Minutes

Commissioners                                             Tay Yoshitani 
Gael Tarleton 
Chief Executive Officer 
Commission President 
Tom Albro                          P.O. Box 1209 
Bill Bryant                           Seattle, Washington 98111 
John Creighton                      www.portseattle.org 
Rob Holland                          206.787.3000 
Audio and video recordings of the meeting proceedings and meeting materials are available on the
Port of Seattle web site  www.portseattle.org. The approximate point in the video recording for each
agenda item is identified by hours, minutes, and seconds; example: 00:01:30. 
APPROVED MINUTES 
COMMISSION REGULAR MEETING OCTOBER 9, 2012 
The Port of Seattle Commission met in a regular meeting Tuesday, October 9, 2012, at Port of
Seattle Headquarters, Commission  Chambers, 2711 Alaskan Way, Seattle, Washington. 
Commissioners Albro, Creighton, and Tarleton were present. Commissioner Holland was excused
to attend to other Port business. Commissioner Bryant was absent. 
1.   CALL TO ORDER 
The regular meeting was called to order at 1:03 p.m. by Gael Tarleton, Commission President. 
2.   EXECUTIVE SESSION pursuant to RCW 42.30.110 
None. 
PLEDGE OF ALLEGIANCE 
3.   (00:01:30)  APPROVAL OF MINUTES 
Regular meeting of August 14, 2012. 
Motion for approval of minutes for the regular meeting of August 14, 2012  Creighton 
Second  Albro 
Motion carried by the following vote: 
In Favor: Albro, Creighton, Tarleton (3) 
Absent for the vote: Bryant, Holland 
4.   SPECIAL ORDER OF BUSINESS 
4a.  (00:01:53)  Seafair Fleet Week Recognition. 
Presentation document(s): Commission agenda memorandum dated October 2, 2012, provided by
Michael McLaughlin, Director of Cruise and Maritime Operations.


PORT COMMISSION MEETING MINUTES                   Page 2 of 12 
TUESDAY, OCTOBER 9, 2012 
Presenter(s): Mr. McLaughlin. 
Mr. McLaughlin introduced Beth Knox, President and CEO of Seafair and the Seafair Foundation,
and Diane Jaffa, National Director, Navy League of the United States, who thanked the Port for its
participation in Seattle Seafair Fleet Week 2012, which they said accommodated over 20,000
visitors and included numerous community events. Ms. Jaffa presented a framed photo collage of
ships entering Elliott Bay to the Commission President. 
5.   (00:08:50)  UNANIMOUS CONSENT CALENDAR 
[Clerk's Note: Items on the Unanimous Consent Calendar are considered routine and are not
individually presented or discussed; however, the Port Commissioners receive the request
documents for review prior to the meeting and have an opportunity to remove items from the
Consent Calendar for separate discussion and vote in accordance with the Commission bylaws.] 
5a.  Approval of the Claims and Obligations for the period of September 1, 2012, through
September 30, 2012, in an amount of $36,510,583.43. 
Motion for approval of consent item 5a  Creighton 
Second  Albro 
Motion carried by the following vote: 
In Favor: Albro, Creighton, Tarleton (3) 
Absent for the vote: Bryant, Holland 
(00:09:39)  PUBLIC TESTIMONY 
As noted on the agenda, public comment was received from the following individual(s): 
Brandon Pedersen, Chief  Financial Officer for Alaska Air Group.  Mr. Pedersen
commented on the structure of the airline lease agreement and concerns over increases
to terminal rents and landing fees proposed in the Port's 2013 budget. He stated that the
2013 expenditure for airline realignment should be funded by Airport Development Fund
cash reserves, rather than by the airlines. 
Fred Felleman, Northwest Consultant for Friends of the Earth. Mr. Felleman commented
on reports of the Port's successful cruise season, provision ofshorepower for ships at
berth, expenses in the 2013 proposed operating budget, Port contribution to the Alaskan
Way Viaduct replacement and Seawall projects, and opportunities for maritime workforce
development. 
6.   DIVISION, CORPORATE, AND COMMISSION ACTION ITEMS 
6a.  (00:16:00)  First Reading and Public Hearing of Resolution No. 3669:  A Resolution of
the Port Commission of the Port of Seattle declaring certain permanent access
easements, and the electrical infrastructure improvements located at: 2585 S 194th St,
SeaTac, WA, on Port property on S 194th/196th St, SeaTac, WA, within the public right








