7c attach 1

ITEM NO: ______7c_Attach 1_____ 
DATE OF MEETING: AUGUST 7, 2012
Impact of a SoDo Arena on 
Port of Seattle Operations 

PREPARED FOR: 


PREPARED BY: 

6544 NE 61ST STREET, SEATTLE, WA 98115 
PH: (206) 523-3939  FX: (206) 523-4949 

AUGUST 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Table of Contents 
1. OVERVIEW ......................................................................................................................................... 1 
1.1. What are the Port's primary operational concerns about a new arena in SoDo? .................... 2 
1.2. What are the flaws of the arena's traffic study? ...................................................................... 7 
2. PORT TERMINAL OPERATIONS .......................................................................................................... 8 
2.1. Where are the Port's container terminals? ............................................................................... 8 
2.2. What is the Port's historic and current annual container throughput? .................................. 10 
2.3.  How does the current throughput compare to past forecasts? ............................................. 11 
2.4.  How does the throughput fluctuate by month? ..................................................................... 13 
2.5.  How much of the cargo is imported versus exported? ........................................................... 13 
2.6.  What are the origins and destinations of Port cargo and how does it get there? .................. 14 
2.7.  How many trucks trips per day would Port growth generate? ............................................... 15 
2.8.  Where are the trucks going? ................................................................................................... 16 
2.9.  When do trucks travel and how do stadium events affect truck activity? ............................. 17 
2.10. How would extended gate hours affect hourly truck volumes? ............................................. 19 
3. TRANSPORTATION ISSUES ............................................................................................................... 23 
3.1.  Where are the local bottlenecks? ........................................................................................... 23 
3.2.  How do existing events affect Interstates 5 and 90? .............................................................. 24 
3.3.  Why is the Holgate Street RR crossing a concern to the Port? ............................................... 25 
4. ANALYSIS THAT THE ARENA NEEDS TO PERFORM .......................................................................... 27 
4.1.  What did the other stadium EIS documents evaluate? .......................................................... 27 
4.2. What are the flaws of the arena's traffic study? ..................................................................... 29 
4.3.  What should be evaluated in an EIS for potential arena? ....................................................... 30 
Tables 
Table 1. Port of Seattle Container Terminals ........................................................................................ 8 
Table 2. Truck Trips per Day Generated by Port of Seattle .................................................................. 16 
Table 3. Peak Hour Truck Trips Generated by Port of Seattle at 3.5 Million TEUs/Year ...................... 22 
Table 4. Transportation and Parking Analyses in other EISs ............................................................... 28 
Table 5. Transportation Analysis Needs for New Arena EIS ................................................................. 32 
Figures 
Figure 1. Location of Port Container Terminals...................................................................................... 9 
Figure 2. Historic Container Volumes at the Port of Seattle ................................................................ 10 
Figure 3. Actual Throughput Compared to Forecasted Growth in 2015 .............................................. 11 
Figure 4. Actual Throughput Compared to Long-Term Forecast of 3.5 Million TEUs .......................... 12 
Figure 5. Throughput by Month (Five Year Average from 2007 through 2011) .................................. 13 
Figure 6. Land-side Origin and Destination of Port Cargo .................................................................... 15 
Figure 7. Expected Growth in Daily Truck Trips.................................................................................... 16 
Figure 8. Port Truck Trips on Major Intermodal and Freeway Connector Routes ............................. 18 
Figure 9. Effect of Mariners Games on Terminal 46 Gate Moves ........................................................ 19 
Figure 10. Trucks per Hour Entering Terminal 18  2005 ..................................................................... 20 
Figure 11. Effect of Night Gates on Hourly Traffic Volumes  Average Day........................................ 21 
Figure 12. Westbound Traffic on I-90 at Milepost 2.78 Without and With a Mariners Game ............ 24 

