6d Memo Building Controls Upgrade Project

COMMISSION 
AGENDA MEMORANDUM                        Item No.          6d 
ACTION ITEM                            Date of Meeting       May 26, 2020 
DATE:     May 15, 2020 
TO:        Stephen P. Metruck, Executive Director 
FROM:    Eileen Francisco, Acting Director Aviation Facilities and Capital Programs 
Wayne Grotheer, Director, Aviation Project Management Group 
SUBJECT:  Building Controls Upgrade  Action Request (CIP #800944) (Short Form) 
Amount of this request:                       $0 
Total estimated project cost:         $10,000,000 
ACTION REQUESTED 
Request Commission authorization for the Executive Director to execute a design contract in
support of the Building Controls Upgrade Project. There is no funding associated with this
request. The project is currently authorized to prepare design and construction bid documents
for $2,950,000. The total estimated project cost is not to exceed $10,000,000. 
SUMMARY 
This request is a technical fix to the action requested previously and has no additional funding
to complete the authorized work. On December 10, 2019, the Commission authorized "the
Executive Director to 1) prepare design and construction bid documents for the Building
Controls Upgrade Project at Seattle-Tacoma International Airport; and (2) use port crews for
preconstruction activities. The amount of this request is $2,950,000 of an estimated total
project cost of $10,000,000."In support of this authorized work, the Port advertised a design
contract  on 2/11/2020. T he  12/10/2019  commission memo  did  not  specifically request
authority for the Executive Director to execute a new design contract for an estimated value of 
$1,000,000. 
The  building  control  system  regulates  and  controls  critical  airport  terminal  building
environmental features such as temperature, humidity, and air exchanges. This project will
replace approximately 100 obsolete building control panels that are installed throughout
concourses B, C, and D. This project will also improve communications and data throughput
allowing for improved system performance and future system expansion. 



Template revised April 12, 2018.

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.