PORT COMMISSION MEETING MINUTES                   Page 3 of 12 
TUESDAY, OCTOBER 9, 2012 
of way on 28th Ave S, SeaTac, WA, within the public right of way on International Blvd,
SeaTac, WA, and at 3150 S 160th St, SeaTac, WA to be surplus and no longer needed
for port district purposes and authorizing the Chief Executive Officer to execute all
documents necessary for conveyance of the permanent access easements on the real
property and title to these electrical infrastructure improvements to the City of Seattle
and Puget Sound Energy. 
Request document(s): Commission agenda memorandum dated October 1, 2012, Resolution
No. 3669, Attachment B diagram, and Attachment C diagram provided by George England,
Program Leader, Aviation Project Management Group. 
Presenter(s): Heather Bornhorst, Capital Project Manager. 
The Commission received a report that explained that the property surplus is part of the completion
of commitments made in order to improve  electrical infrastructure for  construction of the
Consolidated Rental Car Facility and Bus Maintenance Facility. The value of the infrastructure
improvements and related easements is approximately $674,000 and would be transferred to the
City of Seattle and Puget Sound Energy, as previously agreed. 
Motion for first reading and public hearing of Resolution No. 3669  Albro 
Second  Creighton 
PUBLIC HEARING on Resolution No. 3669 
Commissioner Tarleton declared the public hearing for Resolution No. 3669 open. There was no
public comment offered at this time.  Following the opportunity for public comment, the public
hearing on Resolution No. 3669  was closed.  The question recurred on the motion by
Commissioner Albro, seconded by Commissioner Creighton, for first reading and public hearing of
Resolution No. 3669. 
Motion carried by the following vote: 
In Favor: Albro, Creighton, Tarleton (3) 
Absent for the vote: Bryant, Holland 
7.   STAFF BRIEFINGS 
7a.  (00:19:38)  Port of Seattle Radio System Briefing. 
Presentation document(s): Commission agenda memorandum dated September 28, 2012, and
computer slide presentation provided by Colleen Wilson, Chief of Police; Peter Garlock, Chief
Information Officer; David Soike, Director, Aviation Facilities and Capital Program. 
Presenter(s): Chief Wilson and Mark Reis, Managing Director, Aviation Division.






PORT COMMISSION MEETING MINUTES                   Page 4 of 12 
TUESDAY, OCTOBER 9, 2012 
Staff provided a presentation to the Commission that included the following information: 
Technical limitations and aging equipment require the upgrade of emergency dispatch
equipment and a radio system core, or "switch"; 
It is important to consider interoperability of the Port's radio system with that of King
County and other local, state, and federal jurisdictions; 
The Port's system accommodates both uniformed services and normal operational
needs, including Marine Maintenance, Airport Maintenance, and Airfield Operations; 
A new system core, whether integrated into a King County system or not, is expected to
provide additional channels than currently available; 
Locations of Port radio system towers were noted; 
The role of Airport operations is crucial to recovery during an event of natural disaster,
and the need for a failsafe system was emphasized; and 
It is important to consider regional cooperation and interoperability and to protect the
Port's interests in any interjurisdictional agreements. 
In response to Commissioner Creighton, Mr. Reis noted that an issue for consideration is the
relative cost of having a fully integrated radio system versus an independent, but interoperable,
one. He stated that transmission of data is a growing consideration for future dispatch systems. In
response to Commissioner Albro, Chief Wilson commented that the exact nature of a fully
integrated King County system has not been proposed and that the feasibility of maintaining the
Port's ability to insulate its system during an emergency is a concern. Commissioner Albro
commented on the need to quantify system use and allocation of user priority and cost in any
proposal to integrate the Port's radio system with that of King County. Commissioner Tarleton
commented on the need for a new system to serve its use for possibly 20 years while also
accommodating rapid technology developments and significant population and business growth in
the region and at Port facilities.
7b.  (00:51:05)  Briefing on Proposed Resolution No. 3668. 
Presentation document(s):  Commission agenda memorandum dated October 2, 2012, draft
Resolution No. 3668, September 1, 2009, nondiscrimination motion, Resolution No. 3166, and
redline version of Resolution No. 3668 provided by Ralph Graves, Managing Director Capital
Development, and Craig Watson, General Counsel. 
Presenter(s): Mr. Graves and Mr. Watson. 
Staff provided a presentation to the Commission that included the following information: 
The current nondiscrimination resolution, No. 3166, was adopted in 1994 and opposes
employment discrimination and supporting Affirmative Action by Port contractors; 
Resolution No. 3166 includes requirements relating to establishment of goals and
timelines for achieving levels of minority and women's representation in employment by
contractors and associated contractor commitment statements and submission of
workforce composition statistics;



