE THE TRUE PERFORMANCE OF THE BUSINESS UNIT
  • BUT NO SURPRISE IN 2020, ALL OF THESE BUSINESSES DROP SIGNIFICANTLY, AS DID THE PASSENGER LEVEL, WHICH IS IN BLACK
  • AND THEN IN 2021, WE'RE SEEING A VERY VARIED RECOVERY
  • SOME BUSINESSES LIKE PARKING ARE DOING QUITE WELL AND OTHERS ARE REALLY LAGGING
  • WHAT I'D LIKE TO HIGHLIGHT THOSE BY NEXT YEAR, WE EXPECT THAT PARKING, RENTAL, CAR AND DINING AND RETAIL WILL ALL BE VERY CLOSE TO THE 2019 LEVEL, AND THAT'S AN IMPORTANT PART OF OUR RECOVERY
  • SOME BUSINESSES LIKE GROUND TRANSPORTATION ARE STILL LAGGING
  • NEXT SLIDE, PLEASE
  • AND THIS IS THE NUMBERS OF OUR NON AEROAUTICAL BUSINESSES, AND YOU CAN SEE THE ACTUAL REVENUES REALLY HERE THAT WHILE THE CHART IS STRUCTURED TO COMPARE TO 2020, AND WE STILL SEE WE'RE DOWN FROM A REVENUE STANDPOINT 20 MILLION DOWN, BUT WE ARE AT NINE OF 19
  • SO OUR REVENUES REALLY ARE RECOVERING SLIGHTLY FASTER THAN THE PASSENGER LEVEL
  • AND I THINK THAT'S A KEY POINT, BUT THE BOTTOM BOTTOM LINE, WE'RE STILL DOING REASONABLY WELL, BUT WE WANT TO OBVIOUSLY INCREASE THAT
  • NEXT SLIDE, PLEASE
  • EXCUSE ME, BURIEN, I SEE YOU'RE GOING TO BE SPEAKING AGAIN AS THE LAST SPEAKER, AND I'M JUST NOTING THAT WHERE THREE MINUTES PASSED TIME AND I SEE YOU STILL HAVE QUITE A BIT MORE TO GO
  • I'M GOING TO SPEED UP HERE
  • I JUST WANTED TO NOTE, GIVE A TIME CHECK
  • THANK YOU
  • SO AERONAUTICAL COSTS, OUR AERONAUTICAL REVENUES ARE DRIVEN BY COST
  • AND I THINK THE STORY HERE IS LOOKING AT HOW WE'VE USED THE FEDERAL RELIEF GRANTS TO OFFSET THE OPERATING COSTS AND HOW WE'VE USED GRANTS AND PFCS TO OFFSET THE DEBT SERVICE
  • SO YOU CAN SEE THE BIG MESSAGE THERE IS WE'VE OFFSET WHAT WOULD OTHERWISE BE A $60 MILLION INCREASE IN DEBT SERVICE IN THE RATE BASE TO THE POINT WHERE IT'S ACTUALLY LOWER THAN 2020
  • AND SO THE OVERALL AERONAUTICAL REVENUES ARE UP 3%, WHEREAS NORMALLY THEY WOULD BE UP MUCH, MUCH HIGHER
  • NEXT SLIDE, PLEASE
  • THIS IS SOMEWHAT THE SAME VIEW
  • JUST LOOKING AT THE SPECIFIC COST CENTERS
  • AND WE DO SEE SOME BIG INCREASES FOR THE FIS OR FEDERAL INSPECTION SERVICES AREA, WHERE WE HAVE A NEW FACILITY COMING ON BOARD AND ALSO WITH THE TERMINAL
  • BUT THE AIRFIELD MOVEMENT AREA WHERE WE HAVE LANDING FEES WHERE WE CHARGE LANDING FEES IS ACTUALLY LOWER
  • NEXT SLIDE, PLEASE
  • SO I THINK WE'VE COVERED THIS ALREADY
  • I THINK THE KEY RISKS ARE THE RECOVERY AND THE FACT THAT WE HAVE THE PAYROLL VACANCY
  • AND OTHER THAN THAT, THERE IS NO CONTINGENCY IN THE OPERATING BUDGET
  • SO A SNOW EVENT IS SOMETHING THAT WE DO NOT BUDGET FOR
  • NEXT SLIDE, PLEASE
  • THIS IS THE BREAKOUT OF THE GRANTS, AND YOU CAN SEE HOW WE'VE SPENT THE MONEY BASED ON THE INDIVIDUAL PROGRAMS AND WHAT WE ARE EXPECTING FOR 2022
  • THE ORANGE IS THE AMOUNTS DESIGNATED FOR THE CONCESSIONNAIRES
  • NEXT SLIDE, PLEASE
  • THIS IS OUR ROAD TO RECOVERY, ON BUILDING OUR CASH BALANCE AND WE'RE RIGHT ON TRACK TO GET TO 18 MONTHS OF M BY 2024
  • NEXT SLIDE, PLEASE
  • AND OUR DEBT SERVICE COVERAGE
  • AGAIN, THE MESSAGE HERE IS HOW WE'VE USED THE FEDERAL RELIEF GRANTS TO REALLY IMPROVE OUR DEBT SERVICE COVERAGE
  • SO WE'RE AT A VERY STRONG LEVEL RIGHT NOW
  • NEXT SLIDE, PLEASE
  • AND THIS IS JUST THE VISUAL, A LITTLE ADDITIONAL LAYERS OF OUR FUTURE CAPITAL PROGRAM IN OUR EXISTING CAPITAL PROGRAM AND HOW WE BUILT UP AND THE PROJECTS THAT ARE DRIVING IT
  • AND AT THIS POINT, I'D LIKE TO TURN IT OVER TO KERI STEVENS TO TALK A LITTLE BIT MORE ABOUT THE SPECIFIC PROJECTS FOR NEXT YEAR
  • OKAY
  • THANKS, BORGAN
  • BORGAN, THANK YOU SO MUCH FOR PULLING THIS TOGETHER AND FOR PULLING US THROUGH THE LAST YEAR PART OF THIS FANTASTIC PLANNING
  • BUT I DO NEED TO QUICKLY ASK MY COLLEAGUES TO GO THROUGH
  • IF YOU HAVE ANY QUESTIONS FROM YOUR PRESENTATION, CLERK HART, COULD YOU GO THROUGH ONCE? THANK YOU
  • WE'LL BEGIN WITH COMMISSIONER BOWMAN
  • SORRY
  • I KEEP TRYING TO UNMUTE MYSELF
  • YEAH, I HAVE ACTUALLY THREE QUESTIONS IF I MIGHT BORGAN
  • I KNOW THAT WE'RE RUNNING SHORT ON TIME
  • SO IF YOU WANTED TO GET BACK TO ME LATER, THE FIRST ONE WAS ABOUT THE LONGER TERM GROWTH OF EMPLOYEES
  • I UNDERSTAND, OBVIOUSLY, WHEN WE'RE DOING THE 2019 BUDGET THAT THIS WAS SOMETHING THAT I HAD A GAP YEAR FOR LACK OF A BETTER TERM IN 2020
  • YOU GIVE US JUST SOME SORT OF INDICATION ABOUT WHAT YOU SEE THE GROWTH IN EMPLOYEES BEING OVER THE NEXT COUPLE OF YEARS
  • AND THEN THE SAME QUESTION FOR THE CPE
  • CERTAINLY, IT APPEARS IF I'M READING THIS CORRECTLY AND THAT FOR THE PUBLIC IS COST PER EMPLOYMENT, THAT THE FEDERAL GRANTS HAVE HELPED KEEP THE CPE AT A FAIRLY STEADY LEVEL
  • BUT I KNOW THAT LONGER TERM THAT WE WERE EXPECTING IT TO GET AS HIGH AS 18
  • $19
  • IS THAT CORRECT? YES
  • IN FACT, I WILL
  • AFTER CARRY PRESENTS ON THE CAPITAL PROGRAM, I'M GOING TO COME BACK AND HIGHLIGHT SOME OF OUR FORECAST INFORMATION, INCLUDING THE COST FOR EMPLOYMENT
  • BUT THE QUICK ANSWER IS BY 2026, WE EXPECT TO BE OVER $21
  • OKAY
  • AND THEN ON THE EMPLOYEES, THE EMPLOYEES
  • I'LL JUST SAY WE DON'T HAVE A SPECIFIC FORECAST AT THIS POINT
  • YEARS PAST, WE HAD A STAFFING STUDY, AND WE, IN ESSENCE, COMPLETED FULFILLING THAT
  • AND UNLESS LANCE WANTS TO OFFER ANY INSIGHTS, I THINK THAT THAT IS REALLY TO FOLLOW
  • I WILL SAY THAT WE HAD 19 FTES THAT WE HAVE RETAINED AS BEING FROZEN, THAT WE WILL LIKELY WANT TO FILL IN FUTURE YEARS
  • AND WE HAD 31 FTES THAT WE'VE COMPLETELY ELIMINATED
  • OF THOSE 51 FROZEN THAT WE RETAINED FROZEN, I CAN'T GIVE YOU A SPECIFIC NUMBER FOR A STAFFING FORECAST AT THE PORT IS VERY QUICK MARK ON THE STAFF IN STUDY, ESSENTIALLY TO COST 2022
  • SO WE HAVE TO DO ANOTHER STAFF INSTEAD OF 2023 AND BEYOND
  • OKAY
  • MAYBE THAT'S SOMETHING
  • I DON'T KNOW IF THERE'S MONEY FOR THAT, BUT I THINK WE SHOULD ALL BE INTERESTED IN THAT JUST IN TERMS OF OBVIOUSLY, AS YOU POINTED OUT THE COST FOR EMPLOYMENT IS THE SECOND HIGHEST OF OUR BUDGET ITEMS AND I GUESS WITHOUT GOING INTO A LOT OF DETAIL RIGHT NOW, UNDERSTANDING OR ALL OF THESE POSITIONS POSITIONS THAT YOU EXPECT THAT WE'RE GOING TO NEED OVER THE NEXT 15 YEARS
  • ARE THEY PERMANENT POSITIONS? AND THEN AGAIN WITH STAMP COMING ONLINE, WHAT YOU EXPECT TO SEE AND THEN MY LAST QUESTION, YOU DON'T HAVE TO ANSWER IT NOW UNLESS YOU CAN
  • WHY ARE WE NOT BUDGETING FOR SNOW? WELL, THE SIMPLE ANSWER ON SNOW IS HISTORICALLY IT WAS NOT A VERY COMMON OCCURRENCE, AND WE'VE GONE BACK OVER TEN TO 15 YEARS
