Exhibit A

fem-975$ il'f'LL1
Part Cemmse-Esa's QM

Alaskan Way Viaduct
"PL"EMEO'G'J

FUNDING
overview

Funding sources (shown in millions!
'
l                                        l                    l
Local   - 55622.8 ;           i           |                                  I
- i  l l '
3
Other state i! 2:23     i           E           l                     i

l                                        '
l                                                            g
W p 33333                    l
i                    , .
,
.                                   1
'
Port of Seattle '7 - Sizig     I     I

'        i                    5

L
Federal '   

Gas Tax                                                              l
'
4
I                    I
'
Total   $3,1452
7
___

Budgeted funds   I Remaining funds

11

Alaskan Way Viaduct
R E P LAC E M E N T
CONTRACT
status"

Budgeted amount    Percent complete
Bored tunnel
.  Design 

- Tunneling machine and conveyor system

- Interior structures
- Tunnel liner fabrication
-       Tunnel mining and liner installation

South portal roadways                                                                              --I
South cut-and-cover

- Ramps and other highway connections

Operations buildings and tunnel systems
- North and south buildings and systems

North portal roadways
North cut-and-cover
- Ramps and other highway connections _|

Balation fund


Bond and insurance allowance                                                                        --|


Advance mitigation


Project management

l Paid to date   Cl Remaining funds
74
percent- -

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.