10b. Presentation
Taxiway A Recircuiting
Item No. 10b_supp Date of Meeting March 26, 2024 Taxiway A Circuit Replacement (CIP# C801303) Design and Construction Authorization Seattle-Tacoma International Airport Taxiway A Circuit Replacement Request • Request Commission authorization for the Executive Director to – authorize final design and preparation of construction bid documents; – advertise, award, and execute a major public works construction contract; – procure long lead items; – include a Project Labor Agreement for the contract; and – authorize use of Port crews for abatement work. • The amount of this authorization request: $39,205,000 2 Project Background and Scope Project Background • Taxiway A was constructed in 1987, and centerline lighting has never been reconstructed. • According to FAA Advisory Circular, any circuit with megger reading below 1 megohm is deemed as “destined for rapid failure”. Taxiway A centerline lighting circuits exhibit signs of distress with megger readings close to 1 megaohm. • Furthermore, the conduit housing the circuit is corroded, making a cable pull unfeasible. Scope • This project will install new Taxiway A centerline lighting circuits, LED light fixtures, constant current regulators, PVC conduit, and concrete panels above conduit. 3 Project Details • This project will be combined with the 2025 Airfield Pavement and Supporting Infrastructure Replacement Project (CIP# C800930) and 2025 Airfield Utility Improvement Project (CIP# C801177). These projects have overlapping work areas and design functionality, interdependent operational impacts, and share 2025 schedule milestones. As such they were planned, designed, and phased to be delivered concurrently for purposes of Airfield safety, efficiency, and minimization of operational impacts. 4 Project Diagram Taxiway A Circuit Replacement 2025 Airfield Pavement and Joint Seal Replacement 5 Project Schedule Schedule Design complete 2024 Quarter 4 Construction start 2025 Quarter 1 In-use date 2026 Quarter 1 6 Project Budget Cost Breakdown Amount of this Request Total Estimated Project Cost Design $6,282,000 $6,577,000 Construction $30,527,000 $30,527,000 Sales Tax $2,396,000 $2,396,000 Total $39,205,000 $39,500,000 7 Thank You! Operated by the Port of Seattle FlySEA.org 8
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.