6b supp
Item No.: 6b_supp Meeting Date: August 4, 2015 Stand-by Power Facility Site map N PSE Sub-Station S 188th St Standby Power Facility Location Airport Fuel Tanks th Ave S 28 S 192nd St Location will not be affected by Master Plan Stand-by Power Facility (SPF) Scope: 25-30 MW Standby Power Facility 24 hour fuel tanks & dual fuel option Timeline: (18-24 months from approval) SPF Design Complete: ~ April 2016 Begin Construction: ~ August 2016 Completion: ~ June 2017 Flexible Facility can be expanded if necessary 3
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.