  • AND IF IT WHEN WE BUDGET FOR IT, IT GOES INTO THE AIRLINE RATE BASE
  • AND SO WE DON'T LIKE TO CHARGE FOR SOMETHING THAT MAY NOT HAPPEN
  • AND SO WHAT WE'VE OPTED FOR IS TO NOT BUDGET FOR A MAJOR SNOW EVENT
  • IF A MAJOR SNOW EVENT HAPPENS, WE RECOGNIZE THAT WE'RE GOING TO HAVE TO TRY TO ABSORB IT
  • AND THAT'S WHAT WE'VE DONE THE LAST FEW YEARS
  • WE LIKE TO BLAME LANCE FOR THE REGULAR SNOW
  • WE'VE BEEN HAPPY AND RECENTLY BECAUSE IT NEVER HAPPENED BEFORE 2016
  • I WAS JUST GOING TO SAY WHEN I FIRST MOVED TO SEATTLE BACK IN 1991
  • YOU'RE RIGHT
  • IT WAS VERY RARE
  • BUT THAT HASN'T BEEN THE CASE IN THE LAST FIVE YEARS
  • THAT'S WHAT I WAS TOLD IN MY INTERVIEWS
  • I THINK MY TWO CENT IS WE SHOULD PERHAPS START BUDGETING FOR THAT
  • ALRIGHT, I'M DONE
  • THANK YOU VERY MUCH
  • THANK YOU, COMMISSIONER, ABOUT MY COMMISSIONER CALKINS FOR QUESTION
  • SO MY QUESTION IS SORT OF GENERALLY SPEAKING, I THINK WE HAVE KIND OF STEP INCREASES IN MANY OF OUR REVENUE AGREEMENT
  • SO I BELIEVE THAT'S THE CASE IN THINGS LIKE LEASES, WITH CONCESSIONNAIRES AND OTHER THINGS
  • I'M WONDERING WITH PARKING, HOW DO WE DETERMINE PARKING RATES? IS IT KIND OF DONE ON A YEARLY ADHOC BASIS? IS IT DONE AS A AN EXAMINATION OF MARKET CONDITIONS AND BASED ON WHAT I CAN BEAR? IS IT BASED ON HOW I'M SHOWING WE'RE GOING TO HIT HERE AND RELATIVE TO 19
  • SO I'M JUST WONDERING, DOES THIS BUDGET ALREADY ACCOUNT FOR SOME INCREASE IN THE PARKING RATES? ARE WE CONTEMPLATING THAT AND HAVEN'T BOOKED YET? WHAT ARE WE THINKING FOR THAT? AND ARE THERE OTHER AREAS WHERE WE DON'T HAVE STEPPED INCREASES TO SORT OF REFLECT THE JUST INFLATION GENERALLY
  • SO LET ME TRY TO ANSWER THAT IN A COUPLE OF WAYS
  • LET'S START WITH THE CONCESSION SIDE OF IT THERE
  • WE'RE REALLY LOOKING AT A PERCENTAGE
  • SO THEN WE GET A PERCENTAGE OF THE CONCESSION REVENUES
  • AND SO THAT IS REALLY DRIVEN BY THE PASSENGER LEVEL AND THE SPENDING THAT DRIVES OUR REVENUES
  • SO THAT WOULD BE TRUE FOR THE AIRPORT, DINING AND RETAIL
  • IT'S TRUE FOR THE RENTAL CARS
  • AND THEN YOU HAVE GROUND TRANSPORTATION, WHICH IS PIER TRIP FEES OFTEN
  • SO THOSE GO UP WITH PASSENGER LEVELS AS WELL
  • PARKING IS A LITTLE DIFFERENT BECAUSE WE RUN AND MANAGE THAT
  • AND ONE OF THE PROGRAMS THAT WE'VE HAD IS THE RESERVE PARKING
  • AND THAT IS A WAY OF TRYING TO STIMULATE DEMAND, TO GET PEOPLE TO BUY IN ADVANCE
  • AND ONE OF THE POSITIONS THAT WE HAVE FOR THIS COMING BUDGET IS A REVENUE ANALYST TO SUPPORT OUR PARKING PROGRAM
  • AND THAT'S REALLY TO LOOK AT SORT OF MANAGEMENT CONCEPTS AND TRYING TO LOOK TO OPTIMIZE WHAT WE CAN DO WITH THE GARAGE AND MAKE SURE WE ARE ABLE TO FILL IT IN THE ON PEAK TIMES AND AND REALLY DRIVE THE REVENUE ON THAT SIDE BECAUSE THAT'S REALLY UP TO US
  • BUT THERE'S NO, I'M NOT AWARE OF A PLANNED PRICE INCREASE ACROSS THE BOARD PER SE, BUT IT'S ONE OF THOSE THINGS THAT WE LOOK AT THE SUPPLY AND DEMAND AND HOW FULL THE GARAGE IS, AND CERTAINLY PRICES IS A TOOL
  • WE HAVE TO MANAGE THE GARAGE CAPACITY THAT CAN ALSO RESULT IN INCREASED REVENUES SO WORN
  • I BELIEVE THEY'VE GOT TO ADD TO THAT MISSION IN TERMS OF THE AGENTS
  • I THINK WE'VE ONLY HAD ONE SINCE I'VE BEEN RNM ALMOST SIX YEARS NOW THAT I'VE BEEN HERE
  • SO WE WERE ACTUALLY LOOKING AT A PRICE INCREASE JUST PIER TO THE PANDEMIC
  • BUT THEN THE PANDEMIC HAPPENS, SO WE DIDN'T THINK IT WOULD BE APPROPRIATE TO DO A PRICE INCREASE DOING THAT
  • AND ALSO WHAT WE TRY TO DO WHEN WE'RE DOING A PRICE INCREASE FOR PARKING IS WE TRY TO DO IT, FOR EXAMPLE, IN A NEW SERVICE COMES ON BOARD
  • SO FOR EXAMPLE, WHEN WE PUT THE PARKING GUIDANCE SYSTEM IN PLACE, THAT PROBABLY WOULD BE AN APPROPRIATE TIME TO LOOK AT HAVING A PRICING IS BECAUSE WE'RE GOING TO HAVE FAR NEW LEVEL OF SERVICE IN THE PARKING GARAGE AT THAT POINT AND WE'LL BE ACTUALLY TAKING ON ADDITIONAL EXPENSES OF A PARKING AT THAT POINT
  • SOME CHANCES ARE THAT'S WHEN WE'RE GOING TO LOOK AT IT AND WE'LL BE SOMEWHAT OVER THE PANTS, HOPEFULLY OVER THE PENDING MAKE UP THAT TO ME
  • THANK YOU
  • I THANK YOU
  • COMMISSIONER CALKINS MOVING TO COMMISSIONER CHO YEAH, JUST A FEW QUESTIONS fOR YOU
  • THANKS FOR THE PRESENTATION
  • FIRST, I WANTED TO GET SOME CLARITY ON THIS PAYROLL VACANCY FACTOR OF 5%
  • CAN YOU JUST REAL QUICKLY FOR MY EDUCATION EXPLAINING WHAT EXACTLY THAT MEANS AND WHY WE'VE TAKEN WE'VE INCREASED THAT
  • DOES THAT MEAN WE'RE NOT WE'RE NOT EXPECTING AS MUCH
  • SO WHAT IT IS IS BASICALLY IF WE BUDGET FOR OUR STAFF FOR 2022 AND IF WE ASSUME WE WILL BE AT FULL FULL STAFFING IN THE ENTIRE YEAR, WE WOULD HAVE A VACANCY
  • ALRIGHT, BECAUSE WE'RE PAYING EVERYBODY AND OUR BUDGET HAS TO REFLECT WHAT WE'RE GOING TO PAY
  • BUT WHAT WE'VE DISCOVERED OVER MANY YEARS IS THAT THERE'S ALWAYS A CERTAIN AMOUNT OF ATTRITION PEOPLE LEAVE THE ORGANIZATION AND IT TAKES TIME TO FILL THOSE POSITIONS
  • SO WE HAVE GAPS AND THOSE GAPS OR THE TIME FRAME
  • WE ACHIEVE SOME SAVINGS BECAUSE WE ACTUALLY ARE BELOW OUR STAFFING LEVEL FOR A VARIETY OF REASONS
  • AND SO IF WE WENT BACK A FEW YEARS, I THINK WE WERE AT THREE TO THREE AND A HALF PERCENT WAS WHAT WE WERE USING
  • AND THEN WE DROPPED IT SIGNIFICANTLY FOR 2021 BECAUSE WE DIDN'T EXPECT MUCH TURNOVER BECAUSE WE CUT SO MANY POSITIONS
  • AND IT WAS SUCH A WE THOUGHT A TIGHT JOB MARKET
  • BUT WE'VE ACTUALLY SEEN A FAIR AMOUNT OF ATTRITION THIS YEAR AND JUST THE DEMOGRAPHICS OF THE ORGANIZATION
  • THERE ARE A LOT OF PEOPLE THAT ARE NEAR OR AT RETIREMENT LEVEL
  • AND YOU'VE PROBABLY READ ABOUT THE GREAT RESIGNATION THAT A LOT OF COMPANIES ARE SEEING
  • AND SO THERE IS A LOT OF TURNOVER, AND IT CAN BE VERY CHALLENGING TO FILL THOSE POSITIONS
  • SO RIGHT NOW, THE 5% VACANCY FACTOR IS BEING IMPLEMENTED PORT WIDE
  • I THINK DAN THOMAS EXPLAINED THAT A COUPLE OF WEEKS AGO AND WE THINK IT'S REASONABLE FOR THE WORLD AND THE ECONOMIC ENVIRONMENT WE'RE IN
  • SO THAT PART OF THE CALCULATION MAKES SENSE TO ME
  • I THINK THE STATISTIC THAT CAME OUT THIS MORNING WAS IN AUGUST 3% OF AMERICA'S WORKFORCE RESIGN, WHICH IS EXTREMELY SIGNIFICANT
  • SO THAT MAKES SENSE TO ME
  • BUT THE PART THAT THAT I DON'T SEE FACTOR IN THIS IS THAT WITH ATTRITION ALSO COMES THE COST OF ONBOARDING NEW PEOPLE
  • SO HOW DO WE ACCOUNT FOR THAT COST? WELL, THAT IS A CHALLENGE
  • I MEAN, THE COST OF ON BOARDING IS REALLY THE TIME THAT TAKES TO HIRE AND TRAIN SOMEBODY NEW
  • AND WHAT THE COST, IF YOU WILL, IS USUALLY IN WHAT'S NOT GETTING DONE