August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
1.  OVERVIEW 
The proposed new arena in the SoDo neighborhood will adversely affect operations of the Port of
Seattle's marine cargo terminals, some of which are located directly west of the site identified for the
new arena. Standard practice and the State Environmental Policy Act (SEPA) require the proponent of
any large new development with the potential to create significant adverse impacts to determine, disclose
, and as needed, mitigate those impacts. To date, insufficient analysis has been performed by the
arena proponent, the City of Seattle, or King County to determine the specific magnitude of impacts of
the new arena. 
The Port of Seattle has expressed concerns about the arena project based on current and past experience
operating terminals in proximity of Safeco Field and CenturyLink Field. As with any development
proposal, including the proposed SoDo arena, the burden of evaluating and mitigating project-related
impacts falls on the applicant and not on those, such as the Port, that would be impacted. The Port of
Seattle was not consulted regarding the arena, its location, or its potential impacts until negotiations
with the City and County were in advanced stages. Once the arena proposal was made public, the Port
provided the most recent analyses it has performed for terminals in the site vicinity in order to provide
context and background for its concerns. The Port has prepared these types of analysis when it sought
permits for a project or as part of long-range planning. The Port's most recent analyses were performed
in 2006 when it converted Terminal 30 from cruise operations back to container operations. The Port
also performed transportation analyses in that year to support its long-term growth forecasts. Since
then, Port data have been compiled to support WSDOT's efforts to plan and design the Alaskan Way
Viaduct (AWV) Replacement Project as well as the SR-519 project. The truck traffic estimates developed
for the Port's SEPA studies and other planning support efforts are still valid, and as detailed in this
report, the long-term growth targets for Port operations are achievable. The traffic operations docu-
mented in WSDOT's various studies for the AWV Replacement Project and SR-519 are also still valid and
reflect the conditions that will exist in the future when those projects and many others are completed.
The Port's concerns are not only based on these technical analyses, but knowledge of the Port's day-to-
day operations, and many decades of experience working to maintain traffic operations in the vicinity of
these terminals. 
The applicant proposing the arena has completed only a preliminary analysis. The Seattle Arena Multi-
modal Transportation Access and Parking Study1 is very simplistic compared to the EIS analyses that
were performed for the Kingdome, Safeco Field, CenturyLink Field, and Key Arena. The arena study admits
that it is not a comprehensive analysis and that, "An expanded transportation and parking impact
analysis would be required as part of a more detailed project review to comply with the State Environmental
Policy Act (SEPA)." The primary focus of the arena study was estimating the number of event
days, concurrent event days, and potential trips, and providing information on potential alternative
modes of transportation. The study provided no actual analysis of traffic operational impacts, safety
impacts, transit impacts, or freight impacts, nor did the study recommend any mitigation measures. The 
study also made several assumptions and drew flawed conclusions that are not adequate for the public
or decision makers to understand the potential impacts of the proposal. 
The Port trusts that the City, County and arena proponents will perform an EIS, as required by SEPA and
as outlined in the Memorandum of Understanding for the proposal,2 to document the impacts of the
1
Parametrix, Inc., May 23, 2012. 
2
Memorandum of Understanding Seattle Sports and Entertainment Facility, Pg 2. 
- 1 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
proposed arena. This EIS will help determine the type and extent of impacts and mitigation that will be
implemented if the arena is approved for the SoDo site. To assist in this effort, the Port commissioned
this study to provide the following: 
A detailed list of the Port of Seattle's concerns about the arena and how it will affect Port opera-
tions. This information is intended to provide additional context for developing potential mitigation
measures that would address these concerns. 
Updated Port statistics to reflect operations in the past five years, as well as future growth fore-
casts so that the arena EIS can account for existing and future Port traffic. 
A discussion of how Port operations will change over time due to growth and changing logistic
needs; and 
A list of the types of analyses that should be performed as part of the arena's EIS so that the im-
pacts and potential mitigation benefits can be adequately assessed. 
1.1. What are the Port's primary operational concerns about a new arena in SoDo? 
The Port of Seattle's primary concerns about a new arena in SoDo relate to how additional traffic and
changes in land use could affect Port operations. The primary transportation concerns, described further
below, are that: 
A.  Additional events at a new arena will make it harder to reach the Port, increase cargo shipping
costs, and affect the Port's ability to retain and attract customers; 
B.  New incompatible land uses will affect the Port's ability to operate; 
C.  The large number of new events reduce the Port's effective operating hours; 
D.  Port traffic will occur in the evenings and conflict with new arena event traffic; 
E.  Proposed street vacations will exacerbate congestion along the Port's main freeway access
route; 
F.  Additional pedestrian and vehicular activity at nearby railroad crossings increases the risk for
train-related collisions and rail and road system delays; 
G.  Concurrent events at two or more venues greatly exacerbate congestion to, from, and within
SoDo; 
H.  Alternative sites have not been considered; and 
I.   The proposed arena has not detailed its mitigation needs or identified funding for mitigation 
A. Additional events at a new arena will make it harder for trucks to reach the Port, increase
cargo shipping costs, and affect the Port's ability to retain and attract customers 
International shipping customers choose their gateway based on several economic factors, especially
those related to the cost, reliability and speed of shipping. The Port already faces severe competition
that could be exacerbated by widening the Panama Canal, which will allow ships direct access to East
and Gulf Coast ports, and expansion of facilities in British Columbia, Canada, which has rail connections
to Chicago and other Midwest cities. A new arena will add at least 70 to 100 weekday events per year to
SoDo, of which 6 to 22 could be concurrent with events at existing stadiums. Traffic generated by these
events slows freight movements and increases costs. If shipping costs increase and reliability declines,
shippers could choose to move elsewhere. Loss of these shipping customers would result in a loss of
Port-related jobs, as well as increase costs for local and statewide businesses required to truck longer
distances to reach another port. 
- 2 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
B. Incompatible land uses will affect the Port's ability to operate 
The new arena proponents have stated their desire to create an entertainment district around the new
arena. "Hansen said his vision for the area is to develop an entertainment center similar to L.A. Live, a
collection of restaurants, bars, clubs, hotels and other venues surrounding Staples Center in downtown
Los Angeles."3 Further gentrification of the industrial area will escalate land prices to levels that industrial
users cannot afford. The Port relies on support activities in the industrial area, including the rail
yards, warehouses, distribution centers, fulfillment processors, container and chassis maintenance,
inspection and other support services. Having these support services in close proximity to the Port terminals
reduces travel time and distance, highway congestion, wear-and-tear on roads, and emissions.
Their continued viability relies on the availability of competitively-priced industrial property. 
C. Events reduce the Port's effective operating hours 
While the Port acknowledges that the anticipated start times of events at the planned arena are likely to
be 7:00 or 7:30 P.M., several characteristics of the proposed location and anticipated types of events
contribute to concerns about event-related congestion developing much earlier. Due to the constraints
on parking capacity, its many dispersed locations and variation in price, event attendees are likely to arrive
much earlier to find convenient parking based on experience with current sports events. In addition,
the proponent's desire for other entertainment uses nearby, combined with the restaurants and bars
that were developed after Safeco Field and CenturyLink Field were completed, increase the likelihood
that event attendees will drive to the SoDo area earlier. In fact, one of the economic benefits touted by
proponents is this type of activity ("additional revenue for local restaurants, bars and clubs" 4)benefits
that were unfortunately lost near Key Arena after the Sonics were relocated. Finally, in order to remain
a financially viable building, the arena is expected to host a wide range of events in addition to professional
basketball and hockey, such as "other sporting events, family shows, concerts, graduations, and
civic and other events."5 Proponents have stated that it will be "the premier concert venue in the Pacific
Northwest." 6 Based on the experience at the other event venues in SoDo, the non-recurring events such
as concerts and special shows draw spectators to the vicinity much earlier and require traffic control and
access revisions during or prior to the afternoon peak period for traffic. As a result, the Port is concerned
that the proposed arena will further exacerbate the late afternoon congestion that already constrains
trucking efficiency in the SoDo area. 
Trucking firms that serve the Port terminals have stated that they closely monitor the event schedules in
SoDo. Often, dispatchers will not send trucks to Terminal 46 after 2:30 P.M. when there is an evening
Mariners game.7 Firms that truck products to the Port from Eastern Washington also report not sending
any trucks west for an afternoon run on a day with an evening Mariners game. Those firms may avoid
travel altogether when there is a day game or a large event such as a Monday Night Football game. This
means that they then will need to move more cargo before and after the time affected by the event,
increasing volumes during those times. Some firms, though, are unable to avoid delivering export containers
during the times of event-induced congestion because they are responsible for refrigerated
cargo that must be delivered within tight deadlines. Their trucks will be on the road longer, with a higher
level of unpredictability that makes it difficult to determine how many trucks need to be dedicated to
3
Seattle PI online, "Hansen paints clearer picture of Sodo arena plan," June 20, 2012 . 
4
http://www.sonicsarena.com/info/sonics-arena-economic 
5
Memorandum of Understanding Seattle Sports and Entertainment Facility, Pg 1. 
6
http://www.sonicsarena.com/info/summary-sonics-arena 
7
MacMillan Piper, July 2012. 
- 3 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
providing service. In all instances, there already is an existing economic impact on the trucking firms and
their customers, as the efficiency of their operations is reduced by the existing sports stadia. Most of the
truck drivers that haul Port cargo are independent owner-operators who are paid by the trip. If they are
not dispatched to pick up a load in the afternoon, they could lose 25% to 30% of their daily travel time,
and in effect up to 30% of their day's income. A significant increase in the number of event days, and the
number of dual events, would exacerbate this impact. 
Truckers are avoiding the area today because events do create congestion in the afternoons. Truck volumes
at the Terminal 46 gate are lower in the afternoon on days with night Mariners games, even with
the reduced attendance in recent years. In the future, a new arena would increase the number of days
affected by events, and will result in days with concurrent events with total attendance similar to a
Monday Night Football game. Further information about how events affect Port traffic is presented in
Section 2.9.
D. Port traffic will occur in the evenings and conflict with new arena event traffic 
The Port's strategic Century Agenda targets growth in its container operations in order to increase local
and regional jobs. Its goal is to increase container throughput from about 2.0 million TEUs8 in 2011 to
3.5 million TEUs. Achieving that cargo volume would increase daily truck trips from about 7,200 in 2010
to over 11,000 when throughput reaches 3.5 million TEUs (Table 2). Because the Port's land base and
access to suitable shipping berths are constrained, accommodating this growth will require both new
technologies for handling cargo and expanded operating hours. As detailed in the Port Operations section
below, it is estimated that about 20% of the Port's daily cargo would be moved between 6:00 P.M. 
and 11:00 P.M. with extended gate operations. Night-time terminal operations have the regional benefit
of spreading truck travel from peak periods to lesser demand times and utilizing the regional transportation
network at times when there is typically excess capacity. The peak arrival and departure times for
event traffic will conflict with Port truck movements between some terminals and the regional network
(especially Interstate 5 and Interstate 90). 
The need for night time operations has been noted in past studies. In fact, in the Port of Seattle's com-
ment letter on the original EIS for Safeco Field, the Port wrote, "While today terminal gate hours are not
regularly extended beyond the traditional 8:00 am to 5:00 pm period, projected increases in containers
at Terminal 25, 30, 37 and 46 will make it increasingly attractive for terminal operators to extend the
gate hours into the evening hours."9