PORT COMMISSION MEETING MINUTES                   Page 5 of 12 
TUESDAY, OCTOBER 9, 2012 
Initiative 200 made many of the mandatory, goal-based measures of Resolution No.
3166 illegal as race- or gender-based preferences, if not required by another program
such as federal programs; 
The goal requirements of Resolution No. 3166 were eliminated upon passage of
Initiative 200, but not supporting language referencing Affirmative Action programs and
plans; 
Proposed Resolution No. 3668 would strongly support equal employment opportunity,
oppose discrimination by Port contractors, and encourage workforce diversity, without
requiring the previously prescribed commitment forms; 
The proposal would make Port policy consistent with State law, is similar to changes
made by the King County, and would decrease paperwork and contractor costs; 
Many of the statistics previously required to be reported by Resolution No. 3166 are
available from other sources; 
When federal grant funding of projects attaches requirements such as for Affirmative
Action measures, these would continue to apply; 
In response to Commissioner Albro, Mr. Graves noted that notice by a contractor of collective
bargaining agreements that may impede efforts to comply with the resolution is optional for the
contractor and that workforce composition is affected by union operations. Commissioner Tarleton
stated an interest in measuring whether the changes to the resolution would improve efficiency of
contract approval. Commissioner Albro requested further clarification in the resolution of the role of
unions in meeting equal opportunity aspirational goals. 
At the discretion of the Chair, the following agenda item  
7c.  Metrics and Continuous Process Improvement Initiatives. 
was postponed to a subsequent Commission meeting. 
7d.  (01:07:00)  2013 Preliminary Operating Budget Briefing. 
Presentation document(s): Commission agenda memorandum dated September 19, 2012, and
computer slide presentation provided by Dan Thomas, Chief Financial and Administrative Officer,
and Michael Tong, Corporate Budget Manager. 
Presenter(s): Mr. Thomas; Mr. Tong; Mark Reis, Managing Director, Aviation Division; Borgan
Anderson, Director, Aviation Finance and Budget; Boni Buringrud, Director, Seaport Finance and
Budget; Joe McWilliams, Managing Director, Real Estate; and Ralph Graves, Managing Director,
Capital Development. 
Aviation 
The presentation on the Aviation Division preliminary operating budget for 2013 included the
following relevant information: that Seattle-Tacoma International Airport is expected to experience
moderate growth of 2.2 percent in 2013 despite economic uncertainty; cost per enplanement (CPE)
is the primary measure for aeronautical cost management due to the cost-recovery formulas in
use, while net operating income (NOI) is the primary measure for nonaeronautical business, which