  • TO BE HONEST, BECAUSE THERE IS A FINANCIAL SAVINGS
  • BUT IT JUST MEANS THAT WHAT WE WERE HOPING THAT INDIVIDUAL WOULD DO, THAT INDIVIDUAL IS NOT AVAILABLE TO DO
  • SO THAT I THINK IS THE COST OKAY
  • AND THEN THIS IS NOT A BUNCH OF QUESTIONS, MORE LIKE AN HR QUESTION AND MAYBE FOR STEVE, BUT IT WOULD BE GREAT IF WE CAN GET A SENSE OF WHAT THE NUTRITION HAS BEEN LIKE FOR US TO THE PORT AND WHETHER THAT TRACKS WITH WHAT'S HAPPENING IN THE BROADER LABOR MARKET
  • I THINK MY HYPOTHESIS WOULD BE THAT THERE'S A LITTLE MORE STICKINESS AT AIRPORTS BECAUSE THERE AREN'T A LOT OF OPTIONS OUTSIDE OF D
  • SO IT LOOKS LIKE STEVE WAS 91 TO RESPOND REAL QUICKLY
  • YEAH
  • MY MIND JUST COMMISSIONER
  • I WAS JUST BASED ON THE OTHER QUESTIONS FROM COMMISSIONER BOWMAN AS WELL
  • I THINK WE CAN TALK ABOUT KIND OF THE OVERALL VIEW OF OUR WORKFORCE AND SOME OF THOSE FACTORS AND DRIVERS
  • AND REALLY, FOR US, IT'S A BIG FOCUS OF US BECAUSE OF THE DIFFERENT FACTORS ABOUT THAT
  • BUT ALSO COMING OUT OF THESE LAST COUPLE OF YEARS, THE CHALLENGES THAT ARE LAYERED UPON THAT AND ABOUT BRINGING PEOPLE ON SO NOT TO DO IT, NOT TO DIVE INTO IT NOW
  • BUT I CAN TALK MORE ABOUT THAT IN MORE INFORMATION ABOUT OUR APPROACH TO THAT AND OUR FORECAST GOING FORWARD
  • YEAH
  • I THINK FOR MOST JOBS AND ASSOCIATED COSTS, I'M SORRY TO STEP IN THERE
  • RIGHT
  • I WOULD ARGUE THAT MOST JOBS PEOPLE CAN TRANSITION PRETTY SIMILARLY
  • BUT RUNNING OUR AIRPORT IS PRETTY NICHE
  • I WOULD SAY EVERY AIRPORT IS DIFFERENT
  • AND SO I WOULD IMAGINE THERE'S A HUGE COST TO GETTING FOLKS ON BOARDED
  • THE OTHER QUESTION I HAD BROKEN JUST FOR MY EDUCATION IS IS THE DEBT SERVICE COVERAGE RATIO? YES
  • IT'S SIMPLY IF WE LOOK AT THE AMOUNT OF DEBT SERVICE THAT WE HAVE TO PIER THE COVERAGE IS THE PERCENTAGE ABOVE THAT
  • SO IF IF THE DEBT SERVICE IS 100 MILLION AND WE CAN DEMONSTRATE THAT WE HAVE 150,000,000 OF CASH AVAILABLE, THAT WOULD BE THAT WOULD BE 1.5 COVERAGE OR ONE OF OUR REQUIREMENT
  • SO WHAT WE'RE SHOWING IS 1.9 THAT IS ALMOST DOUBLE THE AMOUNT THAT WE NEED TO PAY THE DEBT SERVICE
  • THAT'S A VERY STRONG RATIO
  • BUT IF YOU GO BACK AND LOOK AT THE CALCULATION, IT IS HIGHLY DRIVEN BY THE FACT THAT WE ARE USING GRANTS AND PFCS TO PAY THE DEBT SERVICE DIRECTLY TO BRING DOWN THE NET AMOUNT
  • AND THIS IS A COVERAGE CALCULATION THAT IS REALLY USED FOR OUR AIRLINE AGREEMENT
  • AND THAT COVERAGE CALCULATION
  • IT'S A SLIGHTLY DIFFERENT CALCULATION THAT IS DONE ON A PORT WIDE BASIS JUST BECAUSE OF THE WAY THE GRANTS AND THE PFC ARE TREATED AS REVENUE AS OPPOSED TO AN OFFSET TO DEBT SERVICE
  • SO THIS IS 1.91 DEBT COVERAGE
  • DO YOU KNOW OFF THE TOP OF YOUR HEAD HOW MUCH OF THAT IS FEDERAL GRANTS? WHERE WOULD WE BE IF WE DIDN'T RECEIVE FEDERAL GRANTS? I WILL SHOW YOU THAT CALCULATION
  • I'LL SHOW YOU THE NUMBERS IF WE GO BACK A COUPLE OF SLIDES AND I THINK IT WILL BECOME A PARENT RIGHT HERE
  • YEAH
  • NEXT SLIDE, PLEASE
  • ALRIGHT
  • SO IF YOU LOOK IN THE 2022 COLUMN AND YOU SEE NEAR THE VERY BOTTOM, IT SAYS FEDERAL RELIEF GRANTS USED TO PAY DEBT SERVICE THE 66 MILLION
  • SO IF WE TOOK THAT OUT AND REDID THE CALCULATION, WHICH I WON'T DO RIGHT NOW, BUT YOU'D SEE WHERE WE END UP, WE STILL END UP IN A PRETTY GOOD PLACE, BUT NOWHERE NEAR 1.9, IT LOOKS LIKE AROUND ONE POINT 35, WHICH IS KIND OF OUR TARGET ANYWAY, RIGHT? YEAH
  • OKAY
  • ALRIGHT
  • THAT'S IT FOR ME
  • THANK YOU
  • THANK YOU
  • COMMISSIONER CHO COMMISSIONER STEINBRUECK YEAH
  • THANK YOU VERY MUCH
  • BORGAN FOR GETTING US THROUGH INCREDIBLY DIFFICULT YEAR FINANCIALLY AND OTHERWISE
  • IT'S REMARKABLE WHAT YOU'VE ACHIEVED AND STAFF AT THE AIRPORT
  • I THINK IT'S A BIT OF WORK OF MAGIC, BUT OF COURSE, WHAT WOULD I KNOW AND THE FEDERAL RELIEF CERTAINLY WAS OF GREAT HELP
  • I CAN SEE THAT I WANTED TO ASK YOU WITH REGARDS SPECIFICALLY TO THE CAPITAL PROGRAM GROWTH INJECTION
  • HOW ARE WE ACCOMMODATING THAT GROWTH WITH REGARD TO ADMINISTRATIVE SERVICES OF THE ARCHITECTS OFFICE OF THE AIRPORT, INCLUDING DESIGN REVIEW, QUALITY CONTROL, PROJECT OVERSIGHT COORDINATION, ETC
  • AND WHAT DO YOU PROJECT IN TERMS OF ANY ADDITIONAL STAFF SUPPORT IN THAT AREA? OKAY
  • BIG QUESTION
  • I'LL START BY SAYING WE HAVE AND ARE ADDING RESOURCES THROUGHOUT THE ORGANIZATION TO SUPPORT THE CAPITAL PROGRAM
  • I WILL HAVE TO GET BACK TO YOU ON THE SPECIFICS AS IT RELATES TO THE THE ARCHITECTURAL PROGRAM
  • I BELIEVE WE ARE ADDING AN FTE, BUT I HAVE TO GO BACK AND LOOK, DO I SEE A HAND UP THERE? IS THAT PERHAPS, JEFFREY? YEAH
  • GO AHEAD, PLEASE
  • YOU'RE RIGHT
  • HAVING SOME POSITIONS FOR ADMINS ON POSITIONS IN THOSE AREAS
  • COMMISSION STEINBRUECK, BUT WE HAVE TO BALANCE OUR FTE NEEDS ACROSS THE BOARD
  • I MEAN, WE CAN GIVE ALL THE FTES TO ONE DEPARTMENT
  • WE HAVE TO BALANCE OPERATIONAL THE CAPITAL GROWTH
  • SO WE ARE RIVER STRATEGIC AND MATCHING UP OUR NEEDS AND ARCHITECTURAL OFFICE DESIGN REVIEW
  • WE HAVE DONE SOME WORK AROUND IMPROVEMENTS WORKING WITH ARE TEAM AROUND IMPROVEMENTS IN DESIGN REVIEW, AND WE HAVE STARTED TO IMPLEMENT THAT
  • SO WE'RE ADJUSTING THOSE NEEDS
  • NOT PROBABLY TOTALLY THAT YOU OR OTHER PEOPLE TO EXPECT, BUT WE HAVE TO BALANCE OUR NEEDS
  • SURE, I UNDERSTAND THAT
  • BUT THIS IS NOT TO ME AN ISSUE OF EQUITABLE DISTRIBUTION OF FTES
  • IT'S AN ISSUE OF WHAT AREAS OF PLAN FUTURE DEVELOPMENT REQUIRE ADDITIONAL SUPPORT THAT SHOULD BE VIEWED INDEPENDENTLY OF OTHER FTE NEEDS IN TERMS OF HOW WE CAN BEST ACCOMMODATE THE NECESSARY SERVICE REQUIREMENTS THAT ARE CALLED FOR WITH THE GROWTH IN CAPITAL, THE PERMISSION
  • WE'RE BALANCING THAT WITH FTE AND CONSULTANT REQUEST, WE MIGHT WANT TO TALK A LITTLE BIT OF OKAY, WE CAN FOLLOW UP WITH THAT
  • THANK YOU
  • OKAY
  • THANK YOU
  • COMMISSIONER STEINBRUECK
  • COMMISSIONER FELLEMAN
  • THANK YOU
  • AGAIN, I SAW THERE WAS, LIKE, 975,000,000 FOR AIR SERVICE INCENTIVES
  • WHAT DOES THAT ENTAIL? WE HAVE A AIR SERVICE DEVELOPMENT PROGRAM, AND WHEN A CARRIER IMPLEMENT A NEW SERVICE, THEY CAN QUALIFY FOR AN INCENTIVE
  • AND SO WE PROVIDE SOME MARKETING AND SUPPORT COSTS TO THE AIRLINE
  • SO IT'S A COST TO THE AIRPORT
  • AND IT'S HELPING A CARRIER PRIMARILY INTERNATIONAL
  • ALTHOUGH A DOMESTIC CAN QUALIFY AS WELL
  • AND IT ALLOWS THEM TO MARKET THAT NEW SERVICE TO HELP GET IT ESTABLISHED
  • AND THAT'S SOMETHING THAT WE'VE HAD THIS PROGRAM IN PLACE FOR MANY YEARS