8
TEU = twenty-foot equivalent unit. A 40-foot container is 2.0 TEUs. 
9
Letter from Port of Seattle (Keith Christian, General Manager of Container Line of Business) to Washington
State Major League Baseball Stadium Public Facilities District, June 28, 1996. Published in the Final EIS.
- 4 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
E. Street vacations will exacerbate congestion along the Port's main freeway access routes 
A new arena requires the vacation of Occidental Avenue S to provide a site wide enough to accommodate
the footprint of the arena. Plans may also include vacation of S Massachusetts Street. Both of these
streets now carry some local traffic that, if vacated, would be diverted through the 1st Avenue S/S Atlantic
Street/ Edgar Martinez Drive intersection. This intersection is the area's primary bottleneck, and is along
the primary travel route between Terminals 25, 30 and 46 and Interstates 5 and 90. 
The last comprehensive analysis for traffic operations in the SoDo area was performed as part of the
Alaskan Way Viaduct Replacement Project Supplemental EIS.10 That analysis accounted for all of the
new infrastructure investments that have or are being made in the area including: the new I-90 ramps to
SR-519, the grade-separated roadway at Royal Brougham Way, the Holgate-to-King Street project with
"Little h" that separates Atlantic Street traffic from the railroad tail track, and improvements to Spokane
Street. It also included the new SR-99 Bored Tunnel and new ramps in the SoDo area. Even with all of
those projects, the analysis showed that the intersection at 1st Avenue S/S Atlantic Street will continue
to experience extreme congestion on a non-event day. The arena's proposed street vacation(s) will
exacerbate this condition even on days when no events are scheduled. 
F. Additional pedestrian and vehicular activity at nearby railroad crossings increases the risk for
train-related collisions as well as rail and road system delays 
The new arena site fronts on S Holgate Street, a roadway that is crossed by 17 railroad tracks between
1st and 4th Avenues and supports active train operations by BNSF, Amtrak and Sound Transit. The proposed
arena will substantially increase the number of pedestrians and vehicles that cross these tracks to
reach parking areas and transit east of the tracks. The proposed relocation of Occidental Avenue S adjacent
to the tracks will also increase vehicular conflicts at or near the tracks especially after events when
event attendees exit the Safeco Field Garage and/or new parking facilities created for the arena. Train
operations on these tracks include 80 to 100 mainline crossings per day, plus switching in the passenger
train maintenance yards that serve Amtrak and Sounder. The number of tracks plus a slight bend in the
track alignment makes it difficult for a pedestrian to discern which tracks may be in use by an approaching
train. Past experience with the tracks that crossed Royal Brougham Way on the north side of
Safeco Field, which were many fewer in number, found that pedestrians often ignored gates when they
were down and collisions did occur.11 It was one of the reasons why Royal Brougham Way is now grade
separated from the tracks for both pedestrian and vehicular movements. In addition to the potentially
tragic individual results of a train collision with a car or pedestrian, collisions also have substantial impacts
to the rail system and cause extensive delay to passenger and freight rail. 
Amtrak, WSDOT and SDOT have previously evaluated whether S Holgate Street should be closed at the
railroad tracks. Increased pedestrian and vehicular crossing associated with the proposed arena will increase
pressure to close S Holgate Street, even temporarily before and after events. This would increase
congestion at other crossings and intersections throughout the SoDo area. Therefore, it is imperative
that the safety issues at the railroad crossings be addressed (see also Section 4.3). 

10
SR 99 Alaskan Way Viaduct Replacement Project Final EIS, Transportation Discipline Report; WSDOT, FHWA,
SDOT, Parsons Brinckerhoff; July 2011. Table 5-27. 
11
"Train accident was fourth near ballpark since 2000," Seattle Times article, October 2, 2007. 
- 5 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
G. Concurrent events greatly exacerbate congestion to, from, and within SoDo 
The Seattle City Council imposed substantial restrictions related to "concurrent time-specific events" on
both Safeco Field and CenturyLink Field.12 These dictate that events at the two stadiums with a cumulative
weekday attendance of 58,500 must be separated by a four-hour period (time between the end of
the first event and start of the second). With the cooperation of the Seattle Police Department, the
teams operating Safeco Field and CenturyLink Field have experimented with limited overlapping events,
and with separation of less than four hours. All parties have concluded that overlapping events are
highly problematic, due to traffic and parking issues, and that a minimum three-hour separation is what
is practical for major events. A critical question to be answered is whether it would be possible to maintain
these restrictions with a third venue in the area, and what the impacts, and related mitigation,
would be if the restrictions were lifted. 
There are three key issues that affect Port access during major or concurrent events. The first is extreme
congestion before an event that can create very long backups on Interstate 5 and Interstate 90 approaching
the SoDo area. This affects not only access to the Port of Seattle, but through freight access
on those key regional routes. Another issue is local congestion, which is compounded by an inadequate
supply of parking and the dispersed locations of that parking, causing attendees to circle the street system
to find an available space at a price they are willing to pay. Finally, at the end of the event, traffic
management plans that go into effect can completely close some major arterials as traffic is flushed
from event parking garages. With increased use of night gates at the Port, post-game traffic control
plans could restrict or prohibit truck access to and from the Port terminals. 
H. Alternative sites have not been considered 
All of the other major sports venues in SeattleSafeco Field, the original Kingdome (which was replaced
by CenturyLink Field), and even Key Arenawere subject to an alternative site analysis. Such an analysis
allows a comparison for event-related impacts and mitigation needs, which will differ by location. The
proposed arena in SoDo is likely to require additional parking, pedestrian improvements (including track
crossing upgrades, sidewalk upgrades, and pedestrian illumination upgrades), public benefit improvements
associated with street vacations, additional police-officer control during concurrent events, street
system improvements, and traffic management improvements. The magnitude of mitigation needs and
their associated costs (at either proponent or public expense) may be less at an alternative site. The alternative
site analysis should be completed to determine how the site location affects the magnitude
and cost of mitigation. 





12
Property Use and Development Agreement for the Ballpark, June 29, 1999. 
- 6 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
I. Arena has not detailed its mitigation needs or identified funding for mitigation 
A key part of the environmental review process is defining the required mitigation for new impacts. This
was a part of the documentation and permitting processes for all Port of Seattle terminals, as well as for
Safeco Field, CenturyLink Field, and Key Arena. As described above, the proposed arena in SoDo is likely
to require, at a minimum, the following to mitigate its transportation impacts: 
Additional parking to meet the demand associated with concurrent events; 
Pedestrian improvements including track crossing safety upgrades, sidewalk upgrades, and
pedestrian illumination upgrades along walking routes to transit and parking areas; 
Public benefit improvements associated with street vacations; 
Police-officer traffic control during arena events, plus additional police officers during concur-
rent events; 
Street system improvements to maintain traffic operations along major access corridors and
intersections, and at the access points to new parking facilities; 
Traffic management improvements, including elements such as variable message signs, parking
guidance systems, and other technology, to direct attendees to appropriate access routes and to
maintain through-vehicle access in SoDo (including Port trucks) before and after events; and 
Ongoing trip reduction measures (as part of a Transportation Management Plan) to reduce vehi-
cle trips and parking demand. 
The detailed analysis typically performed as part of the arena's EIS would determine these mitigation
needs. However, unless an appropriate level of funding is allocated for mitigation, it is possible that the
mitigation costs could be shifted to the public, or worse, deferred or abandoned. Therefore, an acceptable
mitigation plan with funding must be developed for the arena. 
1.2. What are the flaws of the arena's traffic study? 
As outlined on page one of the Seattle Arena Multimodal Transportation Access and Parking Study,13 
that analysis was not a comprehensive technical analysis and it states that: 
"An expanded transportation and parking impact analysis would be required as part of a more
detailed project review to comply with the State Environmental Policy Act (SEPA). This phase of work
will assess the degree to which the existing and planned transportation and parking infrastructure in
the area would accommodate the new sports arena." 
The study was very simplistic compared to the EIS analyses that were performed for the Kingdome,
Safeco Field, CenturyLink Field, and Key Arena. Its primary focus was estimating the number of event
days, concurrent event days, and potential trips, and providing information on potential alternative
modes of transportation. The study provided no actual analysis of traffic operational impacts, safety
impacts, transit impacts, or freight impacts, nor did the study recommend any mitigation measures. The
study also made several assumptions and drew conclusions that are flawed. These are outlined in
Section 4. 
An EIS must be performed for the new arena. Detailed analyses that should be included in this EIS are
described in Section 4. 
13
Parametrix, Inc., May 23, 2012. 
- 7 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
2.  PORT TERMINAL OPERATIONS 
2.1. Where are the Port's container terminals? 
The Port of Seattle has four major container terminals located just south of downtown Seattle. These are
described in Table 1 and their locations are shown on Figure 1. The Port is also served by two major rail
intermodal yards: the BNSF Railway's Seattle International Gateway (SIG Yard) and the Union Pacific's
Argo Yard. The intermodal yards are where containers are loaded onto or unloaded from a train. SIG is
divided into two facilities, the North SIG Yard, which is accessed off S Massachusetts Street and Colorado
Avenue, and Main SIG, which is accessed from S. Hanford Street east of East Marginal Way. 

