10c. Presentation
T91 Cruise Shore Power Cable
Item No: _10c_supp__ Meeting date: August 8, 2023 Terminal 91 Shore Power Extension: Authorization to Procure Mobile Cable Positioning Devices Linda Springmann, Director Cruise & Maritime Marketing Kelly Purnell, Capital Project Manager, Waterfront Project Management CIP # C801293 WP # N10318 Overview • Action Requested • Project Objectives • Sustainability Goals • Project Scope • Schedule • Project Estimate 2 Action Requested Request Commission authorization for the Executive Director to: 1. Proceed with entering into a contract for the procurement of a proprietary shore power system consisting of two (2) mobile cable positioning devices for Terminal 91, Pier 91. Project Estimated Cost: $2,750,000 Procurement Authorization Request: $2,500,000 3 Project Objectives • Increase the potential number of ship connections by leveraging newer innovations that allow variable berthing needs. • Ensuring the highest opportunity to reach shore power without moving gangways provides the best optimization of our assets and their lifespan. • Accelerate emissions reductions by eliminating barriers. 4 T91 Cruise Sustainability • In 2022: • Of shore power-equipped, homeport calls, 69 of 83 equipped calls connected (83%). • Shore power connections in 2022 avoided 2,000 tonnes greenhouse gas emissions. 5 Century Agenda Goals This project supports the following Port goals and action plans: Century Agenda: • Responsibly Invest in the Economic Growth of the Region and All Its Communities • Be the Greenest and Most Energy Efficient Port in North America • Be a Highly Effective Public Agency 6 Project Scope • Procure two (2) mobile cable positioning devices (CPD) • Replace current connection point/ jib cranes with CPDs on east and west side of Pier 91 Existing jib crane, west berth Pier 91 Project Scope • Competition waiver contract with Watts Marine • Procurement package includes: o Design and engineering o Delivery, installation, and commissioning of Mobile CPDs Mobile Cable Positioning Device (CPD) Preliminary Schedule Commission authorization for Mobile CPDs 2023 Quarter 3 procurement Procurement of Mobile CPDs 2023 Quarter 3 Delivery and installation of Mobile CPDs 2024 Quarter 2 In-use date 2024 Quarter 2 9 Project Estimate Cost Estimate/Authorization Summary Capital Expense To ta l COST ESTIMATE Current estimate $2,750,000 0 $2,750,000 AUTHORIZATION Previous authorizations $250,000 0 $250,000 Current request for authorization $2,500,000 0 $2,500,000 Total authorizations, including this $2,750,000 0 $2,750,000 request Remaining amount to be authorized $0 $0 $0 10 Questions? Questions? 11
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.