4b supp
Item No.: 4b_supp Date of Meeting: May 26, 2015 Central Terminal Expansion (CTE) Heating Ventilation Air Conditioning (HVAC) Upgrade C800722 WP# U00199 CTE HVAC Upgrade C800722 Project Background Strong passenger growth creates more traveler congestion in CTE and drives more demand for restaurant service. The 2005 CTE project provided mezzanine level space for later development when supported by passenger demand. Forecast growth in service demand requires development of the of the North and South CTE mezzanines for public use in 2016- 2017 The existing CTE Air Handling Units (AHUs) cannot provide sufficient capacity for any additional space occupancy. Additional HVAC is necessary in CTE to serve growing numbers of travelers 2 CTE HVAC Upgrade C800722 Project Scope Design and construction of two new roof top mounted AHUs to provide additional HVAC capacity. Provide ductwork from the new AHUs to the CTE mezzanine level for restaurant development. Redirect the existing CTE emergency smoke control system pathways. Detailed design and construction adjacent to, and above, businesses and is required 3 CTE HVAC Upgrade C800722 Project Locations New Space on New Space on South North Mezzanine Mezzanine level level Existing North Existing South Penthouse on Penthouse on roof roof Possible New Possible New North South Penthouse Addition Penthouse on roof Addition on roof Co-location of new and existing HVAC equipment is cost effective and efficient 4 CTE HVAC Upgrade C800722 Undeveloped Space Viewed from Below SOUTH MEZZANINE NORTH MEZZANINE SPACE SPACE Design is underway for two new elevators for easy public access 10,000 square feet of undeveloped space will serve the traveling public CTE HVAC Upgrade C800722 Project Schedule Start Design - 2nd quarter 2015 Complete Design - 2nd quarter 2016 Start Construction - 3rd quarter 2016 Complete Construction - 4th quarter 2017 Design would be initiated soon 6 CTE HVAC Upgrade C800722 Project Budget Design $1,114,000 Construction $5,078,000 Sales Tax $ 420,000 Total $6,612,000 This request is for design funds only. Construction funds to be requested later CTE HVAC Upgrade C800722 South mezzanine as seen from Central Terminal floor CTE HVAC Upgrade C800722 South mezzanine elevator CTE HVAC Upgrade C800722 View from south mezzanine to Central Terminal floor CTE HVAC Upgrade C800722 South mezzanine CTE HVAC Upgrade C800722
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.