Table 1. Port of Seattle Container Terminals 
Location /                   # of Ship Berths
Terminal    major access route?   Acreage    (Apron Length)         On-Dock Rail 
T-5        West Seattle          172       3 (2,900 feet)       Yes (Capacity for 54 five-
Spokane Street                                platform railcars) 
T-18       Harbor Island         196       4 (4,440 feet)       Yes (Capacity for 54 five-
Spokane Street                                platform railcars) 
T-25/T-30   East Harbor          70       2 (2,700 feet)             No a 
East Marginal Way 
T-46       East Harbor          88       2 (2,300 feet)             No a 
Alaskan Way at
Atlantic Street 
a.    Terminal size prohibits the use of on-dock rail. Operations are efficient due to availability of near-dock rail facilities. 

All of these marine terminals offer access to berths for deep-draft vessels. The Port also serves container
movements for shallow-draft vessels at T-115 up the Duwamish River. T-25 and T-30 are currently operated
as a single terminal with a combined gate, but could support separate terminal operations if market
conditions change. 






- 8 -                                  August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Figure 1. Location of Port Container Terminals 














Source: Port of Seattle. 






- 9 -                                  August 7, 2012


Impact of a SoDo Arena on 
Port of Seattle Operations 
2.2. What is the Port's historic and current annual container throughput? 
Cargo volume through the Port's container terminals is measured in TEUs ("twenty-foot equivalent units")
with a 40-foot container being equivalent to two TEUs. Container throughput at the Port has grown steadily
over the years as shown in Figure 2. The Port had record throughput year in 2010, when 2.14 million
TEUs were handled. The recessions of 2001 and 2008/2009 show clearly on the chart, along with
recoveries. 

Figure 2. Historic Container Volumes at the Port of Seattle 








Source: Volumes prior to 2002 provided by Port of Seattle in June 2003. Data after 2002 obtained from the Port of Seattle's website
http://www.portseattle.org/About/Publications/Statistics/Seaport/Pages/10-Year-History.aspx, accessed July 23, 2012.







- 10 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
2.3. How does the current throughput compare to past forecasts? 
In 2003, the Port of Seattle completed the Container Terminal Access Study, 2003 Update14 which fore-
cast throughput to the year 2015. It was expected that the Port of Seattle's container volume would in-
crease to about 2.24 million TEUs by the year 2015. 
Figure 3 summarizes the actual throughput and the 2015 forecast. In the past decade, throughput at the
Port peaked in 2010 at about 2.14 million TEUs. This shows that the growth forecasts from 2003 were
reasonable and still achievable. 

Figure 3. Actual Throughput Compared to Forecasted Growth in 2015 








Source: Actual throughput values provided by the Port of Seattle. Forecast 2015 growth from the Container Terminal Access
Study 2003 Update, Heffron Transportation, Inc., October 27, 2003. 

The Port's Century Agenda targets growth in its container operations in order to increase local and regional
jobs. Its goal is to increase container throughput from about 2.0 million TEUs15 in 2011 to 3.5 million TEUs.
Figure 4 shows this long-term growth forecast. If growth were to continue at the same rate as the past
decadeat 3.5% per yearthen the Port could reach its 3.5 million TEU goal in about 22 years. If growth
were to slow to a rate of 2% per year, the goal would be reached in about the year 2050. Therefore, this
goal is achievable given the historic growth at the Port. 


14
Heffron Transportation, Inc., October 27, 2003. 
15
TEU = twenty-foot equivalent unit. A 40-foot container is 2.0 TEUs. 
- 11 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Figure 4. Actual Throughput Compared to Long-Term Forecast of 3.5 Million TEUs 








Source: Actual throughput values for 2002 through 2011 provided by the Port of Seattle. 











- 12 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
2.4. How does the throughput fluctuate by month? 
Monthly port throughput varies according to consumer demand for imports, retailer buying activity, particularly
in advance of the holiday season, and the seasonality of agricultural exports. Throughput volumes
for the past five years (2007 through 2011) were compiled to show the seasonal fluctuations, which
are illustrated in Figure 5. The peak for the year typically occurs in August when import volumes are
about 12% higher than the average month's imports, and exports are 13% higher than the average
month's exports. 

Figure 5. Throughput by Month (Five Year Average from 2007 through 2011) 








Source: Port of Seattle. 

2.5. How much of the cargo is imported versus exported? 
Figure 5 showed the split between imports and exports. On an annual basis, the percentage of imports
average 54%, and was relatively consistent over the last five years. The import volume ranged from a
low of 52.4% in 2007 to a high of 54.8% in 2009. 




- 13 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
2.6. What are the origins and destinations of Port cargo and how does it get there? 
Due to our population and employment size relative to the size of the USA, there is a limited market for
goods that are consumed or produced in the Pacific Northwest. Therefore, the majority of import cargo
handled at Port of Seattle terminals is discretionary cargo  cargo destined for inland markets. Approximately
60% to 70% of the import cargo that crosses port terminals is headed via rail to markets in
the U.S. Midwest. As container volumes through the Port of Seattle increase, more of it (both in terms
of volume and as a percentage of total) would be transported to larger inland markets in other parts of
the country via intermodal rail. While local consumption will increase, it will comprise a smaller portion
of the overall growth in demand throughout the entire country. 
One logistics trend that is increasing rapidly is "cross-docking," in which cargo is repackaged from
marine containers, which are typically 40-feet long, to a domestic container, which are typically 53-feet
long. The contents of 1.5 marine containers can be repackaged into one domestic container, making it
more efficient to transport by truck or rail. Repackaging usually occurs close to the marine ports, and
then the larger containers are either trucked back to a railyard for inland transport to the US Midwest or
beyond, or are trucked to a destination in the Pacific Northwest. Large distribution centers that perform
cross-dock operations are located in the Duwamish, and are expanding in areas south of Seattle. It is
expected that a much higher percentage of truck trips will be made to areas south of Seattle in the 
future as cross-docking and local distribution increases. 
Detailed analysis related to the distribution pattern for containers was performed as part of the Port's
Container Sustainable Growth Plan Transportation Analysis.16 Figure 6 presents the origin and destina-
tion percentages for the following major destinations: 
Handled by On-Dock Rail Yard 
Drayed to/from Near-Dock Rail Yard 
Trucked to/from Regional Distribution/Warehouse Facilities 
Trucked to/from Regional Businesses/Manufacturing 
Trucked Beyond Puget Sound Region







16
Heffron Transportation, Inc., Draft Memorandum, May 17, 2006. 
- 14 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Figure 6. Land-side Origin and Destination of Port Cargo 








Source: Source: Heffron Transportation, Inc. using data from Port of Seattle, May 2006.
2.7. How many trucks trips per day would Port growth generate? 
Containers that do not arrive or depart from the terminal directly via on-dock rail are moved by truck. Truck
volumes include two primary components: containers that are trucked to and from businesses in the Pacific
Northwest (local and regional truck movements), and those trucked to and from near-dock rail yards. 
The containers moved by truck were converted to truck trips assuming that each container being trucked
to or from an off-dock intermodal yard generates two truck trips (one entering and one leaving the terminal
). This rate was used because when a terminal is working a ship, the focus is to get the cargo out of the
terminal and to the rail yard. The trucks leave the terminal with a container and return "light" with either
an empty chassis or a bobtail (truck tractor only). Few if any trucks would make a "double turn" and return
to the terminal with a container. Containers that are being trucked to or from local or regional businesses
were assumed to generate 2.2 truck trips each. This factor includes gate moves that require no transaction
or the repositioning of containers (e.g., an empty container at a terminal being sent out for a customer to
load with cargo). The average weekday traffic volumes are summarized in Table 2.




