8g Attachment Table 109.3 Clearing & Grading Permit Fees

Item No. 8g_reso_attach2 
Meeting Date: January 26, 2021 
AIRPORT BUILDING DEPARTMENT 
Table 109.3 Clearing & Grading Permit Fees* 
Effective: February 1, 2021 
Total Cubic
Yards            Permit Fees                                   Plan Review Fees 
50 or less                                                                 No Fee 
No Fee $26.00 
51 to 100                                                                 $26.00 
$40.75 
101 to 1,000        $40.75 for the first 100 cubic yards plus $19.25 for   $40.75 
each additional 100 cubic yards or fraction thereof. 
$214.00 for the first 1,000 cubic yards plus $16.00 
1,001 to 10,000     for each additional 1,000 cubic yards or fraction      $54.25 
thereof. 
$358.00 for the first 10,000 cubic yards plus          $54.25 for the first 10,000 cubic yards plus $14.75 
10,001 to
$72.75 for each additional 10,000 cubic yards or      for each additional 10,000 cubic yards or fraction
100,000 
fraction thereof.                                       thereof. 
$1012.75 for the first 100,000 cubic yards plus        $296.75 for the first 100,000 cubic yards plus 
100,001 to
$40.25 for each additional 10,000 cubic yards or      $8.00 for each additional 10,000 cubic yards or
200,000 
fraction thereof.                                       fraction thereof. 
$2012.75 for the first 100,000 cubic yards plus       $442.50 for the first 200,000 cubic yards plus 
200,001 or more    $50.25 for each additional 10,000 cubic yards or     $8.00 for each additional 10,000 cubic yards or
fraction thereof.                                       fraction thereof. 
* Note that a grading permit is needed only when grading or excavation operations are proposed separately or due to project time constraints. However, that
portion of grading associated with a building also requiring a building permit shall be permitted to delete the value of grading from the building permit
valuation. 
PERMITS: The fee for each Grading permit shall be as set forth in the Table above. When plan review is required, an application fee is also due for the
plan review. The cubic yardage is the larger of the total cut or fill for the area to be graded. Clearing only permit fees are based on the construction project
bid amount or valuation from Table 109.2 and calculated in the same manner as building permits. 

Other Inspections and fees: 
1. Inspections outside of normal business hours (min. charge--two hours)                                               $112.50 $55.55 per hour 
2. Reinspection fees assessed under provisions of IBC Section 110.5                                                    $75.00 $55.55 per hour 
3. Inspections for which no fee is specifically indicated (minimum charge--1 hour)                                         $75.00 $55.55 per hour 
4. Additional plan review required by changes, additions, or revisions to approved plans
(min. charge--1 hour)                                                                                          $75.00 $55.55 per hour 










https://portseattle.sharepoint.com/sites/CommMemos/Commission Document Sets/Adoption 2018 Building Code/Attach 3 - Table
109.3 Grading Permit Fee Schedule 2018 IBC 011720.doc

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.