4c Supp
Item No.: 4c_supp Meeting Date: August 5, 2014 Main Terminal Low Voltage System Upgrade Many Factors Drive this Project Risk of interruption of operations due to old equipment at or beyond end of life Violations with current building codes that include potential safety impacts System configuration obsolete daisy chained Panel schedules grossly outdated risk during shutdowns Maintenance issues such as lack of replacement parts Existing system has no capacity for new added customer equipment Code Violations Electrical Room Inside Chase Electrical Room Inside Chase Feeder Upgrades Panel Schedules Extent of Work Equipment in Main Terminal to be replaced: 21-33+ individual risers 150+ electrical panelboards 300,000+ linear feet of conductor/wiring(~57 miles) 30 new meters 15 new electrical closets/rooms 9 motor control centers & 30 circuit breakers 3 distribution panels & transformers
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.