- 15 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Table 2. Truck Trips per Day Generated by Port of Seattle 
One-Way Truck Trips per Day a 
Year 2010       Forecast with 
2.1 million        3.5 million        Net Change 
Trip Origin/Destination                        TEU/Year        TEUs / Year        from 2010 
To/from Near-Dock Rail Yards                  3,270           6,510           3,240 
To/ from Local or Regional Businesses             3,960           4,930            970 
Total                                      7,230            11,440            4,210 
Source: Heffron Transportation, Inc., Volumes for 2010 are based on current TEU throughput and intermodal information;
forecasts for 3.5 million TEU condition were presented in Container Sustainable Growth Plan Transportation Analysis, Heffron
Transportation, Inc., Draft Memorandum, May 17, 2006.
a.  A trip entering the terminal is one trip; a trip leaving the terminal is another trip. 
2.8. Where are the trucks going? 
Truck travel patterns will change over time and as Port volumes increase. For example, the industrial base
and distribution functions in areas such as Kent, Sumner and Lacey are growing faster than those within
Seattle. Therefore, as Port volumes increase, substantial growth in truck trips is likely along I-5 south of
Seattle to reach these distribution centers. The increase in intermodal cargo will also substantially increase
the number of dray trips between the marine terminals and the nearby rail terminals at SIG and Argo.
Figure 7 shows the expected growth in truck trips to various destinations and along major corridors.
Containers that are handled directly by on-dock rail yards at Terminal 5 and 18 would not generate truck
trips and are excluded from the chart. 
Figure 7. Expected Growth in Daily Truck Trips 








Source: Source: Heffron Transportation, Inc. using data from Port of Seattle, May 2006.

- 16 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
The future truck trips for the 3.5 million TEU condition are shown on Figure 8. This reflects the preferred
travel routes along arterials that link to the regional highway system, and also reflects the average-day
conditions. As shown, it is expected that an average of 680 trucks per day would use SR-519 (S Atlantic
Street and Edgar Martinez Drive). 
2.9. When do trucks travel and how do stadium events affect truck activity? 
Terminal gates are currently open from 8:00 A.M. to 5:00 P.M., and can open for early morning, night, 
and weekend shifts when needed to "turn the ship" (unloading and reloading the ship in a certain
amount of time so it can maintain its schedule). When a ship arrives in port, the import cargo is offloaded
, and the intermodal cargo (which is typically the highest value cargo), is the first priority to be
trucked out of the terminal to the rail yards. Export loads bound for a ship must arrive before the vessel
cut-off (the deadline when containers must be at the terminal in order to be loaded on the ship). For the
agricultural and other exporters trying to deliver a large number of export containers by the vessel cutoff
, congestion delays mean the difference between one or two turns per day, and they face the real
possibility of missed sales if they cannot deliver their containers to the terminal on time. Those shipping
products that require refrigeration (containers called "reefers") are typically loaded as late as possible to
improve the product's freshness when it arrives overseas or in Alaska or Hawaii. If delays cause those
shippers to miss the terminal cut off, the products could be wasted. 
To assess if and how events in SoDo affect truck activity at the port, gate movement data were obtained for
T-46 for three weeks in June 2012 when there were days with and without events at Safeco Field. The 
Seattle Mariners had three midweek night games (vs. San Diego with first pitch just after 7:00 P.M.) at
Safeco Field on Tuesday, June 12 through Thursday, June 14 that had an average attendance of about
14,800 people. These were compared to the following Tuesday through Thursday (June 19 through 21)
when there were no Mariners games (road games at Arizona and travel day). Additionally, data were
collected for Wednesday, June 27 when the Mariners had a day game that started at 12:40 P.M. (attendance
was 18,158). During each of these three-day periods, T-46 had three ship calls for which outbound
cargo had to arrive by a cut-off day within that period. During the first week (coinciding with the night M's
games), the number of containers expected on those ships was 2,145; during the second week (with no M's
games) the expected container volume was 2,280, and during the third week (with the day M's game) the
expected container volume was 2,925.
The average number of gate moves by hour is charted on Figure 9. The chart shows that on days with a
Mariners night game, the total number of gate moves was 9% lower than the following week even
though the number of containers loaded onto the ship was 6% lower. More trucks arrived at the gate
earlier in the morning, but about 20% fewer arrived after 3:00 P.M. on the days with a Mariners game
compared to the days with no M's games. The decrease in volume associated with an M's day game were
even more severe, particularly given that the ship load was about 28% higher compared to the week
without an M's game. 




- 17 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 


Figure 8. Port Truck Trips on Major Intermodal and Freeway Connector Routes 



















- 18 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
These data confirm the anecdotal information provided by trucking firms that serve the Port terminals.
They have stated that they closely monitor the event schedules in SoDo. Often, dispatchers will not send
trucks to Terminal 46 after 2:30 P.M. when there is an evening Mariners game.17 

Figure 9. Effect of Mariners Games on Terminal 46 Gate Moves 








Source: Gate move data provided by Total Terminals, Inc., Compiled by Heffron Transportation, Inc. 
2.10. How would extended gate hours affect hourly truck volumes? 
The typical truck gate at the Port of Seattle operates from 8:00 A.M. through 5:00 P.M. on weekdays. The
larger terminals also operate occasional early morning, night or weekend gates when needed. As 
throughput at the Port of Seattle grows, night gates will be required to accommodate that growth. Night
or weekend gates could also be requested by large shipping customers such as big box retailers with
24/7 warehouse operations since overall travel times between the port and their facilities would be less
at these times. Detailed analysis about the effect of night gates was performed as part of the Port's Con-
tainer Sustainable Growth Plan Transportation Analysis. It first collected actual volumes for an existing
daytime gate operation, and then determined how traffic might shift if night gates are available. 
Daytime operating conditions were derived from data collected in 2005 at Terminal 18 as part of a Cityrequested
study of the Terminal 18 South Gate. The results were presented in a memorandum entitled:
Terminal 18 South Gate, Monitoring of Truck Volumes and Queues.18 As part of this study, SSA provided
Turn Time Summary Reports for each day between Monday, October 10 and Friday, October 28, 2005.
The data were compiled to determine the total entering volumes by hour of the day, which are shown
on Figure 10. The hourly summary is provided for the average of the three-week period as well as for the
17
MacMillan Piper, July 2012. 
18
Draft Memorandum, Heffron Transportation, Inc., December 14, 2005. 
- 19 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
peak day. This shows that terminal truck traffic peaks in the morning between 8:00 and 9:00 A.M. and
again in the afternoon between 1:00 and 2:00 P.M. The amount of time a truck spends inside the terminal
ranges from 10 to 20 minutes. Therefore, trucks generally exit the terminal in the same hour that
they enter it. The graph below shows that the temporal distribution of truck trips through the gate is
similar on an average day and a peak day. 

Figure 10. Trucks per Hour Entering Terminal 18  2005 
16%
14.1%               Average Day
14%       13.1%                    13.6%       Peak Day
13.1%                      13.0%
12.7%                                  12.4%
12.2%
12%         11.6%
11.2%
10.1%
Percent Inbound Trips                          10.0%
10%                                     9.3%
8.9%
8.7%                                                       8.8%
8%

6%
5.1%
4.8%
3.9%
4%
3.0%
2%
0.0% 0.0%
0%
7:00 AM      8:00 AM      9:00 AM      10:00 AM      11:00 AM      12:00 PM      1:00 PM      2:00 PM      3:00 PM      4:00 PM      5:00 PM
Source:  Terminal 18 Turn Time Summary Report, provided by SSA. Average of three-week period from October 10
through 28, 2005. The peak volumes are from October 26, 2005. 

If nighttime gates are operated, they would primarily serve intermodal dray trips being made between
the container terminal and the near-dock intermodal terminals at SIG and Argo. Some local and regional
traffic could also use the gate at night. The percentage of traffic that could occur during each hour of the
day was derived assuming the following: 
50% of the intermodal traffic would be moved during the night shift, and 50% would be
moved during the day shift. 
10% of local and regional traffic would be moved during the night shift, and 90% would
be moved during the day shift. 
The night shift at the Port's terminals occurs from 6:00 P.M. to 3:00 A.M. It is assumed that
the gates would be closed during the hoot shift from 3:00 A.M. to 8:00 A.M. 
Figure 11 shows how the percentage of port-generated trucks that pass through the terminal gates each
hour would change with night-shift gate operations. There are three critical time periods of interest for
- 20 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
traffic operations. During the morning commuter peak hour (8:00 to 9:00 A.M.) port truck volumes could
decrease from 13% to 8% of the total daily gate volume if night gates are implemented. During the midday
terminal peak hour (1:00 to 2:00 P.M.), truck volumes could decrease from 14% to 9% of the daily port
traffic, and during the afternoon commuter peak hour (4:00 to 5:00 P.M.), truck volumes could decrease
from about 5% to less than 3% of the daily port traffic. It is also noted that about 4% of the trips could
occur during the hour when event attendees are leaving the arena at about 10:00 P.M. Night-time terminal
operations have the regional benefit of spreading truck travel from peak periods to lesser demand times
and utilizing the regional transportation network at times when there is typically excess capacity. 

