6a

PORT OF SEATTLE 
MEMORANDUM 
COMMISSION AGENDA               Item No.      6a 
ACTION ITEM 
Date of Meeting     January 13, 2015 
DATE:    January 5, 2015 
TO:      Ted Fick, Chief Executive Officer 
FROM:   David Soike, Director, Aviation Facilities and Capital Programs 
Arland Fagerstrom, Manager Airlines Systems and Services 
SUBJECT:  Manual Encoding of Baggage for Airport Baggage System Number C60 
Amount of This Request:         $775,000   Source of Funds:   Airport Development
Fund 
Est. Total Contract Cost:         $775,000 
ACTION REQUESTED 
Request Commission authorization for the Chief Executive Officer to execute a purchased
services contract for Manual Encoding Services at Seattle-Tacoma International Airport for up to
five years, not to exceed $775,000. 
SYNOPSIS 
This contract request would provide the equivalent of approximately 18 full time job positions
that would use hand held devices to manually scan bar code tags on travelers' bags that have
been missed by automatic bar code readers as the bags travel through the baggage conveyor
security and delivery systems. This work is necessary since automated readers capture only 90%
of bag tags as they move rapidly through the conveyor system.
This contract will procure the services to provide manual encoding for the C60 system which
handles approximately 4.5 million bags per year. The international airlines currently hold a
contract for this service but have asked that the Airport take full responsibility for the contract
work because the baggage system is an Airport owned and operated system, and the Airport can
distribute costs per the existing signature lease operating agreement with all the airlines.
Manual encoding on the C60 conveyor system aids domestic outbound bags for various airlines
such as Delta, United, USAir, and Virgin; and manual encoding also aids transfer bags between
airlines to benefit all of the incoming international airlines and those airlines such as Alaska,
United, etc., who receive the bags and traveler to carry them to the connecting destination.
The Port will issue a request for proposals and expects a competitive response since there are
half a dozen prospective bidders in the local marketplace. The contract will have a three-year
initial term along with two (2) one-year options to extend. The 2015 operating expense is
estimated at $146,000 based upon wage rates specified in Resolution No. 3694 and is included in
the approved 2015 operating budget.

Template revised May 30, 2013.

COMMISSION AGENDA 
Ted Fick, Chief Executive Officer 
January 5, 2015 
Page 2 of 4 
BACKGROUND 
Airlines have historically contracted with vendors to provide this service on the various baggage
systems throughout the Airport. Most recently this portion of the work was included in a
contract that also provided public-facing Federal Inspection Services (FIS) customer service and
baggage handling assistance. The airlines earlier asked the Airport to take over this publicfacing
work. At that time the airlines decided to separate out this system facing manual encoder
portion of the work. Consequently, that left the manual encoder position unaccounted for; and
the airlines have now asked the Port to implement and oversee a new contract to cover this work. 
Seattle-Tacoma International Airport handles approximately 11 million departing bags each year
through six baggage systems. The single C60 portion handles 4.5 million of those bags for the
southern half of the airport. Three of these conveyor systems use an automated tag reader (ATR)
system, similar to a grocery store barcode reader, to identify baggage tags and route them
through the baggage system for screening and sorting before being loaded onto aircraft. 
The ATRs are only able to capture about 90% of the bag tags for various reasons. Tags that
cannot be read by the ATRs are routed to a secondary location for scanning that is staffed by
contracted personnel called manual encoders. Manual encoders use a hand scanning device and
touchscreen monitor to facilitate the routing of the 10% of bags that are not read at the ATR. 
PROJECT JUSTIFICATION AND DETAILS 
The purpose of this request is to provide uninterrupted manual encoding of baggage through the
appropriate baggage system (only C60 at this time). Manual encoding is also used on the C1 and
C88 baggage systems where Alaska Airlines, as the major user of those systems, has chosen to
provide this service at their own expense. The manual encoding process is essential to the proper
distribution of baggage to the appropriate airlines within each system. This request will provide
that service under the oversight of the Port of Seattle. Airlines have typically overseen this
contract but have relied on the Port of Seattle to 'manage' it. Since the baggage system is
operated by the Port of Seattle, it has been deemed appropriate by the airlines that the Airport
should hold and oversee the contract. 
Scope of Work 
The contractor will be responsible for the timely scanning of all bags diverted to the manual
encoding station. For the purposes of this contract, the manual encoding station is located at the
C60 baggage system encoding station. 
Service includes scanning bags with a handheld scanner, reading and understanding airline
baggage tags and how the routing of each bag is listed on the bag tag, then, if necessary,
manually entering the appropriate entry on the touch screen at the encoding station. 
In the event the handheld scanning tool cannot scan the bag, the staff member will have to read
the bag tag properly, understand which airline the bag needs to be delivered to, and then enter the

COMMISSION AGENDA 
Ted Fick, Chief Executive Officer 
January 5, 2015 
Page 3 of 4 
appropriate destination on the touchscreen control panel at the encoding station.  This may
include an airline and flight number, a designated baggage make-up location, or any other
method of dispatch that is enabled at the manual encoding station. 
Schedule 
An RFP for these services will be advertised in the first quarter of 2015. The procurement is
expected to be completed by the end of the first quarter of 2015. 
FINANCIAL IMPLICATIONS 
This contract will comply with the Quality Jobs Initiative and is expected to cost about $775,000
over the course of five years. 
Budget Status and Source of Funds 
Services for the first year of this contract are expected to cost $146,000 and are included in the
2015 operating budget. Expenditures for future years will be requested each year in the annual
budget process. The funding source will be the Airport Development Fund. These costs will be
fully recovered from the airlines, adding slightly less than $0.01 to airline cost per enplaned
passenger (CPE). 
STRATEGIES AND OBJECTIVES 
This contract supports the Century Agenda objective to advance this region as a leading tourism
destination and business gateway by meeting the region's air transportation needs at Seattle-
Tacoma International Airport and encouraging the cost-effective expansion of domestic and
international passenger service. 
This contract supports the Airport's strategy to "Operate a world-class international airport" by: 
Ensuring safe and secure operations 
Anticipating and meeting the needs of our tenants 
ALTERNATIVES AND IMPLICATIONS CONSIDERED 
Alternative 1)  Do nothing. Require the airlines to continue oversight and management of the
existing contract. The current method of cost distribution is based on the contractor's records of
activity. This is a less accurate method than what the Port of Seattle can provide. This alternative
would not be responsive to the airline request for the Port to manage the contract and is not the
recommended alternative. 
Alternative 2)  Execute a purchased services contract for Manual Encoding Services. There are
several known companies that can provide this service. The work is easily taught and can
provide a quality entry-level job opportunity. Conducting a competitive bidding process will
enable the Port of Seattle to procure the best available terms for the next several years and ensure
compliance with the Port's Quality Jobs Initiative. Additionally, if the Port provides contractual

COMMISSION AGENDA 
Ted Fick, Chief Executive Officer 
January 5, 2015 
Page 4 of 4 
oversight the costs can be equitably distributed among the airlines using the system. This is the
recommended alternative. 
ATTACHMENTS TO THIS REQUEST 
None 
PREVIOUS COMMISSION ACTIONS OR BRIEFINGS 
None

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.