  • AND CASO SATA AND HER TEAM WOULD SAY THAT THIS IS A REALLY IMPORTANT PART OF ATTRACTING NEW INTERNATIONAL SERVICE
  • AND SO BECAUSE WE'VE BEEN SUCCESSFUL IN ATTRACTING NEW SERVICE IN RECENT YEARS, THAT'S WHY THE MONEY IS INCLUDED IN THE BUDGET
  • IT'S REALLY A REQUIREMENT TO FULFILL OUR CONTRACTUAL OBLIGATIONS
  • SO YOU REALLY THINK THAT THAT'S GOING TO MAKE THE DIFFERENCE BETWEEN AN AIRLINE? I MEAN, I COULD SEE WHY IT'S BENEFICIAL, BUT DO YOU REALLY THINK THAT THAT'S WHAT'S GOING TO MAKE A DECISION FOR AN AIRLINE TO START A NEW SERVICE HERE? I DON'T KNOW
  • LAST WOULD YOU LIKE TO I COULD JUMP IN HERE FOR SOME OF THE AIRLINES
  • IT PROBABLY WON'T BECAUSE THEY'VE DONE THEIR CALCULATION AND THEY'LL DETERMINE WITH US THEY'RE GOING TO MAKE A PROFIT OR ONE AIRLINE RECENTLY TOLD US THEY CHOSE VANCOVER OVER US BECAUSE THEY HAD A BETTER INCENTIVES PACKET
  • I DON'T KNOW HOW TRUE THAT IS
  • BUT IT'S AN EXPECTATION FROM THE AIRLINES EVERY YEAR FOR EVERY AIRPORT HAS THIS INCENTIVE PROGRAM IS NOT JUST US, AND IT REALLY HELPS THEM TO GET OVER THE INITIAL HOME, BECAUSE WHEN AN AIRLINE THE SIDE, FOR EXAMPLE, THEY'RE GOING TO DO A LONG, HARD ROAD
  • YOU'RE TALKING A MAJOR INVESTMENT FOR THEM TO DO IT
  • AND IT'S A SIGNIFICANT BENEFIT NOT TO WHATEVER REGION OR CITY THAT THEY'RE CHOPPING TO
  • SO IT'S REALLY KIND OF EXPECTED
  • WHAT ABOUT IT WILL MAKE THE DIFFERENCE? I DON'T KNOW WHAT IT'S EXPECTED FROM THE AIRLINES ANYWAY
  • IT'S A COMMON PRACTICE ACROSS AIRPORTS
  • YES
  • ALRIGHT
  • THAT'S FINE
  • I TAKE SOME QUESTION ABOUT HOW THESE DIFFERENT COST CENTERS ARE ALLOCATED
  • LIKE WE HAVE THE A CONFERENCE ASSOCIATED WITH A COMMUNITY COMMUNITY COST
  • I'M NOT SURE IS THAT BUSINESS DEVELOPMENT RATHER THAN A COMMUNITY ASSET
  • SO THE MONEY IS THE SAME
  • BUT THE FACT THAT IT'S ALLOCATED TO COMMUNITY SEEMS TO BE A LITTLE ODD, AT LEAST AS I UNDERSTAND OUR COMMUNITY PROGRAMS IS THERE ANY THOUGHTS ON THAT? WELL, I THINK HOW WE CATEGORIZE IT
  • YOU'RE RIGHT
  • WE COULD HAVE PUT IT IN A COUPLE OF DIFFERENT PLACES, BUT I THINK THAT IT'S CERTAINLY SOMETHING THAT IS BRINGING A BIG CONFERENCE TO SEATTLE
  • IT'S HIGHLIGHTING THE IMPORTANCE OF THE AIRPORT, AND I THINK IT'S A STRONG ECONOMIC DEVELOPMENT CONTRIBUTION TO THE REGION
  • SO, BORGAN, I COULD ADD TO THAT
  • AND WE COULD REWRITE COMMISSIONER, WE COULD PUT IT IN SEVERAL OTHER CATEGORIES WHERE YOU'RE LOOKING AT ABOUT 2500 PEOPLE COME INTO THIS CONFERENCE IS GOING TO BE MAJOR BENEFITS FOR ALL THE RESTAURANTS THAT'S GOING TO BE IN THE VICINITY OF THAT CONFERENCE
  • THE GROUND TRANSPORTATION, WHERE THE TAXI, UBER
  • THERE'S GOING TO BE HUGE BENEFITS TO THE COMMUNITY
  • BUT WE COULD PUT IT IN OTHER CATEGORIES AS WELL
  • YEAH, I UNDERSTAND
  • I APPRECIATE THAT EXPLANATION
  • IT'S JUST, YOU KNOW, THERE'S I GUESS MAYBE WHAT WE SHOULD DO IS HAVE, LIKE, SORT OF LITTLE DEFINITIONS OF WHAT THESE CATEGORIES MEAN
  • BECAUSE WHEN WE THINK ABOUT IN MY MIND, OUR COMMUNITY PROGRAMS ARE OFTEN THINGS THAT ARE, WELL, THESE ARE SPECIFICALLY THINGS THAT ARE NOT PAID FOR BY THE TAX LEVY
  • RIGHT
  • JUST EVEN DEFINING THAT AS THESE ARE NON LEVY COMMUNITY PROGRAMS, WHICH WOULD BE MORE OF THIS ECONOMIC DEVELOPMENT BENEFITS
  • SO I MEAN, I GUESS JUST THE CLARITY OF THE DEFINITION OF THOSE CATEGORIES MIGHT BE HELPFUL FOR CERTAINLY FOR ME
  • YEAH
  • COMMERCIAL
  • I THINK NORMALLY UNDER THE COMMUNITY CATEGORY, WE LOOK AT THE STUFF THAT WE DO TO MITIGATE THE IMPACT AT THE AIRPORT
  • THERE'S NOISE POLLUTION, ET CETERA
  • BUT WE ALSO MUST REMEMBER THAT THERE ARE BENEFITS TO THE PORT, THE COMMUNITY AS WELL FROM THE AIRPORT
  • AND THIS IS ONE OF THE BENEFITS
  • AND CLEARLY AND THOSE OTHER PROGRAMS YOU JUST DEFINED WOULD NOT BE IN THIS BUDGET
  • THAT WOULD BE IN THE TAX LEVY BUDGET
  • IS THAT TRUE? CORRECT
  • WOULD THEY BE REFLECTED IN HERE AS WELL, THE MITIGATION EFFORTS? YEAH
  • A LOT OF THE MITIGATION EFFORT WOULD BE REFLECTED OR IS REFLECTED IN THIS BUDGET
  • THE NOISE PROGRAM INVESTMENTS ARE TYPICALLY CAPITAL PROJECTS WHEN WE GO AND INSULATE POEMS OR CONDOMINIUMS OR THE LIKE
  • WE GET AN EASEMENT FOR THOSE
  • AND SO WE BOOK IT AS AN ASSET
  • AND SO THE MAJOR ELEMENTS OF OUR NOISE PROGRAM OR CAPITAL AND ALL THE EFFORTS THAT WE'RE DOING AS PART OF START IS THE NOISE FROM THE NOISE OR WORKING GROUP ARE THE POLICY WORKING GROUP THAT'S REFLECTED IN OUR OPERATING
  • PUT IT WELL, THE OPERATES IN RELATED STUFF IN THE THANK YOU FOR THAT CLARIFICATION
  • THEN I KIND OF THINK THAT THAT CATEGORY IS PERHAPS TOO BROAD
  • YOU KNOW, THEY ALL HAVE TO MAKE COMMUNITY BENEFITS, BUT THEY'RE VERY DIFFERENT
  • MAYBE THEY SHOULD COULD BE ECONOMIC BENEFITS VERSUS, YOU KNOW, MITIGATION BENEFITS
  • SO WE CAN RELOOK AT HOW WE CATEGORIZE UP OR
  • OKAY
  • THANK YOU
  • I JUST ALSO NOTE THAT WE'RE TALKING ABOUT A REDUCTION IN ENVIRONMENTAL LIABILITY
  • HOW DID THAT HAPPEN? SO THE ENVIRONMENTAL REMEDIATION LIABILITY AT THE AIRPORT IS VERY DRIVEN BY SPECIFIC CAPITAL PROJECTS, AND IT'S A CALCULATION THAT WE DO BASED ON WHAT WE ANTICIPATE TO BE THE TRIGGERING EVENTS
  • AND IT'S USUALLY ASBESTOS
  • IF WE'RE GOING INTO AN OLD FACILITY AND SOME YEARS WE HAVE A PROJECT THAT TRIGGERS SOME VERY SIGNIFICANT COSTS IN OTHER YEARS, LIKE NEXT YEAR, WE ACTUALLY DON'T ANTICIPATE ANYTHING REALLY BIG HAPPENING
  • WE'VE ALWAYS GOT SOME ONGOING ASBESTOS PROGRAM COSTS, BUT WE DON'T SEE ANY MAJOR TRIGGERING EVENTS NEXT YEAR
  • SO THAT'S WHY IT'S LOWER
  • SOUTH SATELLITE WOULDN'T HAVE IT'S NOT OF THAT VINTAGE
  • WELL, WE HAVE HAD SOME SOUTH SATELLITE REMEDIATION ALREADY GOING FORWARD
  • WHEN WE GET TO A POINT WHERE WE HAVE A TRIGGERING EVENT AND A TRIGGERING EVENT IS WHEN YOU OPEN UP A LAW AND THERE'S ASBESTOS BACK THERE
  • NOW YOU HAVE TO REMEDIATE IT
  • SO THAT TRIGGERS THE LIABILITY
  • THE FACT THAT WE'RE PLANNING TO DO IT DOESN'T TRIGGER THE LIABILITY
  • OKAY
  • SO THEN IT BECOMES A SURPRISE
  • WELL, IT BECOMES A FUTURE
  • EACH YEAR WE BUDGET FOR WHAT WE KNOW AT THE TIME
  • IN THE FUTURE, THERE WILL BE MORE ENVIRONMENTAL REMEDIATION LIABILITY
  • IT'S JUST THAT FOR 2022 BASED ON WHAT WE KNOW RIGHT NOW IT'S LOWER, BUT THAT'S A NUMBER THAT I I HATE TO SAY IT SORT OF IS WHAT IT IS BASED ON WHAT THE PROJECTS ARE DOING
  • THE BORG, I'M ABLE TO CLARIFY FOR THE OUTSET AS AN EXAMPLE, IF WE'RE GOING INTO CONSTRUCTION NEXT YEAR, THAT NUMBER WOULD BE HIGHER, BUT WE'RE NOT GOING TO GO INTO CONSTRUCTION NEXT YEAR
