ITEM NO : 6a_Supp DATE OF MEETING : December 13, 2011 Project Location East Marginal Way Grade Separation The Project East Marginal Congested Way Intersection N 2 Element I: One lane, southbound, dedicated truck roadway Element II: Minor improvements for enhanced roadway delineations Element III: Automated gate System at UP Argo Yard 3 Project Benefits - Better Freight Mobility! Safer route for harbor truckers Improved safety for general purpose traffic Reduced greenhouse gas emissions and diesel particulates resulting from less truck idling A faster dray route combined with faster gate processing = opportunity for harbor truckers to increase # of drays during a normal shift More drays = more revenue for harbor truckers 4 Port Responsibilities Project Lead for Elements I and II $2,200,000 contribution for Elements I and II Maintenance responsibilities associated with Element I roadway Retention of operational liability for use of Element I roadway 5 Port Funding $2,200,000 for design, permitting and construction of Elements I and II. From Port's Tax Levy Estimated annual maintenance costs = $5,000 / year Seaport Operating Expense 6
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.