PORT COMMISSION MEETING MINUTES                   Page 6 of 12 
TUESDAY, OCTOBER 9, 2012 
is focused on cash flow.  Goals for debt service coverage and unrestricted cash balance were
identified.
In response to Commissioner Albro, Mr. Anderson and Mr. Thomas explained that the goal of 10
months unrestricted cash flow in the event of a catastrophic event is at the low end of the expected
range for similar airports by Moody's Corporation. In response to Commissioner Albro, Mr.
Anderson and Mr. Reis described the factors affecting use of aeronautical revenue to fund the
expense costs of the airline realignment rather than using cash balances, including consistency
with the current airline lease, the aeronautical needs driving the realignment, and the potential for
the use of Airport equity to fund realignment costs rather than through the lease provisions to be
considered a gift of public funds. 
Additional information presented summarized the 2013 budget drivers, including Century Agenda
preliminary goals affecting international flight incentive programs, the Airport Sustainability Master
Plan, and energy conservation measures, and expense drivers such as payroll and contractual
increases, a full year of Consolidated Rental Car Facility and busing services, and a peak year of
airline realignment spending. Revenue drivers were summarized, including assumption of a oneyear
extension of the current airline signatory lease and operating agreement and increases to
nonaeronautical revenues. Aviation expenses for 2013, which are estimated to increase by 10
percent, were summarized.
Commissioner Tarleton noted that expense growth for 2013 was compared to 2012 budget, and
was not representative of realignment program cost growth. 
New budget requests were described, including programs tied to safety, capacity, asset
management, customer service, environmental innovation, airline cost management, organizational
and employee development needs, community partnerships and noise compatibility, and various
miscellaneous requests such as land appraisals. New budget requests related to non-airline
business were summarized, including a valet management contract, concessions leasing
consultant, and land development costs related to the Des Moines Creek Business Park. 
The methodology was described for determining that overall aeronautical costs are expected to
increase by less than three percent, when utility savings is factored. It was noted that including
costs for airline realignment and regulated materials management brings growth to 8.2 percent. 
In response to Commissioner Tarleton, Mr. Anderson explained that allocation of costs within the
terminal cost center of the aeronautical rate base is according to square footage, including the
international arrivals facility, and that in order to manage the rates charged to the airlines, some
international arrivals facility costs are removed from the rate base in the annual budget. Mr. Reis
pointed out that this option is based on its inclusion in the airline lease agreement. He explained
that absent this methodology, the relative cost burden in a strict cost-recovery  model on
international airlines would put the Airport at a competitive disadvantage compared to other West
Coast airports. 
Mr. Reis noted that airline concerns over Airport cost increases are related to a possible 20-percent
increase in terminal rental rates and a possible eight-percent increase in landing fees. He stated

PORT COMMISSION MEETING MINUTES                   Page 7 of 12 
TUESDAY, OCTOBER 9, 2012 
that increases of this size may be necessary in part due to the decision made in 2003 and
supported by the airlines to defer payment on principal for bonds issued in 2001 until 2013 in order
to temporarily reduce airline costs and improve airline cash flow at the time.  He stated that
compensating for over-collection of fees in 2011 resulted in lower 2012 fees than was reflective of
the 2012 budget, which skews comparison between the 2012 and 2013 fee projections. 
Non-aeronautical revenue and operating expenses were summarized, with emphasis on net
operating income, which is adjusted after application of a customer-facilities-charges (CFC) surplus
of $2.8 million to approximately $2.4 million.  In response to Commissioner Creighton, Mr.
Anderson explained that the fund balance of CFC surplus funds is expected to offset future capital
improvements in lieu of new bond issuance. 
Non-airline business revenues and key indicators were summarized, including concessions sales
per enplanement of $11.25. Revenues and expenses were presented by division and department.
It was noted that full-time-equivalent (FTE) positions are reduced by 11.3 FTEs, due to transfer of
security terminal access control activities from the Airport to the Transportation Security
Administration. 
The regular meeting was recessed at 3:07 p.m. and reconvened at 3:15 p.m., chaired by
Commissioner Tarleton. 
Seaport 
The presentation on the Seaport Division preliminary operating budget for 2013 included the
following relevant information:
Actual 2012 twenty-foot-equivalent-unit (TEU) volume is expected to decrease 17
percent from 2012 budget to 1.66 million TEUs; 
Cruise passengers are expected to decrease three percent from 2012 budget to 851,000
passengers; 
Grain volume is expected to decrease to 3.4 metric tons due to drought in the Midwest
and market conditions in South America; 
Seaport expense drivers include continuation of asset condition assessments,
maintenance dredging, stormwater compliance, Northwest Ports Clean Air Strategy
implementation, and increased utility cost; 
Seaport Org revenues and expenses were summarized, and it was noted that after
factoring security grant reductions, operating revenue is expected to increase 11.9
percent in the Seaport Division; 
Increase in budgeted container revenue for 2013 is related to refunding of revenue
bonds for Terminal 18; 
Revenue increases in Cruise and Maritime operations are largely due to changes in the
Port's agreement with Cruise Terminals of America and also due to change in the tariff; 
Org expenses were summarized by reporting group and the Seaport expense budget
was presented; 
Total operating expenses are proposed to increase approximately two percent, or
$396,000, and total expenses after factoring changes to security grant expenses and
environmental remediation liability will increase by about 0.4 percent;