  • WE'RE STILL GOING TO BE IN PLANNING ON DESIGN, CORRECT
  • THAT'S THE BEST EXPLANATION
  • YES
  • ALRIGHT
  • SO THANK YOU
  • AND I STILL JUST LOOKING AT TRYING TO SEE IF THERE'S I DON'T SEE ANYTHING BUDGETED AGAIN FOR STAFF OR OTHER KIND OF IN THE ENVIRONMENTAL CATEGORY
  • SO I STILL FEEL THAT WE ARE LACKING IN OUR IMPLEMENTATION OF THE SLOW MOU
  • SO I'M HOPING TO SEE AN ONGOING A SOURCE OF SOME INVESTMENT THERE MAYBE BECAUSE I RAN OVER THAT SLIDE TOO FAST
  • WE'RE GOING TO CONTINUE, I THINK, TO ADVOCATE FOR A AND WE PROBABLY MISSED ON A COUPLE OF SITES, BUT I SEE A HAND UP SOMEONE
  • AND IF IT'S ONE OF THE ENVIRONMENT PEOPLE LEFT ON THE CALL
  • NO, IT'S COMMISSIONER BOWMAN
  • I WAS JUST GOING TO POINT OUT THAT IF I'M READING MY CALENDAR RIGHT, WE HAVE A HALF AN HOUR AND WE HAVE TWO MORE BUDGETS TO GET THROUGH
  • THAT'S CORRECT
  • YEAH
  • AND THAT'S CLEARLY THE CASE, SO WE CAN MOVE FORWARD
  • BUT WE ALL HAD QUESTIONS TO ASK, INCLUDING YOU, STEPHANIE
  • SO THANK YOU
  • LET'S MOVE FORWARD
  • OKAY
  • TURNING IT OVER TO KERI STEVENS
  • OKAY
  • THANKS, BORGAN
  • GOOD MORNING, COMMISSIONERS
  • I'M CARRY STEVENS WITH THE AVIATION CAPITAL PROGRAM MANAGEMENT TEAM
  • NEXT SLIDE, PLEASE
  • SO LAST YEAR, AROUND THIS TIME, WE PROVIDED A PREVIEW OF SOME OF THE LARGER PROJECTS FOR INCLUSION INTO THE CAPITAL PLAN
  • WE'D LIKE TO DO THAT AGAIN THIS YEAR
  • BUT FIRST, WE WANT TO GIVE A BRIEF UPDATE OF SOME OF THE PROJECTS THAT WE DISCUSSED LAST YEAR AND LET YOU KNOW HOW THEY PROGRESSED
  • I'M GOING TO ZOOM THROUGH THESE NEXT SLIDE PRETTY QUICKLY BECAUSE I THINK WE'RE KIND OF TIME LIMITED AND AND I THINK YOU GUYS ARE PRETTY WELL EDUCATED ON THIS
  • BUT C ONE BUILDING, OF COURSE, THIS IS THE FOUR STORY EXPANSION OF THE C ONE BUILDING
  • DESIGN IS MOVING ALONG VERY WELL RIGHT NOW
  • WE'RE EXPECTING 30% BY THE END OF THE YEAR
  • THIS IS LANCE HAD SAID EARLIER
  • THIS IS OUR FIRST MAJOR PROJECT THAT HAS GONE THROUGH THE SUSTAINABILITY FRAMEWORK, AND THE TEAM WILL BE PRESENTING THAT THE SUSTAINABILITY ELEMENTS IN DETAIL AT THE NEXT SUSTAINABILITY COMMITTEE MEETING
  • I THINK IT'S ACTUALLY NEXT WEEK
  • AND ALSO THIS IS A GCC DELIVERY METHOD
  • WE'VE GOT BOTH THE DESIGNER AND THE CONTRACTOR ON BOARD NOW AND PROVIDING CONSTRUCTIBILITY REVIEWS IN REAL TIME ESTIMATES AS THE DESIGN DEVELOPS
  • OKAY
  • NEXT SLIDE, PLEASE
  • NORTH MAIN TERMINAL PROJECT
  • YOU GUYS KNOW THIS ONE, TOO? THIS ONE IS ALASKA AIRLINES HAS BEEN DEVELOPING THIS
  • THIS ONE'S BEEN MOVING ALONG VERY FAST
  • WE'RE EXPECTING 30% DESIGN AT THE END OF THIS WEEK AGAIN, JUST TO GIVE YOU A LITTLE BIT OF INFORMATION ON THE SCOPE
  • THIS INCLUDES NEW PROMENADE, BUILDOUTS, ADA COMPLIANT RAMPS ON THE BACK CLAIM LEVEL, EXPANSION OF THE PASSENGER SCREENING CHECKPOINT, AND THEN JUST REALLY MUCH MORE GRAND HALL
  • LOOK FOR ALASKA'S TICKETING AREA
  • WE EXPECT IN THE NEXT COUPLE OF COMMISSION MEETINGS TO HAVE A REQUEST FOR 100 DESIGN COMING THROUGH
  • AND THEN WE'RE EXPECTING THAT THIS WOULD BE COMPLETE IN THE 220 AND 25 RANGE
  • NEXT SLIDE, PLEASE
  • SO CONCOURSE A BUILDING EXPANSION FOR LOUNGES
  • THIS WAS SOMETHING THAT WE TALKED ABOUT LAST YEAR AS WELL
  • DELTA, OUR ALLIANCE IS DEVELOPING THIS PROJECT, BASICALLY EXPANDING THE BUILDING OFF OF THE BACKSIDE OF THE CONCOURSE
  • THAT EXPANSION ALLOWS FOR THE CLUB AT A CLUB AT SEA TO BUILD OUT AS WELL AS A NEW DELTA LOUNGE
  • DELTA CURRENTLY IS CLOSING IN ON AROUND 60% DESIGN AND THEY WILL BE OR WE WILL BE COMING FOR AUTHORIZATION
  • REQUEST FOR CONSTRUCTION AT THE END OF THE YEAR AND THIS IS ANTICIPATED TO BE COMPLETE BY 2023
  • NEXT SLIDE, PLEASE
  • SO SOUTH SATELLITE RENOVATION PROJECT
  • WE'RE REALLY DEEP INTO THE PROJECT DEFINITION DOCUMENT
  • THE PDD PHASE
  • WE ARE STARTING TO DEVELOP OUR PROJECT PHASING AND AS WELL AS GOING DEEPER INTO OUR PROJECT ESTIMATES, IT'S A COMPLEX PROJECT THAT WILL COMPLETELY UPGRADE THE FACILITY STRUCTURE AND UTILITIES AS WELL AS THE LOWER FLOORS WHERE THE FIS CURRENTLY IS
  • UNLIKE THE NORTH SATELLITE, WILL NOT HAVE THE ABILITY TO MOVE INTO AN EXPANDED SPACE WHILE WE RECONSTRUCT THE MAIN BODY OF THE FACILITY
  • WE'RE GOING TO BE BASICALLY BUILDING IN THE FACILITY AS EVERYBODY IS UTILIZING THAT
  • SO THIS WILL MAKE THE PHASING MORE CHALLENGING AND LEAD TO MOST LIKELY SOME LONGER TIME FRAMES FOR CONSTRUCTION
  • RIGHT NOW THE PROJECT IS ANTICIPATED COMPLETION INTO 29
  • NEXT SLIDE, PLEASE
  • I SO THE A CONQUERS DUTY FREE
  • WE DISCUSSED THIS LAST YEAR AS WELL
  • WE'RE REALLY EXCITED ABOUT GETTING THIS PROJECT OFF THE GROUND
  • WE'VE CURRENTLY COMPLETED OUR PHASE ONE PDD AND WE'RE GOING TO BE REQUESTING ACTUALLY AT THE NEXT COMMISSION MEETING, WE'RE GOING TO BE REQUESTING AUTHORIZATION TO GO INTO OUR PHASE TWO PDD
  • THIS PROJECT WILL PROVIDE A MUCH MORE IMMERSIVE DUTY FREE EXPERIENCE AND ASSIST US WITHIN INCREASING OUR DUTY FREE REVENUE
  • CURRENTLY, WE'RE ANTICIPATING COMPLETION IN 2026
  • OKAY
  • NEXT SLIDE, PLEASE
  • OKAY
  • SO THAT WAS THE PROJECT FROM LAST YEAR
  • NOW I WANT TO SHIFT TO THE PROJECTS THAT WE PUT INTO THIS YEAR'S CAPITAL PLAN
  • NEXT SLIDE, PLEASE
  • SO AS YOU KNOW, THE MAIN TERMINAL IS DATED AND COMING ON AROUND 50 YEARS WITHOUT A MAJOR RENEWAL REPLACEMENT
  • WE'VE HAD QUITE A FEW INDIVIDUAL RENEWAL PROJECTS ALREADY IN THE CAPITAL PLAN, BUT WE SAW THE NEED TO TAKE A MORE PROGRAMMED APPROACH TO PROVIDE FOR ALL THE WORK IN A MORE EFFICIENT AND COMPREHENSIVE MANNER
  • WE ALSO TOOK A LOOK AT OUR RENEWAL ELEMENTS THAT WERE NOT YET IN THE CAPITAL PLAN BUT WOULD BE SOON COMBINING ALL OF OUR CODE AND RENEWAL WORK TOGETHER INTO A COHESIVE PROGRAM AND TAKING INTO ACCOUNT HOW NORTH MAIN TERMINAL RENOVATION WILL CHANGE THE AESTHETIC AND INFRASTRUCTURE ON THE NORTH END
  • WE DEVELOPED OUR MAIN TERMINAL IMPROVEMENT PROGRAM
  • THIS PROGRAM IS BUILT ON SPECIFIC SCOPE THAT WAS ALREADY IN THE CAPITAL PLAN, PRIMARILY THE SPRINKLER AND SMOKE CONTROL WORK, WHICH FORMS THE MAJORITY OF THE SCOPE
  • OUR PLAN IS TO REQUEST DEVELOPMENT OF THE PROJECT DEFINITION DOCUMENT AT THE NEXT COMMISSION MEETING USING THE PLANNING BUDGET WE CURRENTLY HAVE AUTHORIZED FOR THE SPRINKLER AND SMOKE CONTROL WORK AS WELL AS OUR PRE ENGINEERING AND PREDESIGNED TASK
  • THIS PDD WILL LAST PROVIDE A SEQUENCE APPROACH OF HOW TO IMPLEMENT THE WORK, PROVIDING A COMPREHENSIVE OPERATIONAL IMPACT AVOIDANCE PLAN
  • NEXT SLIDE, PLEASE
