8e. Presentation
BH Pile Wrap and P66 Cathodic
Item No.: 8e_Supp Meeting Date: March 28, 2023 C800539: Bell Harbor Marina Pile Wrap & Cathodic Protection C800517: Pier 66 Breakwater Cathodic Protection Darrell Dare, Sr. Manager, Recreational Boating Julie Yun, WPM Capital Project Manager Project Overview P66/ BHM Proj ect Area 2 Site Condition 3 Project Scope & Coordination Project Scope: – Pile Wrap at (92) steel piles at the south apron – Cathodic Protection Anode Replacement at (498) steel piles at BHM and Pier 66. Coordination: – Permitted in-water work window – Facility operations: cruise season, rec boating events schedule, etc. – Simultaneous projects: Pier 66 Fender Rehabilitation & Shore Power projects 4 Project Info Cost Breakdown This Request Total Project C800539 C800517 C800539 C800517 Current Authorization $0 $0 $230,000 $130,000 Design $395,000 $420,000 $625,000 $550,000 Construction $0 $0 $2,125,000 $1,200,000 Total – per project $395,000 $420,000 $2,750,000 $1,750,000 Total – both projects $815,000 $4,500,000 5 Project Timeline Activity Date Design Authorization – WPM DOA Workflow Q1 2023 Design Start (Docks Diving IDIQ – pending execution) Q2 2023 Construction Authorization – WPM DOA Workflow Q1 2024 Construction Start, (2) work windows Q4 2024 (Fish window: 8/1/24 – 1/15/2025) In-use date Q1 2026 6 Questions? 7
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.