PORT COMMISSION MEETING MINUTES                   Page 8 of 12 
TUESDAY, OCTOBER 9, 2012 
Payroll costs are expected to increase three percent, consistent with Corporate
guidelines; 
Increases to utility costs were noted and it was explained that approximately 85 percent
of increased utility cost is billed to Port tenants; 
Reductions to various Seaport initiatives were noted; 
Initiatives proposed for 2013 were summarized, including details on expenses for
implementation of the Northwest Ports Clean Air Strategy and Environmental
Remediation Liabilities; 
Seaport FTEs are proposed at 60 FTEs for 2013, slightly higher than the 59.9 FTEs in
2012; 
Application of the Seaport operating budget to the Century Agenda were noted; 
The overall Seaport operating budget was summarized, and it was noted that an
increase in net operating income of $11.1 million, or 21.5 percent compared to the 2012
budget, is expected; 
The budget summary for container business indicates an increase of net operating
income of $11.6 million, or 30 percent, compared to 2012 budget; 
It was explained that Seaport expenses include groups within the Seaport division, such
as Cruise and Maritime Operations, Lease and Asset Management Group, and Seaport
Finance; and 
Key risks for Seaport business were noted. 
Commissioner Albro noted a fundamental misalignment of the interests of the Port and the terminal
operators apparent from falling TEUs with no concurrent drop in Port revenue. Commissioner
Tarleton compared the Seaport trends to the Airport's interest in aligning with tenant concerns by
closely following cost per enplanement. 
Commissioner Tarleton commented on opportunities inherent in the Seaport's 10-yearContainer
Terminal Access Study to better understand freight movement between Port operations in the
Duwamish Manufacturing and Industrial Center (MIC) and the Ballard/Interbay MIC. 
In response to Commissioner Creighton, Stephanie Jones-Stebbins, Director of Seaport
Environmental Services, commented that the At-Berth Clean (ABC) Fuels program will continue to
provide incentive for use of fuels cleaner than required by international standards and will continue
to be funded until 2015, when the international standards will be comparable to the ABC Fuels
standards. 
Real Estate 
The presentation on the Real Estate Division preliminary operating budget for 2013 included the
following relevant information:
Key Real Estate Division budget assumptions include a 92-percent recreational marina
occupancy rate, 78-percent occupancy rate at Fishermen's Terminal, and 70-percent
occupancy at the Manufacturing Industrial Center in Ballard; 
There is a target for 95-percent occupancy for commercial properties by the end of 2013;