  • SIMILAR TO THE MAIN TERMINAL PROGRAM, OUR CONCOURSE MODERNIZATION PROGRAM HAS ALSO BEEN IN DEVELOPMENT
  • CONCOURSE IS BC AND LAST A MAJOR IMPROVEMENT IN THE 90S
  • AT THIS POINT, MUCH OF OUR INFRASTRUCTURE IS RUNNING OUT OF CAPACITY AND LIFESPAN
  • SPECIFICALLY, WE ARE SEEING ISSUES WITH OUR HVAC SYSTEMS AS WE DEVELOP OUR NEEDS FOR THE CONCOURSE
  • WE BROKE THIS INTO TWO SUB PROGRAMS HANDLING THE SEALING AND ABOVE WORK AND THE WORK BELOW THE CEILING DO THE MORE CRITICAL NATURE OF THE WORK
  • WE HAVE INITIALLY FOCUSED ON CEILING AND ABOVE, AND WE CALL THIS CHIRRP, WHICH STANDS FOR CONCOURSE HPC INFRASTRUCTURE RENEWAL REPLACEMENT PROGRAM
  • THIS WORK WILL INCLUDE UPGRADING THE HPC, BUT ALSO NEW CEILING, LIGHTING AND SIGNAGE AND THE COMMON COURSES
  • WE ARE PROJECTING A $255,000,000 BUDGET FOR THIS WORK, BUT WE'LL REFINE THAT NUMBER AS WELL AS THE PHASING AND SCHEDULE AS WE DEVELOP PDD
  • NEXT SLIDE, PLEASE
  • THE UTILITY MASTER PLAN STUDY HAS BEEN PROGRESSING FOR A WHILE
  • ONE OF THE ELEMENTS WAS TO LOOK AT THE CONDITION AND CAPACITY OF OUR SYSTEMS FEEDING OUR EXISTING FACILITIES
  • WE ARE NOW AT A POINT WHERE WE CAN PROVIDE HIGH LEVEL ESTIMATES FOR THE RENEWAL REPLACEMENT OF THESE REQUIRED UTILITIES AND FOR OVERALL CAPITAL PLAN TRANSPARENCY PURPOSES
  • WE ARE INCLUDING THIS $250,000,000 AS A BUDGET THAT WE WILL MAINLY ALL DOWN TO TRANSFER INTO PROJECTS THAT ARE IN THE AREA OR PROVIDE SIMILAR WORK
  • SO A GOOD EXAMPLE OF HOW THIS BUDGET WILL BE DRAWN DOWN IS OUR AIRFIELD PAVEMENT WORK
  • AS WE REPLACE PANELS ON OUR RAMP AREAS, WE MOST LIKELY WILL ALSO HAVE UTILITIES THAT ARE IN NEED OF RENEWAL REPLACEMENT UNDERNEATH
  • AND SO WE'LL DO THAT ALL AS ONE WILL COMBINE THE WORK TOGETHER TO BOTH SAVE TIME AND BUDGET OVERALL
  • AND USING THIS BUDGET, WE'LL BE ABLE TO TRANSFER THIS BUDGET INTO THAT PAYMENT WORK PROJECT
  • NEXT SLIDE, PLEASE
  • OKAY, SO THE LAST TWO EXAMPLES ARE SOME OF THE LARGER INDIVIDUAL PROJECTS THAT WE PUT INTO THE CAPITAL PLANS HERE
  • THE UTILITY METER NETWORKING IS A REPLACEMENT OF AROUND 700 INTO LIFE ELECTRICAL METERS WITH NETWORK CAPABLE METERS, AS WELL AS CREATING A NETWORK OF A NETWORK TO MONITOR AND MANAGE OUR ELECTRICAL LOADS
  • THIS WILL HELP US REVIEW HOW WELL WE ARE MEETING OUR ELECTRICAL TARGETS AND COMPLY WITH THE WASHINGTON CLEAN BUILDINGS ACT FOR PERFORMANCE BASED ENERGY TARGET REPORTING
  • NEXT SLIDE, PLEASE
  • OKAY
  • LAST ONE, KING COUNTY RECENTLY CHANGED THEIR PERMIT REQUIREMENTS FOR WHAT THEY WILL ACCEPT FOR FLUID LIMITS FROM OUR INDUSTRIAL WASTEWATER SYSTEM
  • THIS LIMIT IS REALLY AROUND OUR DEICING, SO IT REALLY COMES IN THE WINTER WHEN WE'RE DOING DEICING ACTIVITIES
  • THE NEW PERMIT REQUIREMENTS ARE LOW ENOUGH THAT STORAGE AND SLOW RELEASE, AS WE CURRENTLY HAVE BEEN OPERATING UNDER, IS REALLY NOT AN ACHIEVABLE OPTION ANYMORE
  • SO ALTHOUGH OUR ENVIRONMENTAL GROUP IS EVALUATING REGIONAL AND ALTERNATIVE SOLUTIONS, THE KING COUNTY PERMIT 2022 DELIVERABLE REQUIREMENTS REQUIRED US TO MOVE FORWARD WITH AN ONSITE PRETREATMENT FACILITY DEVELOPMENT
  • WHILE REGIONAL SOLUTIONS ARE REVIEWED, OUR PLAN WILL BE TO COME BACK TO COMMISSION AROUND THE BEGINNING OF THE YEAR TO REQUEST AUTHORIZATION FOR DEVELOPMENT OF A PDD AND ENGINEERING ANALYSIS TO MEET THE KING COUNTY ENGINEERING REQUIREMENTS BY THE END OF 2022 AND THAT COMPLETES JUST THE UPDATE OF OUR CAPITAL WORK
  • I THINK BORGAN IS NOW GOING TO GIVE YOU A LITTLE BIT MORE DETAIL INTO THE THE FULL CAPITAL PROGRAM FROM A FROM A CASH FLOW PERSPECTIVE, A 20 MINUTES LEFT FOR THE OVERALL PROGRAM
  • CAN WE TAKE FIVE MINUTES TO ONCE AROUND ON THAT PRESENTATION? CLARK FORWARD
  • THANK YOU
  • I'LL BEGIN WITH COMMISSION BOWMAN
  • COMMISSIONER BOWMAN SORRY
  • NO, YOU'RE FINE
  • SORRY ABOUT THAT
  • NO, I AM FINE
  • THANK YOU
  • THANK YOU, COMMISSIONER CALKINS
  • NO QUESTIONS RIGHT NOW
  • THANK YOU, COMMISSIONER CHO
  • I'M GOOD AS WELL
  • THANK YOU
  • THANK YOU, COMMISSIONERS STEINBRUECK
  • I'M FINE
  • THANKS
  • THANK YOU
  • COMMISSIONER FELLEMAN
  • I HAD TWO QUICK QUESTIONS
  • ONE IS I HAVEN'T SEEN A BUDGET ITEM FOR INCREASED ELECTRICAL CAPACITY FOR ELECTRICAL TUGS PLUGGED IN ANYWHERE
  • AND I KNOW THAT OUR REPEATEDLY I'M TOLD THAT OUR ABILITY TO PHASE OUT DIESEL TUGS IS CONTINGENT ON OUR INCREASED CAPACITY FOR TO HAVE THE ELECTRICAL STUB OUT
  • AND I WAS JUST CONFUSED BY WHAT A REGIONAL SOLUTION MEANS WHEN WE'RE DEALING WITH ON SITE INDUSTRIAL WASTE TREATMENT
  • DO WE HAVE ANY THOUGHTS ON THAT EITHER? ON THE ESC, WE DO HAVE AN EXISTING PROJECT IN THE CAPITAL PLAN THAT IS WORKING TO PUT IN THE ESC CHARGING STATIONS ON OUR CONCOURSES A AND B
  • CURRENTLY, I DON'T KNOW THE EXACT TIME FRAME FOR WHEN THAT PROJECT WILL BE COMPLETE, BUT WE CURRENTLY HAVE CHARGING STATIONS ON CONTACT COURSES, CD AND YOUR SATELLITE
  • MR TECHNICIAN
  • PRESIDENT, I SEE SANDY KILROY WITH HER HAND UP
  • YES, THANK YOU
  • JUST ON THE REGIONAL SOLUTION, WE ARE IN A COUPLE OF CONVERSATIONS WITH KING COUNTY AROUND HOW TO ADDRESS THE WASTEWATER TREATMENT FLOWS AND STORM WATER COMING OFF THE AIRPORT
  • AND WE'RE LOOKING AT BOTH OPERATIONAL ISSUES THAT BOTH WE CAN MAKE AND THE WAY OR TREATMENT SYSTEM CAN MAKE AT RENTING
  • BUT AS PART OF THAT, THE COUNTY IS LOOKING AT ALL THEIR FLOWS AND WHAT GOES TO WHAT TREATMENT PLANT AND WHETHER REGIONAL CHANGES LIKE THAT CAN HELP ADDRESS THE AMOUNT OF SLOW WE HAVE DURING THOSE BIG RAIN AND SNOW EVENTS
  • ALRIGHT, THANK YOU
  • CAN I GET A TIMELINE ON OUR ESG IMPLEMENTATION NUMBERS AND HOW WE'RE PROJECTED TO GO INTO THE FUTURE? YEAH, I THINK WE CAN PROVIDE YOU WITH THAT
  • ALRIGHT
  • THANK YOU
  • SO BORGAN, TAKE IT AWAY
  • OKAY, LET'S GO TO THE NEXT SLIDE, PLEASE
  • I'M GOING TO SPEND JUST ABOUT FIVE MINUTES GOING THROUGH SOME OVERVIEW SLIDES RATHER QUICKLY AND THEN I'LL SHOW OUR FORECAST
  • SO THAT'S REALLY WHAT'S LEFT
  • AND THIS FIRST SLIDE JUST SHOWS THE NUMBERS, THE ACTUAL CASH FLOWS OF OUR MAJOR PROGRAMS AND SOME OF THE OTHER SUMMARY VERSIONS
  • BUT WHAT WE'RE LOOKING AT HERE IS ALMOST $4 BILLION OVER THE NEXT FIVE YEARS
  • SO THIS IS A VERY SIGNIFICANT INCREASE IN OUR LEVEL OF CAPITAL SPENDING
  • AND I THINK THE DESCRIPTIONS THAT KERI HAS JUST PROVIDED OF SOME OF THE MAJOR NEW PROGRAMS ARE REALLY WHAT'S DRIVING THAT
  • IN ADDITION, WE HAVE THE ONGOING BAGGAGE OPTIMIZATION PROGRAM THAT WILL CONTINUE NOW FOR THE NEXT FIVE YEARS AT SPENDING AT A VERY HIGH LEVEL