Figure 11. Effect of Night Gates on Hourly Traffic Volumes  Average Day 
20%
Day Gate Only
18%                                   With Night Shift Gates

16%   Morning Commuter Peak Hour Trips
Reduced from 13% to 8% of Daily Traffic
Terminal Peak Hour Trips
Reduced from 14% to 9% of Daily Traffic
Percent of Daily Truck Trips  14%
12%
Afternoon Commuter Peak Hour Trips
10%                                Reduced from 5% to less than 3% of Daily Traffic

8%

6%

4%

2%

0%
12:00 AM  1:00 AM  2:00 AM  3:00 AM  4:00 AM  5:00 AM  6:00 AM  7:00 AM  8:00 AM  9:00 AM  10:00 AM  11:00 AM  12:00 PM  1:00 PM  2:00 PM  3:00 PM  4:00 PM  5:00 PM  6:00 PM  7:00 PM  8:00 PM  9:00 PM  10:00 PM  11:00 PM
Source: Heffron Transportation, Inc., May 2006. Daytime gate values from Terminal 18 data (See Figure 10.) Percentages
with nighttime gate assume that 50% of intermodal traffic would move during the night shift and 10% of
other traffic would move during the night shift. The night shift is from 6:00 P.M. to 3:00 A.M. 
The above information was used to derive hourly truck volumes for the Port of Seattle's container ter-
minals. These are presented in Table 3 for several conditions. As with prior analyses both by the Port
and other entities, it is recommended that the arena EIS utilize the "peak season" volumes listed be-
low to evaluate traffic mitigation needs. 



- 21 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Table 3. Peak Hour Truck Trips Generated by Port of Seattle at 3.5 Million TEUs/Year 
Average Day         Day in the Peak Season (August)a 
Trip Origin/Destination                     Day Gates Only   With Night Gates  Day Gates Only   With Night Gates 
Commuter AM Peak Hour (7  8 AM) 
To/from Near-Dock Rail Yards                850          420          950          470 
To/ from Local or Regional Businesses          650           580           730           650 
Total                                1,500          1,000          1,680          1,120 
Midday Terminal Peak Hour (1  2 PM) 
To/from Near-Dock Rail Yards                920          460          1,030          520 
To/ from Local or Regional Businesses          700           610           780           680 
Total                                1,620          1,070          1,810          1,200 
Commuter PM Peak Hour (4  5 PM) 
To/from Near-Dock Rail Yards                330          160          370          180 
To/ from Local or Regional Businesses          250           130           280           150 
Total                                 580           290           650           320 
Evening Peak Hour (7  8 PM and 10-11 PM) 
To/from Near-Dock Rail Yards                0           540           0           600 
To/ from Local or Regional Businesses           0           200           0           220 
Total                                  0            740            0            820 
Total Daily Traffic (24 hours) 
To/from Near-Dock Rail Yards               6,510         6,510         7,300         7,300 
To/ from Local or Regional Businesses          4,930         4,930         5,500         5,500 
Total                                11,440         11,440         12,800         12,800 
Source: Heffron Transportation, Inc., May 2006.
a.    Assumes that peak season volume is 12% higher than average. 







- 22 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
3.  TRANSPORTATION ISSUES 
3.1. Where are the local bottlenecks? 
The last comprehensive analysis for traffic operations in the SoDo area was performed as part of the
Alaskan Way Viaduct Replacement Project Supplemental EIS.19 That analysis accounted for all of the new
infrastructure investments that have or are being made in the area: the new I-90 ramps to SR-519, the
grade-separated roadway at Royal Brougham Way, the Holgate-to-King Street project with "Little h" that
separates Atlantic Street traffic from the railroad tail track, and improvements to Spokane Street. It also
included the new SR-99 Bored Tunnel and new ramps in the SoDo area. Even with all of those projects, the
analysis showed that the intersection at 1st Avenue S/S Atlantic Street would continue to experience severe
congestion on non-event days reflected by the level of service (LOS) F rating.20 Several intersections along
the Fourth Avenue S corridor would also operate at LOS F conditions including those at S Holgate Street
and S Royal Brougham Way. The analysis did not account for the diversion impact of tolling on SR-520,
which is evident today. Nor did the analysis account for the effects of tolling SR-99, which is expected to
add traffic to arterials through SoDo as well as to the streets around the South Portal of the Bored Tunnel. 
Although no specific event analysis was prepared for the bored tunnel portion of the SR-99 Replacement
Program, the report did state that, "sporting and other major events at Safeco Field and Qwest Field
would likely continue to draw large crowds and result in high concentrations of traffic movements into
and out of the stadium area before and after events. Regardless of the regional connections in place,
vehicular and pedestrian-related congestion associated with such events would be managed in a manner
similar to current practices in terms of detours, traffic control, and turning movement restrictions."21
Thus, even though the new stadium district overlay was in place, none of the agencies involved contemplated
traffic associated with a third sports venue. 
Of particular concern to the Port of Seattle are the event impacts to Terminals 25/30 and 46, which are
located along East Marginal Way (EMW). For these terminals, the most direct route for truck traffic to
and from the north on Interstate 5 (I-5) or the east on Interstate 90 is to use SR-519 (Edgar Martinez
Drive and S Atlantic Street). A new overpass of the SIG Yard tail track is being constructed on that route
as part of the AWV Replacement Program. There are no other direct routes to East Marginal Way that
avoid crossing the railroad tracks. Exiting I-5 to Forest Street, which only serves southbound traffic, 
requires crossing both the BNSF Mainline tracks and SIG Yard tracks, and trucks that use the Spokane
Street Viaduct would have to U-turn on Harbor Island to access East Marginal Way. The additional
event-related congestion along SR-519 would add delay to truck movements by clogging the primary
access route or causing trucks to divert to much less direct routes. 


19
SR 99 Alaskan Way Viaduct Replacement Project Final EIS, Transportation Discipline Report; WSDOT, FHWA,
SDOT, Parsons Brinckerhoff; July 2011. Table 5-27. 
20
Level of service is a qualitative measure used to characterize traffic operating conditions. Six letter designations,
"A" through "F," are used to define level of service. LOS A is the best and represents good traffic operations with
little or no delay to motorists. LOS F is the worst and indicates poor traffic operations with long delays. 
21
Page 5-144 
- 23 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
3.2. How do existing events affect Interstates 5 and 90? 
The King County Council's Expert Review Panel report on Transportation Issues recommended that the
SEPA analysis for a new arena include analysis to determine how a new arena would affect the regional 
transportation corridors, especially Interstates 5 and 90. The experts' high-level analysis22 showed that an
evening event does increase travel times during the evening commute times between 3:00 and 7:00 P.M. 
Some additional data were collected at a permanent traffic counter on I-90 at milepost 2.78, which is
just west of the split to I-5 and includes traffic destined to both S Atlantic Street and 4th Avenue S. Figure
12 shows the westbound I-90 traffic entering the SoDo area for a Friday in June without a Mariners
game and a Friday with a Mariners game. Friday was chosen because the attendance at Safeco Field was
21,000, which would generate similar trips as the arena estimated for its events. The chart shows that
event traffic coming into the SoDo area starts to build in the early afternoon with increases of 20% to
30% before 5:00 P.M.

Figure 12. Westbound Traffic on I-90 at Milepost 2.78 Without and With a Mariners Game 








Source: Data obtained from WSDOT Traffic Count Database. Attendance at the June 8, 2012 Mariners Game was 21,255. 