PORT COMMISSION MEETING MINUTES                   Page 9 of 12 
TUESDAY, OCTOBER 9, 2012 
Ownership of the Eastside Rail Corridor is expected to transfer to King County by the
end of 2012; 
Execution of the deferred maintenance plan is expected to continue in 2013; 
Org revenues for the Real Estate Division are expected to increase by 0.3 percent, or
$102,000, compared to the 2012 budget; 
Real Estate Division expenses are expected to increase by 5.8 percent, or $2.1 million,
including increases to commercial portfolio management, maintenance costs, and
increased contingency; 
Payroll expenses are projected to decrease by 1.6 percent, or $283,000, despite overall
increases built into Port salary and benefits structures; 
The shift of maintenance salaries and wages away from the expense budget contributed
to the small size of the expense budget increase for 2013; 
The total baseline proposed expense budget represents an increase of 1.3 percent, or
$440,000; 
Conclusion of deferred maintenance work in 2013 was noted, and deferred maintenance
expenses were highlighted; 
A Real Estate contingency of $500,000 is set aside in 2013 to mitigate the risk of new
maintenance efficiencies not translating into the expected level of savings; 
A list of deferred maintenance projects was presented; 
It was noted that slide 63, regarding Real Estate FTEs, contained a typographical error
and should have shown a reduction of three, not four, FTEs due to closure of the
General Services Print Shop; 
The duties of four FTEs for Maintenance Planners were described; 
Overall revenues and expenses were summarized, and it was noted that revenue is
expected to rise by $115,000, or 0.4 percent; that expenses increased for staffing, tenant
improvements, broker fees, and contingency funding; and that expenses are budgeted to
increase by approximately $1.8 million, an increase of 4.8 percent; and 
Key risks for the Real Estate Division were noted, including higher vacancies in
commercial properties and recreational marinas and continued expenses related to
maintaining the Eastside Rail Corridor. 
Commissioner Creighton commented on the delay in King County's approval of purchase of the
Eastside Rail Corridor and the Port's continued maintenance costs until the rail corridor changes
hands. In response to Commissioner Tarleton, Joe McWilliams, Managing Director, Real Estate
Division, commented on the Port's ongoing maintenance costs after transfer of the Corridor to
other jurisdictions, including King County. 
Capital Development 
The presentation on the Capital Development Division (CDD) preliminary operating budget for
2013 included the following relevant information:
Priority goals noted include delivery of projects to operating divisions; emergency
preparedness; and development of CDD employees; 
Budgets for 2012 and 2013 were compared; 
The 2013 budget was presented by department;

PORT COMMISSION MEETING MINUTES                  Page 10 of 12 
TUESDAY, OCTOBER 9, 2012 
Small works construction contracts are reduced from $992,000 in the 2012 budget to
$348,420 in the 2013 budget; 
There is an increase of FTEs by 10, primarily driven by the needs of the Aviation
Division; 
In response to Commissioner Albro, Mr. Graves explained that the acquisition planning for the
project is not complete and that portions of that project may eventually fall under the Small Works
Contracting category. 
Corporate 
The presentation on the Corporate Division preliminary operating budget for 2013 included the
following relevant information:
The increase in the Corporate budget for 2013 is 2.8 percent over the 2012 budget; 
Key expense drivers include payroll increases, shifting of payroll costs from capital to
expense, increased insurance premiums, particularly in connection with activation of the
new Consolidated Rental Car Facility, Century Agenda support, economic impact
statement update, Port Jobs funding increases, and shift of information systems upgrade
to expense budget with increased use of remotely hosted technology solutions (cloud
computing); 
Corporate cost as a percentage of total operating revenue and expense has declined; 
Decreases in Police Department overtime expenses for wages and benefits were noted; 
Expense increases for Labor Relations and Information and Communications
Technology (ICT) were described as owing to a shift away from capitalization of payroll
due to changes in accounting rules and decline in projects; 
Reduction of Commission contingency budget was noted; 
The increase to the Corporate baseline budget was stated at 1.7 percent before factoring
new budget requests, which bring the increase to 2.8 percent; 
Of approximately $3 million in new budget requests, roughly $1.5 million are included in
the proposed operating budget, including requests for the Century Agenda, tourism
promotion, full 2013 funding for Port Jobs, the five-year economic impact study, risk
management and learning management system upgrades, new FTEs for implementation
of the Century Agenda and for an internal investigator for violations of the Port Code of
Conduct, and services related to an internal ICT audit; 
The Corporate operating budget was summarized by department, major budget changes
were noted, and a summary of FTEs was presented indicating a net reduction of FTEs
from the 2012 budget of 1.5 for a total of 449.2 FTEs; and 
Corporate costs for 2013 were presented to be 14.2 percent of total revenue and 23.8
percent of total expenses. 
Commissioners Tarleton and Albro stated their support for increasing the budgeted amount for the
economic impact statement from $185,000 to $300,000 to ensure examination of economic
impacts related to the Airport and the North Pacific Fishing Fleet.