  • SO LET'S GO ON TO THE NEXT SLIDE, PLEASE
  • AND THIS IS JUST A SUMMARY IN ORDER OF THE BIGGEST PROJECTS, INCLUDING THOSE THAT ARE WELL UNDERWAY AND ALMOST COMPLETE, LIKE THE INTERNATIONAL ARRIVALS FACILITY
  • BUT IT JUST PUT SOME OF THE NUMBERS TO SOME OF THE PROJECTS THAT KERI WAS JUST DESCRIBING
  • AND I THINK THAT THESE MAJOR PROGRAMS TAKE UP A BIG PART OF OUR CAPITAL CAPITAL PLAN IN THE NEXT FIVE YEARS
  • NEXT SLIDE, PLEASE
  • AND WHILE YOU MAY NEED A MAGNIFYING GLASS HERE, HERE IS THE DETAILED LIST OF ALL OF THE NEW PROJECTS THAT ARE COMING INTO OUR CAPITAL PROGRAM AND KERI'S HIGHLIGHT AT ALL THE BIG ONES
  • BUT THERE ARE OTHER ONES AS WELL
  • AND JUST TO REITERATE, EACH OF THESE PROJECTS WILL COME TO YOU FOR AUTHORIZATION FOR DESIGN, PROBABLY SOMETIME NEXT YEAR OR SHORTLY FOLLOWING
  • NEXT SLIDE, PLEASE
  • AND THIS IS A VIEW OF OUR CAPITAL PROGRAM THAT I'LL JUST SUMMARIZE VERY QUICKLY THAT THE TOP SECTION IS THOSE PROJECTS THAT ARE AUTHORIZED FOR CONSTRUCTION OR HAVE SOME AUTHORIZATION FOR CONSTRUCTION
  • AND YOU CAN SEE THAT THAT TOTALS OVER A BILLION DOLLARS OR 27% OF THE CASH FLOWS
  • THE NEXT SECTION IS THE PROJECTS THAT HAVE DESIGN AUTHORIZATION, AND THAT ACCOUNTS FOR ONE 2 BILLION, OR 31%
  • AND THEN FINALLY, WHAT'S LEFT IS THOSE THAT ARE PENDING AUTHORIZATION, AND THAT'S 42% OR ONE 7 BILLION
  • SO THAT'S JUST A DIFFERENT WAY OF SLICING OUR CAPITAL PROGRAM
  • SO THERE WILL BE A LOT OF PROJECTS COMING FORWARD IN THE NEXT FEW YEARS FOR DESIGN FOR CONSTRUCTION AUTHORIZATION
  • AND THAT TO A LARGE EXTENT, IS WHAT'S DRIVING THE INCREASED RESOURCES THAT I DESCRIBED EARLIER IN THE PROJECT MANAGEMENT GROUP AND IN SOME OF THE OTHER AREAS, BECAUSE AS AN ORGANIZATION, WE HAVE TO REALLY BE PREPARED TO DELIVER A CAPITAL PROGRAM LIKE THIS
  • AND IT'S NOT JUST IN PROGRAM MANAGEMENT, IT'S THROUGHOUT THE ORGANIZATION
  • NEXT SLIDE, PLEASE
  • THIS IS THE FUNDING PLAN
  • AND JUST TO BE REALLY SIMPLE HERE, THE LIGHT BLUE IN 2022 IS OUR EXISTING BOND PROCEEDS FROM OUR 2021 BOND ISSUE
  • AND SO YOU'D SAY THAT OUR SPENDING FOR NEXT YEAR IS PRETTY WELL COVERED
  • BUT AS WE GET OUT TO 2023 AND BEYOND, WE ARE LOOKING AT THE NEED TO ISSUE A LOT OF BONDS TO PAY FOR THE AIRPORT CAPITAL PROGRAM
  • THE GREEN IS ADF THAT'S OUR CASH
  • AND THE REASON THAT'S SO SMALL GOING FORWARD IS THAT MUCH OF THE CASH THAT WE GENERATE, WE'RE SAVING BECAUSE WE'RE BUILDING UP OUR CASH BALANCE FOR RESILIENCY PURPOSES
  • BUT WE WILL HAVE MORE CASH ONCE WE GET BEYOND 2024, THEN WE CAN START SPENDING SOME MORE MONEY
  • I BUT BOND FUNDING IS PRIMARILY HOW WE WILL BE PAYING FOR THIS CAPITAL PROGRAM
  • IF THE INFRASTRUCTURE BILL GOES THROUGH
  • WE ARE EXPECTING A LITTLE OVER 400 MILLION, SO THAT WOULD OBVIOUSLY HELP
  • BUT THAT IS STILL A RELATIVELY SMALL PART OF OUR TOTAL CAPITAL NEEDS FOR THE NEXT FIVE YEARS
  • NEXT SLIDE, PLEASE
  • AND THIS IS NOW I'LL TALK ABOUT THE FORECAST AND HERE IS A LOOK AT OUR CURRENT THINKING ON THE PASSENGER FORECAST AND JUST PICKING UP AFTER 2022, THERE'D BE A 4% GROWTH IN 2023 AND THEN A RELATIVELY MODEST GROWTH AFTER THAT, ACHIEVING 2019 LEVELS AND EITHER 2023 OR 2024 IN THAT TIME FRAME
  • THAT'S THE CURRENT THINKING
  • NEXT SLIDE, PLEASE
  • SO IT SAYS PASSENGER FORECAST THAT GO A LONG WAY TO DRIVING OUR OUR FINANCIAL FORECAST HERE
  • THE AIRLINE REVENUES WILL BE GROWING LARGELY BECAUSE WE'RE BRINGING ON NEW ASSETS AND NEW FACILITIES, AND THEN WE HAVE TO PAY FOR THOSE THROUGH DEBT SERVICE OR OPERATING AND MAINTENANCE COSTS, THE NON AERONAUTICAL REVENUES
  • WE'RE STRIVING TO INCREASE THOSE REVENUES AS BEST WE CAN, BECAUSE THAT'S WHAT WE NEED TO PAY FOR OUR CAPITAL PROGRAM
  • OUR OPERATING COSTS ARE GROWING, TOO, AS WE JUST HAVE ANNUAL COST INCREASES
  • AND YES, THERE WILL BE SOME NEW FTES, BUT THE AMOUNT WILL BE DETERMINED
  • LET'S JUMP FORWARD TO THE KEY METRICS THAT ARE ON THE NEXT SLIDE, PLEASE
  • SO HERE WE SEE THE DEBT SERVICE COVERAGE ONCE WE GET BEYOND THE BENEFIT OF THE GRANTS THAT WILL START TO DECLINE
  • BUT WE'RE STILL AT A HEALTHY LEVEL BY 2026 OF ONE POINT 43 CASH BALANCE
  • WE'RE GOING TO HIT THE 18 MONTHS BY 2024
  • AND HERE TO RESPOND TO THE QUESTION EARLIER, IS OUR COST FOR EMPLOYMENT GROWING FROM A LITTLE OVER $15 NEXT YEAR TO ALMOST $22 BY 2026, AND THAT'S TO BE EXPECTED WITH THE CAPITAL PROGRAM OF THE SIZE
  • AND I THINK WE'VE BEEN SIGNALING THAT OUR CP WOULD BE GOING UP AND IT ACTUALLY IS GOING UP
  • SO THE OTHER KEY MEASURES HERE, THE PORT AT THE BOTTOM, THE DEBT PIER ORIGINATING PASSENGER
  • THIS GOES TO SHOW THAT OUR OUR DEBT LEVELS WILL BE GROWING AS WE ISSUE MORE DEBT TO PAY FOR THIS CAPITAL PROGRAM
  • AND WITH THAT, I WILL STOP AND ASK FOR ANY ADDITIONAL QUESTIONS
  • BUT THAT COMPLETES THE PRESENTATION
  • THERE IS A SIGNIFICANT AMOUNT OF INFORMATION IN THE APPENDIX, BUT I DON'T PLAN ON COVERING THAT HERE TODAY
  • WELL, THANK YOU, BORGAN
  • AND THANK YOU ALL SPEAKERS FOR BEING QUITE CONCISE IN YOUR PRESENTATIONS AND HAVING ALLOWED FOR US TO PEPPER YOU WITH SOME QUESTIONS WITH TEN MINUTES LEFT
  • CLERK HART, WOULD YOU GO AROUND THE TABLE ONCE MORE? THANK YOU, MR COMMISSION PRESIDENT
  • I'M GOING TO LEAVE THE PRESENTATION AT JUST IN CASE WE HAVE TO REFERENCE ANY SLIDES FROM THIS LAST SEGMENT OF QUESTIONS BEGINNING WITH COMMISSIONER BOWMAN
  • I DON'T HAVE ANY QUESTIONS
  • I MEAN, THERE'S JUST SO MUCH HERE, IT'S IMPOSSIBLE TO COVER IT IN THE NEXT COUPLE OF MINUTES
  • SO I'LL HOLD MY QUESTIONS ORGAN AND I CAN EMAIL THEM TO YOU LATER
  • THANK YOU
  • VERY GOOD
  • THANK YOU, COMMISSIONER FELLEMAN, COMMISSIONER CALKINS
  • THANK YOU, BORGAN
  • I KNOW BEFORE DAYS WE WERE SETTING BUDGETS AND CREATING FORECAST
  • WE SPENT A LOT OF TIME THINKING ABOUT THE COST PER EMPLOYMENT NUMBER AND I'M WONDERING IF YOU COULD TAKE A LITTLE BIT OF TIME TO EXPLAIN IT AND ALSO TELL US WHERE WE'RE GOING TO SIT BASED ON THIS FINANCIAL FORECAST RELATIVE TO PIER AIRPORTS AROUND THE COUNTRY
  • SINCE THE COST FOR EMPLOYMENT IN, I THINK, IS ONE OF THOSE FACTORS THAT GOES INTO DETERMINING WHETHER CARRIERS BRING NEW SERVICE HERE
  • AND, OF COURSE, THE BOTTOM LINE FOR PASSENGERS HOW MUCH THEIR PLANE TICKET COSTS
  • SO COST FOR EMPLOYMENT THE LAST COUPLE OF YEARS WITH SUCH A DECREASE IN THE PASSENGER LEVEL HAS BECOME A LITTLE BIT OF A MEANINGLESS MEASURE
  • AND AIRPORTS HAVE BEEN ALL OVER THE PLACE, BUT PRETTY PANDEMIC AND FORECASTS ARE STARTING TO MAKE SENSE GOING FORWARD
