Item Number: 7b_supp Date of Meeting: March 11, 2014 SeaTac Airport Energy Conservation Program Energy Conservation SeaTac Airport Conservation at SeaTac Savings Realized Long and Short Term Energy Forecasts ESCO Process Scope of Mechanical Stage 3 Conservation Projects - History The SeaTac energy conservation program has reduced energy consumption by 25% over the last 15 years SeaTac electrical energy consumption is now at a 10 year low Recent projects have utilized the State of Washington Energy Savings Performance Contracting and a pre-qualified Energy Service Company (ESCO) University Mechanical Contractors McKinstry Conservation Projects - History Project Completion Energy Savings (Annual) Dollar Savings (Annual) Stage 1 2001 1,489,204 kWh Electricity $ 134,028 Lighting Stage 2 & 3 2005 5,224,054 kWh Electricity $470,165 Lighting Stage 4 2006 3,092,040 kWh Electricity $278,284 Lighting Parking Garage 2013 1,731,878 kWh Electricity $ 155,869 Emergency Lighting Stage 1 Mechanical 2008 184,765 Therms Natural Gas $317,025 2,701,322 kWh Electricity Stage 2 2013/2014 64,844 Therms Natural Gas $256,048 Mechanical 2,556,781 kWh Electricity Savings / Advantages SeaTac Airport Conservation Program Identify and pursue Energy Conservation Measures that have a favorable ROI Measures that do not meet minimum performance threshold do not move forward Guaranteed savings and project costs Utilize Grants and Incentives effectively Improve Efficiency and Reduce Carbon Footprint Improve Occupant Comfort Renewal and Replacement of Old Systems with New Energy Efficient Equipment 30 Year Energy Forecast Short Term Energy Forecast New Large Loads Project Name Year SQFT MWh Added aMW Stage 2 Mechanical 2013/14 N.A. -2,557 -0.29 Pre Conditioned Air (PC-Air) 2014 N.A. 4,267 0.49 Electric Ground Service Equipment (EGSE) 2014 N.A. 3,504 0.40 Electric Ground Service Equipment (EGSE) 2015 N.A. 5,254 0.60 Miscellaneous (EE, Bag, etc.) 2015 N.A. 1,151 0.13 South Satellite Renovation 2016 183,500 -1,153 -0.13 International Arrivals Facility (IAF) 2018 245,000 7,275 0.83 New Airport Hotel 2018 185,000 2,472 0.28 North Satellite Renovation (North Star) 2020 275,250 2,321 0.26 Stage 3 Mechanical Conservation 2014/15 N.A. TBD TBD Parking Garage Lighting Upgrade 2014/16 N.A. -5,501 -0.63 2020 Electrical Load Growth Forecast 17,033 1.94 2020 Forecast Summary Current SeaTac Electrical Load 141,859 16.19 2020 SeaTac Electrical Load 158,892 18.14 Energy Goal (Tier 1 Power) 153,615 17.54 Conservation Shortfall (without Stage 3 Mechanical) 5,277 0.60 State Energy Savings Performance Contracting Process: 1.Outline scope of work to audit 2.Enter agreement with State ** 3.Contract with ESCO ** 4.ESCO performs energy audit and provide guaranteed costs and savings 5.Contract with ESCO to design and construct viable measures ** 6.Measurement and verification ** Commission Approval Required Commission Schedule Stage 3 March 2014: Request for Energy Audit funding Analyze and develop conservation measures including, costs, savings and preliminary designs December 2014: Request for Design and Construction funding Design and construct those conservation measures that meet the minimum performance criteria Project Stage 3 Anticipated Improvements Replace constant volume with variable volume air handling terminal boxes Chilled water system pumping optimization Existing Equipment Project Stage 3 Anticipated Improvements Occupancy adjustments for controlling building ventilation Air curtains to reduce air flow in/out of main terminal Project Stage 3 Project Budget March, 2014 Authorization Request $ 349,440 Total Estimated Project Cost $3,500,000 ESCO Projects are Low Risk The performance of each Energy Conservation Measure (ECM) is independently evaluated ECMs must guarantee a 10% ROI or the Port has no obligation to proceed or pay associated fees Port of Seattle Financial Risk $25,700 Termination Fee ESCO Design Fees $0 - $199,440 Port Project Management Costs $150,000 Project costs and savings will be included in terminal costs paid by airlines Questions
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.