PORT COMMISSION MEETING MINUTES                  Page 11 of 12 
TUESDAY, OCTOBER 9, 2012 
Portwide 
The presentation on the Portwide preliminary operating budget for 2013 included the following
relevant information:
Preliminary non-represented payroll assumptions include provision for average pay-forperformance
increases by three percent; 
Salary ranges are proposed to increase by two percent, although not reflected in the
budget due to minimal cost impact; 
Medical and dental costs are expected to increase 2.2 percent, compared to market
trends of 6-8 percent due to the Port's self-insured status, change of health care provider
in 2013, and minor increases in employee premium sharing; 
And the employer's Public Employee Retirement System (PERS) contribution is
anticipated to increase from 7.21 percent to 9.1 percent, with a blended rate of 8.16
percent; 
Overall operating revenue is budgeted to increase 7.2 percent, or $37 million, largely
due to revenue bond refunding for Terminal 18; 
Overall operating expenses are budgeted to increase 6.6 percent, or $20.5 million,
largely due to expenses in the Aviation Division; 
Total payroll costs are budgeted to increase 3.4 percent, or $7 million; 
Non-payroll expenses are anticipated to increase 13.5 percent, or $13.4 million; 
A comprehensive summary of operating revenues and expenses  was presented,
showing the tax levy at $73 million, $14.3 million in lower capital contributions due to
decreases in Third Runway grant funding, and lower interest income compared to 2012; 
Reduction of bond interest expenses was attributed to revenue refunding bond issuance;
and 
Portwide FTEs were summarized by division and are proposed to total 1,788.6 FTEs for
2013, and increase of 1.4 FTEs compared to 2012 budget. 
8.   NEW BUSINESS 
(03:44:40)  Update on ASIG Safety Conditions at Seattle-Tacoma International Airport. 
Mr. Reis noted public testimony on August 7, 2012, related to safety of aircraft fueling operations at
the Airport and a related press conference on October 3, 2012, that included comments related to 
unsafe fueling system equipment. He reported that the Federal Aviation Administration (FAA)
Part 139 certification process (Title 14, Code of Federal Regulations, Part 139  Certification of
Airports) includes annual investigation of the fueling systems at Seattle-Tacoma International
Airport, including safety considerations. He noted that the Airport has never been cited by the FAA
for fueling system deficiencies.
Port of Seattle Firefighter Leon Gutierrez reported that he conducts approximately 270 inspections
of every piece of fueling equipment at the Airport every 90 days, including 35 fuel tankers, 15
vehicle hydrant trucks, 40 stationary hydrant carts, 161 hydrant pits, one load rack, and an eighttank
fuel farm with a capacity over 24 million gallons of jet fuel. He added that he inspects 115
emergency fuel shutoff mechanisms every six months. He explained that an FAA inspector

PORT COMMISSION MEETING MINUTES                  Page 12 of 12 
TUESDAY, OCTOBER 9, 2012 
reviews the records of these inspections on a quarterly basis and conducts additional spot
inspections. 
Mr. Reis stated that on October 5, 2012, in response to the October 3 allegations, the FAA
conducted an inspection. Although no evidence was found to support the allegations of safety
violations, Mr. Reis reported he sent a letter to Working Washington reiterating the importance to
the Airport of airfield safety and requesting further information about any safety issues that may
have been missed by Port and FAA inspectors. 
Mr. Reis reported that fueling contractor ASIG (Aircraft Service International Group) had a
contingency plan in place should its fuelers strike as announced on October 3 and that a temporary
restraining order issued on October 5 to ensure that no actions would be taken to initiate a strike
had been extended to October 17. 
9.   POLICY ROUNDTABLE 
None. 
10.  ADJOURNMENT 
There being no further business, the regular meeting was adjourned at 5:00 p.m. 

Bill Bryant 
Assistant Secretary 
Minutes approved: January 8, 2013.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.