  • BUT WE SAW THAT THERE WOULD BE KEY AIRPORTS LIKE LA, SAN FRANCISCO WOULD BE IN THE MID TWENTIES, POSSIBLY HIGHER, AND WE NOW SORT OF BASED ON WHAT I'VE SEEN, I STILL EXPECT SOME OF THE BIG WEST COAST GATEWAY HUBS WILL BE IN PROBABLY IN THE HIGH 20S, SOME MAY BE IN THE LOW 30S
  • I THINK AS WE GO FORWARD, OUR GOAL WILL BE TO BE SLIGHTLY LESS THAN THOSE OTHER LARGE AIRPORTS
  • BUT THERE'S ABSOLUTELY NO QUESTION IN MY MIND THAT OUR COST PER EMPLOYMENT WILL CONTINUE TO GROW AS WE LAYER IN
  • THE CAPITAL PROGRAM PARTICULARLY RELATES TO THE SUSTAINABLE AIRPORT MASTER PLAN
  • WE'RE GOING TO BE MOSTLY DEBT FUNDING THIS
  • SO THE COST OF DEBT SERVICE GO INTO THE RATE BASE, AND THAT'S WHAT WE'LL BE INCREASING THE AIRLINE REVENUES AND THEREFORE THE CPE
  • OUR GOAL IS TO STAY COMPETITIVE
  • BUT WE'RE REALLY FOCUSING ON THE WEST COAST GATEWAY HUBS BEING COMPETITIVE IN THAT GROUP, AS OPPOSED TO TRYING TO BE COMPETITIVE NATIONWIDE
  • WHERE REALISTICALLY, THE KIND OF FACILITIES THAT WE ARE GOING TO NEED TO BRING ON OVER THE NEXT TEN PLUS YEARS ARE GOING TO PUT A LOT OF PRESSURE ON OUR COST STRUCTURE, AN ORGAN
  • IF I COULD ADD TO THAT COMMISSION ACCOUNTING, WE HAVE TO BE VERY CAREFUL WHEN WE COMPARE CPE OF OUR AIRPORT VERSUS ANY OTHER AIRPORT, BECAUSE MANY TIMES IT'S NOT AN APPLES TO APPLES COMPARISON
  • YOU MIGHT HAVE AN AIRPORT THAT HAS A VERY LOW CPE BUTTONS BECAUSE THEY HAVEN'T DONE ANY MAJOR CAPITAL DEVELOPMENT PROGRAM
  • SO DEPENDING ON WHERE YOU ARE IN YOUR CAPITAL DEVELOPMENT PROGRAM, YOUR CPE CAN VARY SIGNIFICANTLY
  • ALSO, MANY AIRPORTS, THE AIRLINES, FOR EXAMPLE, MANAGE CERTAIN TERMINAL THE CAUSE OF UNIT TERMINAL GRID
  • THEY OBSERVE ALL THE COSTS OF SOCIAL WITH THOSE NOT THAT MAY NOT FACTOR INTO THE COST PER EMPLACEMENT SO MANY TIMES THAT WE'RE COMPARING AIRPORTS CPE, IT'S REALLY NOT AN APPLES TO APPLES, SO WE NEED TO BE VERY CAREFUL WHEN WE COMPARE CP
  • YOU CAN HAVE AN AIRPORT A VERY LOW CPU
  • THE AIRPORT IS FALLING APART
  • THEY HAVEN'T DONE ANYTHING IN A LONG TIME TO UPGRADE THEIR FACILITIES, SO WE JUST NEED TO BE CAUTIOUS
  • THAT'S REALLY HELPFUL
  • I DIDN'T REALIZE THAT ABOUT THE UNIT TERMINAL WHERE THEY CAN KIND OF ARTIFICIALLY REDUCE THEIR NEW ARE COMING FROM SOME OF THE ENTIRE TERMINAL ACTUALLY MANAGED BY THE AIRLINES
  • IT DOESN'T FACTOR IN THE CPE, BUT WE DO IT
  • BUT WE'D BE DOING A COMPARISON WITH FOR EXAMPLE, JARVER SHOULD SEND OCCIDENTAL AIRPORT
  • IT'S NOT AN APPLES APPLES COMPARISON BECAUSE WE MAINTAIN MORE SUPPORT FACILITIES HERE
  • ALRIGHT
  • THANK YOU, LANCE
  • CAN WE MOVE TO THE NEXT ONE? THANK YOU, COMMISSIONER CALKINS
  • COMMISSIONER CHO
  • YEAH
  • BORGAN
  • WHAT IS THE AVERAGE TERM OR MATURATION RATE TERM FOR OUR BOND? HOW LONG DO WE ISSUE OUR BONDS? TYPICALLY THERE'S A 25 YEAR TERM
  • OKAY
  • AND IN A SCENARIO LIKE IF WHERE WE HAVE HUGE COST OVERRUNS, HOW DO WE MAKE UP FOR OUR ACCOUNT FOR THAT? DO WE ISSUE MORE BONDS OR DO WE RAISE PS? I GUESS WE CAN'T REALLY GET THESE
  • HOW DO WE ACCOUNT FOR THAT? YEAH
  • AT THE MARGIN TO PAY FOR THINGS
  • WE USE REVENUE BONDS
  • AND IN THE CASE OF THE IF WE'RE USING A SIGNIFICANT AMOUNT OF PFCS TO PAY THE DEBT SERVICE SO THAT THE COSTS DON'T GO IN THE RATE BASE BECAUSE WE ARE TRYING TO MANAGE THE GROWTH OF THE COST TO THE INTERNATIONAL ARRIVALS
  • AND IS THE BAGGAGE OPTIMIZATION ENTIRELY PAID FOR BY PSE, OR IS IT ALSO TO BE ISSUE BONDS FOR THAT PROJECT, PRIMARILY BONDS? ALTHOUGH WE ALSO HAD A SIGNIFICANT FEDERAL CONTRIBUTION FROM A TSE TO TSA, EFFECTIVELY A GRANT, IT WAS ALL RIGHT
  • THANK YOU
  • THAT'S IT
  • THANK YOU, COMMISSIONER CHO, COMMISSIONERS
  • TIME BRO
  • THANK YOU
  • COMMISSIONERS STEINBRUECK
  • COMMISSIONER FELLEMAN
  • OKAY, I DIDN'T HEAR THAT, BUT I JUST WAS HOPING TO GET A SENSE OF WHAT IT WOULD MEAN IN THIS NEXT YEAR
  • WE HAVE A MILLION AND A HALF FOR SAM PLANNING, BUT THERE IS NOT ANTICIPATED TO BE THE POTENTIAL FOR SAM CONSTRUCTION PROJECTS
  • AND AND I DIDN'T SEE PERHAPS IT'S NOT A BIG ITEM, BUT THE POTENTIAL FOR AIRPORT DRIVES EXPANSION
  • HOW WOULD OUR DEBT SERVICE OR OTHER EXPENSES BE FOR NEXT YEAR OR WOULD NOT PLAY A LARGE ROLE FOR JUST NEXT YEAR? SO FOR NEXT YEAR, THE COSTS THAT ARE IN THE BUDGET ARE IN THE OPERATING BUDGET WAS THE 1.5 MILLION TO COMPLETE THE ENVIRONMENTAL REVIEW WE HAVE HAD IN OUR BUDGET, 300 MILLION THAT WAS APPROVED BY THE AIRLINES AS PART OF OUR CURRENT LEASE AGREEMENT TO SPEND ON PLANNING AND PRE CONSTRUCTION WORK FOR SAM PROJECTS
  • AND OBVIOUSLY I THINK NOTHING GOES BEYOND 30% DESIGN
  • AND THERE'S A NUMBER OF THE ENABLING PROJECTS THAT ARE IN VARIOUS STAGES OF EARLY DESIGN
  • SO THOSE ARE IN THE BUDGET WE'VE TYPICALLY BEEN PAYING FOR THOSE WITH COUCH
  • OKAY, SO YOU DON'T EXPECT SIGNIFICANT ADDITIONAL STAMP EXPENSES OTHER THAN THE MILLION AND A HALF FOR ENVIRONMENTAL REVIEW FOR 2022
  • I'LL GET BACK TO YOU ON THE SPECIFIC CASH FLOWS FOR THOSE CIPS THAT WE HAVE RELATING TO SAM
  • I THINK THEY'RE ACTUALLY LISTED IN THE PRESENTATION, BUT NOW THAT'S DOWN
  • SO I CAN'T REMEMBER THE NUMBER, BUT IT SHOULD BE LISTED THERE ANYWAY
  • IT'S ALREADY BUILT INTO THE BUDGET THAT WE'RE TALKING ABOUT
  • YES
  • ALRIGHT, GREAT
  • I SEE ONE MORE HAND UP AND THEN WE CAN TAKE A 15 MINUTES BREAK BEFORE OUR EXECUTIVE SESSION
  • YES, WE HAVE MR JEFFREY BROWN TAN
  • AND IT'S FINE IF YOU'RE A SON
  • I WAS GOING TO ADD TO THE STOP THIS QUESTION
  • BUT IF YOU'RE SET TO WALK IN THAT PAST, JEFFREY, WE HAVE A COUPLE OF MINUTES
  • YOU WANT TO ADD ANYTHING
  • SO JUST REMEMBER, COMMISSIONERS, WE HAD FIVE IN PROJECTS THAT WE HAD APPROVAL FOR $10 MILLION BACK
  • I THINK IT WAS LAST YEAR OR MAYBE THE YEAR BEFORE TO DO DESIGN OF THOSE EVEN PROJECTS THAT WORK IS CONTINUING
  • WHAT WE'RE CURRENTLY DOING IS ALIGNING OUR CAPITAL DESIGN NEEDS WITH SOME ENVIRONMENTAL FOR NEXT YEAR, I THINK WILL BE PROGRESS IN THE SUB
  • ENVIRONMENTAL DEPENDS ON OUTCOME OF THAT
  • THEN WE'RE GOING TO THE ADDITIONAL DESIGN
  • THAT'S THE CONTINGENCY
  • VERY GOOD
  • AND COMMISSIONER STEINBRUECK YOU JUST GAVE IT A PASS
  • YOU NOTICE? OH, THERE YOU GO
  • ALRIGHT, THEN I'M FINISHED
  • THANK YOU
  • VERY GOOD THEN
  • WELL, THANK YOU VERY MUCH AGAIN
  • AND VERY ILLUMINATING CONVERSATION
  • WE WILL CALL THE STUDY SESSION CLOSED AT 1014 AND SEE YOU ALL BACK FOR THE EXECUTIVE SESSION AT 1030
  • THANK YOU
  • SO THANK YOU, BORGAN
  • AND THANK YOU, KERI.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.