Radio Microwave Redundancy Loop
COMMISSION AGENDA MEMORANDUM Item No. 8c ACTION ITEM Date of Meeting September 27, 2022 DATE : September 16, 2022 TO: Stephen P. Metruck, Executive Director FROM: Mike Tasker, Director, Aviation Maintenance Krista Sadler, Director Technology Delivery SUBJECT: Radio Microwave Redundancy Loop (CIP #C801263) Amount of this request: $2,500,000 Total estimated project cost: $2,500,000 ACTION REQUESTED Request Commission authorization for the Executive Director to 1) proceed with the Radio Microwave Redundancy Loop project; 2) execute contract(s) for hardware, software, and services; and 3) execute up to three leases for Port capacity on Microwave Towers for a total project cost not to exceed $2,500,000 and 5-year lease costs estimated $840,000. EXECUTIVE SUMMARY This project will add up to three Radio Microwave sites to create a loop topology between tower sites to ensure connectivity in the event of an incident that takes a tower out of commission. With the tower loop design, each site will have multiple pathways to get to the prime site at Seattle-Tacoma International Airport (SEA). In addition, the project will activate a backup, virtual prime site to protect against issues with the SEA prime site. Capital costs for the buildout of the three new sites and the activation of the backup site are $2,500,000. Lease costs for space on new tower sites or additional capacity on current sites is estimated at $840,000 over five years. The Port of Seattle operates its own mixed-mode radio network that is a vital communication system. It includes over 1900 radios and dispatch consoles for the Port Public Safety departments, Aviation Operations, Aviation and Maritime Maintenance, Aviation and Maritime Security and Emergency Preparedness teams who rely heavily on the radio system for day-to-day operations and incident response. It is also the critical communication link for mutual aid responders within adjacent jurisdictions who will come into the Port’s radio coverage area to aid during emergencies. Our current towers operate serially to send radio communications to the Prime site at SEA. If a single link is lost, at least one site and possibly more, depending on where the break is, will lose Template revised January 10, 2019. COMMISSION AGENDA – Action Item No. 8c Page 2 of 4 Meeting Date: September 27, 2022 connectivity. This will reduce our radio coverage area and potentially leave radio users in the field unable to communicate with dispatchers and other radio users until the link is restored. JUSTIFICATION With the current serial tower design, if there is a tower taken offline for any reason, all radio communication is down for radios served by that site or sites beyond. While there are work arounds for planned outages, they require significant coordination. A full transition to a backup system, could take several days. In addition, the first mitigation for a north end outage is to utilize the City of Seattle radio network. If they are also experiencing outages from similar threats, the outages could be much longer. Diversity in Contracting Project staff will work with the Diversity in Contracting Department to determine if a direct women-and-minority-owned business enterprise (WMBE) aspirational goal should be assigned. It is expected that opportunities will be limited for this proprietary system. DETAILS Scope of Work (1) Procurement of equipment and services from Motorola, our radio vendor (2) Design and installation of new sites (3) Testing and activation of the virtual prime site for further redundancy Schedule Commission authorization 2022 Quarter 3 Contract Completion 2022 Quarter 4 Design and Site Identification Completion 2023 Quarter 2 In-use date 2024 Quarter 1 Cost Breakdown This Request Total Project Equipment and Implementation Services $2,100,000 $2,100,000 Port Labor $400,000 $400,000 Total $2,500,000 $2,500,000 Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA – Action Item No. 8c Page 3 of 4 Meeting Date: September 27, 2022 ALTERNATIVES AND IMPLICATIONS CONSIDERED Alternative 1 – Create redundancy through duplicative Wide Area Network Connectivity between towers Cost Implications: $300,000 Capital; $200,000 Five-year Recurring Cost Pros: (1) Lower cost alternative Cons: (1) This alternative requires a manual failover that could take 1-2 days for activation. This is not the recommended alternative. Alternative 2 – Build Radio System redundancy by creating a loop topology with additional tower sites Cost Implications: $2,500,000 Capital; $900,000 Five-year Recurring Cost Pros: (1) An entire site can be removed from the loop and the other sites would remain connected to the SEA prime site, resulting in no loss of radio communication capabilities. (2) If the SEA prime site goes down, we will have full redundancy with our virtual prime site. Cons: (1) Higher cost alternative This is the recommended alternative. FINANCIAL IMPLICATIONS Cost Estimate/Authorization Summary Capital Expense Total COST ESTIMATE Original estimate $2,500,000 $0 $2,500,000 AUTHORIZATION Previous authorizations $0 0 $0 Current request for authorization $2,500,000 0 $2,500,000 Total authorizations, including this request $2,500,000 0 $2,500,000 Remaining amount to be authorized $0 $0 $0 Annual Budget Status and Source of Funds This project was included in the 2022-2026 Corporate capital budget and plan of finance for $2,500,000 in CIP# C801263. The project will be funded with 82.1% Airport Development Fund and $17.9% General Fund. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA – Action Item No. 8c Page 4 of 4 Meeting Date: September 27, 2022 Financial Analysis and Summary Project cost for analysis $2,500,000 Business Unit (BU) Administrative for allocation to Aviation Effect on business performance NOI after depreciation will increase due to inclusion of (NOI after depreciation) capital (and operating) costs in airline rate base. IRR/NPV (if relevant) Less than $0.01 in 2024 CPE Impact Future Revenues and Expenses (Total cost of ownership) The Port will need up to three new site leases for microwave tower space at an estimated cost of $144,000 annually. In addition, new capacity may be required at existing microwave towers that could increase annual costs by $24,000 for a total annual cost of $168,000 and five-year costs of $840,000. Annual costs will be included in the Aviation Maintenance Operating Budget. ATTACHMENTS TO THIS REQUEST None PREVIOUS COMMISSION ACTIONS OR BRIEFINGS None Template revised June 27, 2019 (Diversity in Contracting).
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.