22
Charlie Howard and Doug MacDonald, Undated. Released 7/11, presented to County Council 7/12. 
- 24 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
3.3. Why is the Holgate Street RR crossing a concern to the Port? 
The new arena site fronts on S Holgate Street, a roadway that is crossed by 17 railroad tracks between
1st and 4th Avenues. It is one of only six east-west streets that connect 1st and 4th Avenues in the SoDo
neighborhood (the others are Royal Brougham Way, Edgar Martinez Drive, S Lander Street, S Horton
Street, and S Spokane Street). In 2003, it was recommended for closure by the WSDOT Rail Office to
eliminate railroad conflicts.23 A 2010 study24 prepared for Seattle Department of Transportation (SDOT)
determined that a closure would have detrimental traffic operations effects on other streets in SoDo
and recommended keeping the street open to vehicular and pedestrian movements. The report's conclusions
stated, 
Unlike many commercial areas of the City, the SoDo area does not have a traditional street
grid network. In particular, the number of east-west arterials in this area is limited. A recent
decision to construct a grade-separated structure over the railroad tracks on Royal
Brougham Way S will further constrain the east-west traffic movements. In 2008, S Holgate
Street carried about 12,000 vehicles per day. The closure of S Holgate Street would
not shift this amount of traffic to just one street such as S Atlantic Street, but the impact of
the street closure would be felt throughout the area. 
Train operations on these tracks include a mix of switching maneuvers to, within, and from the Amtrak
yards as well as higher-speed passenger and freight trains on the BNSF Railway's mainline tracks. It is
expected that the new arena would substantially increase pedestrian and vehicular traffic across these
tracks, and most of those movements would occur in the evening before the event or at night after the
eventtimes that for most of the basketball season are after sunset. The crossings are now controlled
by several gate systems, and many vehicles and pedestrians often get trapped between gates on the
tracks. There is also a slight angle to the road crossing where the mainline tracks cross S Holgate Street
and it is difficult for a pedestrian to discern which tracks may be in use by an approaching train. SDOT's
2010 Holgate Street study recommended many safety improvements in this section. These include: 
Consolidate crossing gates to prevent vehicles from queuing up at one gate and extending back
into the next gate. 
Install quad-gates to prevent a vehicle from going around the gate. 
Complete gaps in the sidewalk system. 
Add crossing gates for pedestrians to each quad-gate to prevent pedestrians from crossing the
tracks when a train is approaching. 
Provide raised medians with a pedestrian refuge. The raised medians would provide a space for
them to wait for adequate breaks between vehicles on S Holgate Street, and additionally, create 
conditions where they only need to cross half of the street at a time. 
Add U-turn routes so that vehicles waiting for a train could choose an alternative route. 
Provide electronic message signs for drivers on area arterials to show when the train gates are
down and provide an indication of how long the gates may be closed. 

23
WSDOT, S Holgate Street Railway Crossing Closure Traffic Study, 2003. 
24
Fehr & Peers for SDOT, South Holgate Street Railroad Crossing Study, Phase II, Final Report; January 2010. 
- 25 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 








Source: Amtrak 

The proposed arena may also need additional safety enhancements to deal with the surge of both
pedestrian and vehicular traffic following an event. The proposed arena's EIS should include evaluating
the size of the areas needed for pedestrians to wait for a passing train. It should also evaluate how train
blockages would affect ingress and egress for events. Of particular concern would be the proposed road
on the east side of the arena that is intended to replace the function of Occidental Avenue S in providing
access to and from the Safeco garage. The new road would intersect S Holgate Street adjacent to 
Amtrak's Coach Yard with its multiple service tracks and the BNSF mainline through SoDo (see photo
above), and the surge of traffic egressing the Safeco Field garage would be impacted by train crossings. 
Even with all of these additional safety features, past experience with the tracks that crossed Royal
Brougham Way on the north side of Safeco Field, which were many fewer in number, found that pedestrians
often ignored gates when they were down and collisions did occur.25 It was one of the reasons
why Royal Brougham Way is now grade-separated from the tracks for both pedestrian and vehicular
movements. However, past studies have indicated that it is would not be feasible (or at least would be
cost-prohibitive) to separate vehicular traffic from the railroad tracks at S Holgate Street.26 Increased
pedestrian and vehicular crossing associated with the proposed arena will increase pressure to close S
Holgate Street, especially before and after events. This would increase congestion at other crossings and
intersections throughout the SoDo area. Therefore, the arena EIS should determine whether the railroad
crossings of both the mainline and service tracks at S Holgate Street can be managed in a way that is
both safe and provides needed east-west capacity for vehicles and pedestrians. 

25
"Train accident was fourth near ballpark since 2000," Seattle Times article, October 2, 2007. 
26
City of Seattle, Access Duwamish, June 2000.
- 26 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
4.  ANALYSIS THAT THE ARENA NEEDS TO PERFORM 
4.1. What did the other stadium EIS documents evaluate? 
Extensive transportation and parking analyses were performed as part of the EIS documents for the
Kingdome, Safeco Field, CenturyLink Field and Key Arena. The types of analyses performed are summarized
in Table 4. 

















- 27 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
Table 4. Transportation and Parking Analyses in other EISs 
b      c              a
Type of Analysis 
Safeco   Field    Century   Link Field     Key Arena
Documentation of Existing Conditions (Affected Environment) 
Existing street systems                                                  
Existing traffic volumes                                                  
Comparison of event and non-event day traffic volumes                     
Existing intersection operations (level of service)                                  
Existing arterial level of service or travel route analysis                        
Event traffic control review                                          
Site access and circulation                                                
Traffic safety review                                                       
Pedestrian and bicycle facility inventory                                       
Freight movement (train, railyards, trucks, loading)                               
Parking supply inventory and demand counts                                 
Transit service, ferry service and passenger rail                                  
Neighborhood issues                                         
Consumer show operations                                    
Impact Analysis 
Construction traffic and parking impacts                               
Comparative event activity levels                                     
Determination of design day event                                  
Trip generation for multiple operating conditions                                
Intersection operations with multiple operating conditions                         
Arterial or travel route operations with multiple operating conditions            
Circulation and access to parking facilities                                      
Traffic safety analysis                                                       
Pedestrian and bicycle travel                                              
Freight impacts                                                      
Parking impacts                                                    
Transit service, ferry service and passenger rail                                  
Number of sites evaluated                                  4      2     n/a 
Number of intersections evaluated                            31     54     15 
Number of arterial corridors or travel routes evaluated                5      6      -- 
Sources: 
a.    Draft Environmental Impact Statement, Washington State Major League Baseball Stadium Project, Issued by Washington State Major
League Baseball Stadium Public Facilities District, May 29, 1996.
b.    Football / Soccer Stadium and Exhibition Center DEIS, Appendix M-1 (Transportation), The Transpo Group, January 15, 1998. 
c.    Coliseum Renovation, Draft and Final Supplemental Environmental Impact Statement, December 1992. 
n/a  Not applicable since the EIS was only for the renovation of the coliseum.


