8e. Memo - Building Controls Upgrade
COMMISSION AGENDA MEMORANDUM Item No. 8e ACTION ITEM Date of Meeting August 10, 2021 DATE: August 3, 2021 TO: Stephen P. Metruck, Executive Director FROM: Eileen Francisco, Acting Director, Aviation Facilities and Capital Programs Wayne Grotheer, Director, Aviation Project Management SUBJECT: Building Controls Upgrade (CIP# C800944) - Construction Amount of this request: $6,901,000 Total estimated project cost: $9,901,000 ACTION REQUESTED Request Commission authorization for the Executive Director to (1) advertise, award, and execute a major works construction contract for the Building Controls Upgrade Project at Seattle- Tacoma International Airport, and (2) use Port of Seattle crews for construction activities. The amount of this request is $6,901,000 of an estimated total project cost of $9,901,000. EXECUTIVE SUMMARY The building control system regulates and controls critical airport terminal building environmental features such as temperature, humidity, and air exchanges. In addition, the building control system performs smoke control functions and provides utility metering for water and natural gas use. This project will replace 107 obsolete building control panels that are installed throughout the Seattle-Tacoma International Airport (Airport). The project will also replace the copper data infrastructure with a fiber network expansion to handle the updated panels and system measurements. JUSTIFICATION The panels that will be replaced as part of this project are integral components in the Direct Digital Control (DDC) system throughout the airport. The DDC system was installed circa 1990s and is responsible for monitoring and controlling mechanical equipment at the airport. The equipment includes the Heating, Ventilation, and Air Conditioning (HVAC), chilled water, hot water, and preconditioned air systems and metering of water and natural gas distribution. The existing control panels have reached obsolescence; the components are experiencing intermittent failures and replacement parts are difficult to obtain as they are no longer manufactured. Any operational loss of the control panels has a direct effect on the operation of Template revised January 10, 2019. COMMISSION AGENDA Action Item No. _8e__ Page 2 of 5 Meeting Date: August 10, 2021 the airport and a negative impact to customer experience. Since the installation of the DDC system, there have been significant improvements in control panel technologies that increase the reliability, reduce the size of equipment, and improve the processing capacity. This project will take advantage of the latest technology and give the Port the opportunity to rebalance the panels to provide space for planned future projects. The control panels will be purchased under the sole-source agreement with Siemens 2015-013. The DDC system is connected and controlled on an independent backbone that keeps it isolated from any outside connections. The copper cable sections of the network have reached its performance limitations. During heavy demand periods, the system has increased latency, resulting in slow adjustment to the system needs. At times, if the data transfer requirement exceeds the network capacity, data can be lost, resulting in disruptions of service. This existing copper communications backbone cabling will be upgraded to fiber optic cable allowing for higher data throughput, increased reliability, and future expansion. Diversity in Contracting The project staff, in coordination with the Diversity in Contracting department, have set a ten (10) percent woman- and minority-owned business enterprise (WMBE) aspirational goal for this construction contract. DETAILS This project will replace 107 obsolete control panels that are distributed throughout the Airport. The existing equipment and field control points will remain in place and be migrated to the new panel hardware. As panels are being updated, the whole panel load and spacing will be reviewed, and configured where possible to add capacity for future expansions. A fiber backbone on Concourses B, C and D will be installed in parallel with the existing copper backbone. Planned shutdowns will transition the network off the copper and onto the new fiber backbone. The obsolete copper backbone will be removed. This fiber network expansion will connect the existing fiber on Concourse A and Main Terminal with Concourses B, C, and D. Both the North and South satellites already have fiber runs in place that connect to the DDC system. Scope of Work The scope of work for this project includes: (1) Replacing 107 obsolete control panels. (2) Connecting new control panels to the DDC System. (3) Updating the DDC graphics to match the new panels and data points. (4) Provide wiring, testing, commissioning, and associated equipment for a fully functional system. (5) Install a fiber backbone expansion to connect the new and previously upgraded control panels to the DDC network. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA Action Item No. _8e__ Page 3 of 5 Meeting Date: August 10, 2021 (6) Provide fiber optic wiring, terminations, testing, commissioning, and associated equipment for a fully functional system. Schedule Activity Construction start 2022 Quarter 1 In-use date 2023 Quarter 1 Cost Breakdown This Request Total Project Design $0 $3,000,000 Construction $6,901,000 $6,901,000 Total $6,901,000 $9,901,000 ALTERNATIVES AND IMPLICATIONS CONSIDERED This project is installing the required upgrades and improving the backbone for the system to be ready for future expansions such as increased capacity, smoke control, and greater data collection. Alternative 1 Do not proceed with this project Cost Implications: Approximately $525,000 would need to be expensed Pros: (1) No capital investment required at this time. Cons: (1) Panel failure will have a negative effect on the passenger and tenant experience at the airport. (2) Future projects will be limited on expansion capabilities until the panels and fiber network are replaced. (3) Future projects will be required to replace panels, adding time, complexity, and cost to the scope. (4) Replacing panels on a project-by-project basis will increase the unit cost of the panel replacement. (5) The fiber network will not be extended into Concourses B, C, and D. (6) The issue of intermittent data loss will not be addressed. This is not the recommended alternative. Alternative 2 Replace obsolete control panels and install fiber backbone (as designed) Cost Implications: $9,901,000 Pros: (1) Replaces obsolete equipment and failing control panels. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA Action Item No. _8e__ Page 4 of 5 Meeting Date: August 10, 2021 (2) Extends the fiber network into Concourses B, C, and D. (3) Provides infrastructure for future projects with greater data requirements and future panels. (4) Mitigates existing data capacity issues on the copper backbone. Cons: (1) This is the highest capital investment This is the recommended alternative. FINANCIAL IMPLICATIONS Cost Estimate/Authorization Summary Capital Expense Total COST ESTIMATE Original estimate $4,976,000 $128,000 $5,104,000 Previous changes net $4,903,000 ($7,000) $4,896,000 Art (Transfer to art CIP) ($99,000) ($99,000) Revised estimate $9,780,000 $121,000 $9,901,000 AUTHORIZATION Previous authorizations $2,879,000 $121,000 $3,000,000 Current request for authorization $6,901,000 0 $6,901,000 Total authorizations, including this request $9,780,000 $121,000 $9,901,000 Remaining amount to be authorized $0 $0 $0 Annual Budget Status and Source of Funds This project, CIP C800944, was included in the 2021-2025 capital budget and plan of finance with a budget of $9,879,000. The funding source will be the Airport Development Fund and revenue bonds. The original project request submitted in 2016 only included 49 panels that had reached obsolescence. From that initial request an additional 50 panels have been identified as needing replacement. Additionally, the current copper backbone has now reached its data limitations. The project cost increase is due to the delay in executing the original 2016 project, the increase of 50 additional obsolete panels, and the need for increased data on the backbone. Financial Analysis and Summary Project cost for analysis $10,000,000 Business Unit (BU) Terminal Building Effect on business performance NOI after depreciation will increase due to inclusion of (NOI after depreciation) capital (and operating) costs in airline rate base. Template revised June 27, 2019 (Diversity in Contracting). COMMISSION AGENDA Action Item No. _8e__ Page 5 of 5 Meeting Date: August 10, 2021 IRR/NPV (if relevant) N/A CPE Impact $.03 in 2024 ATTACHMENTS TO THIS REQUEST (1) Presentation slides PREVIOUS COMMISSION ACTIONS OR BRIEFINGS May 15, 2020 The Commission authorized execution of a project specific design contract December 10, 2019 The Commission authorized design Template revised June 27, 2019 (Diversity in Contracting).
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.