- 28 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
4.2. What are the flaws of the arena's traffic study? 
As outlined on page one of the Seattle Arena Multimodal Transportation Access and Parking Study,27 
that analysis was not a comprehensive technical analysis and it states that: 
"An expanded transportation and parking impact analysis would be required as part of a more
detailed project review to comply with the State Environmental Policy Act (SEPA). This phase of work
will assess the degree to which the existing and planned transportation and parking infrastructure in
the area would accommodate the new sports arena." 
The Arena Study was very simplistic compared to the EIS analyses that were performed for the Kingdome,
Safeco Field, CenturyLink Field, and Key Arena. Its primary focus was estimating the number of event
days, concurrent event days, and potential trips. The study provided no actual analysis of traffic
operational impacts, safety impacts, transit impacts, parking impacts or freight impacts, nor did the study
recommend any mitigation measures. The Arena Study made several assumptions and drew conclusions
that are flawed, including: 
The Arena Study concluded that POS terminal hours do not coincide with evening events. This is
not true as the Port's tenants do operate night gates on occasion, and will do so more often in
the future as container volumes increase. Port trucks and event attendees travel times were 
detailed in Sections 2.9 and 2.10 above. 
The study implies that since "the majority of event traffic would be on or east of 1st Avenue S.
and the majority of POS operations are moving freight between container terminal and rail
yards, west of 1st Avenue S, POS operations are effectively separated from event traffic." This is
not truefreight traffic does use many streets east of 1st Avenue S and event traffic does use
streets west of 1st Avenue S. More detail is provided below. 
The study assumes that Friday is a weekend, but it is a regular workday for the Port terminals
and other businesses in SoDo, and the impacts that occur on a Friday must be considered as a
weekday impact. 
The Arena Study's parking analysis states that there is enough parking to accommodate even
the dual-event scenario. However, the number of spaces stated in the study reflects the total
supply and not what is actually available for event attendees, nor its dispersed nature or the
impacts of varied pricing. There are many businesses in SoDo, including the Port terminals, for
which employees need nighttime parking for early or late shifts. Event traffic management plans
often remove on-street parking which further exacerbates the parking impact. The study must
consider the true parking impact of dual events. 
The referenced transit capacity will not all be available at the opening projected to occur in 2016, a
point made subtly in the study. Similarly, the East Link's most southerly station would be the
International District, not the Stadium station, noted to be a 2/3 mile distance. While the study
asserts a number of transit seats available after games, how that number is derived is not clear,
given the lack of evening bus and transit operations and the fact that those buses already carry
non-event passengers. Finally, the study has no analysis about the types of improvements needed
along the walking route to these distant transit stations, or whether event patrons could feasibly be
shuttled to the transit stations given the surge after an event. 
27
Parametrix, Inc., May 23, 2012. 
- 29 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 

The Arena Study's assumption that POS operations are all west of 1st Avenue S may be true for most
import containers for which 60% to 70% are "intermodal"destined to travel via rail to the Midwest.
These containers are trucked to the nearby rail yards. However, over half of all export cargomost of
which arrives from Washington State and the Pacific Northwestis trucked to the terminal. This means
that roughly 30% of import containers and 50% of export containers are trucked east of 1st Avenue S.
Some is traveling to or from freight stations throughout the Duwamish (such as MacMillan-Piper, NW
Container, Pacer and PCC Logistics) and some is destined to the highway system, directly accessed via 
Edgar Martinez Drive, Spokane Street or south on East Marginal Way. Further, existing event traffic does
not stay on or east of 1st Avenue S, but frequently uses East Marginal Way, Hanford, Spokane, Atlantic
and other Duwamish routes adding congestion on freight routes. 
4.3. What should be evaluated in an EIS for potential arena? 
Detailed analysis must be performed as part of an Environmental Impact Statement (EIS) to address the
policy, safety, and operational concerns. This study should evaluate viable alternative sites so that the
true impacts of the arena on Port operations can be assessed. 
For the SoDo site, the King County Council's Expert Review Panel issued a report on transportation
issues.28 That report also recommended additional analysis to fill the "chief gaps in the information so
far developed." Those gaps were listed as: 
1.  What will be the effect of the arena proposal on regional transportation corridors, especially I-5
and I-90? 
2.  What will be the effect of arena-related traffic on freight mobility in the SoDo and Duwamish
areaand the significant economic and job interest tied to themboth apart from the Port of
Seattle and including the Port? 
3.  What additional traffic generating features (other land uses) are currently being planned as part
of the arena development? 
4.  What are the likely effects of the proposal on air quality in the SoDo area? 
The EIS analysis should also address the Port of Seattle's additional concerns. These include: 
5.  How will additional events and concurrent events (including professional basketball, professional
hockey, other sporting events, family shows, concerts, graduations, and civic and other
events) affect congestion, travel time and travel time reliability on the Port's primary access
routes? 
6.  How will the vacation of Occidental Avenue S and S Massachusetts Street affect congestion and
travel time on the Port's primary access routes, on both event and non-event days? 
7.  How will changes in land use affect operations in the industrial area, including operations
related to noise, light, and air quality? 

28
Charlie Howard and Doug MacDonald, Undated. Released 7/11, presented to County Council 7/12 
- 30 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 
8.  What is the impact of train blockages on Holgate on the ability of the arena to load/unload both
patrons on foot and those using the proposed garage? How will the resulting congestion impact
the area? 
9.  How will additional arena event-related pedestrian crossings of area railroad tracks be
accommodated and what are the potential impacts to pedestrian safety and rail operations? 
10. What mitigation is needed to maintain acceptable operating conditions along the Port's primary
access routes and to address safety concerns at the railroad crossings? 
Table 5 outlines some of the key transportation analysis measures to address the information gaps.
Because travel time is an important factor in all freight operations, the effect of an action are often
measured in terms of net change in annual vehicle-hours of delay. This has been used to evaluate the
cost-benefit of many infrastructure projects in SoDo, particularly the grade-separation projects such as
SR-519 and Royal Brougham Way. This measure would address the cumulative effect of additional
event days. It is listed as an analysis measure for several key elements. Potential mitigation measures to
consider are also listed. 













- 31 -                               August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 

Table 5. Transportation Analysis Needs for New Arena EIS 
Potential Mitigation if 
Concern                Performance measures to evaluate                              Performance is not acceptable 
A. Effect on regional highways   Net change in peak period and early afternoon travel time related to single event and   Restrictions on concurrent events such as
(I-5 and I-90)                    concurrent event day.                                                   staggered starts or weekends only. 
Net change in annual vehicle hours of delay for base and banner year conditions.      Improved signage to alternative routes 
Variability in delay created by event traffic (a measure of system reliability) 
B. Effect on primary access     Level of service analysis for key intersections in SoDo for the commuter peak hour,    Restrictions on concurrent events such as
routes to Port terminals          pre-event arrival peak, and post-event egress peak. The following should be          staggered starts or weekends only. 
evaluated:                                                      Locate new parking to reduce traffic along the
-- 1st Ave S/S Atlantic St        -- 1st Ave S/S Royal Brougham Wy             Port's primary routes (e.g., garage located east of
-- 1st Ave S/S Mass. St         -- 1st Ave S/S Holgate St                    tracks). 
-- 1st Ave S/S Lander St        -- 1st Ave S/S Spokane St 
-- 4th Ave S/SR-519 Ramps     -- 4th Ave S/I-90 Off-ramp                Event traffic management plans that provide
--4th Ave S/S Holgate Street     --S Atlantic St/SR-99 East Frontage Rd         priority for truck traffic. 
--S Atlantic St/Colorado Ave/Little "h" cluster                             Infrastructure improvements 
Effect that rerouting event traffic to the Spokane Street Viaduct would have on       Parking management measures and technologies
access to Terminals 5 and 18 as well as to the SIG Yard.                       that better allow attendees to find and pay for
Net change in delay related to single-event and concurrent-event day.              parking before events 
Net change in annual vehicle hours of delay for base and banner year conditions.      Pedestrian access and control management
measures that improve safety and traffic flow
Variability in delay created by event traffic (a measure of system reliability)            through key intersections 
C. Effect of street vacations      Peak period and early afternoon level of service analysis for key intersections listed    Same as above 
above to determine Net change in delay without and with the street vacations. 
Net change in annual vehicle hours of delay for base and banner year conditions. 
Variability in delay created by street vacation(s) and event traffic (a measure of
system reliability) 
D. Safety of RR Crossings       Net change in pedestrians and vehicles crossing tracks at S Holgate Street.         Safety enhancements including improved side-
Frequency and duration of train blockages at the at-grade crossings               walks, gates, lights, pedestrian landings and other
features. 
Historic rail-vehicle and rail-pedestrian collisions in SoDo (all crossings)
Active police management before and after events 
Safety analysis of RR crossing 
Alternative east-west vehicle crossing 
Pedestrian storage needs when waiting for a train 
Grade-separated pedestrian crossing 
Effect of additional queues, delays or safety issues on the potential to close S
Holgate Street during events or permanently 

August 7, 2012

Impact of a SoDo Arena on 
Port of Seattle Operations 

[Remove this page from Final PDF report] 



















- 33 -                                   August 7, 2012

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.