10b. Presentation - Widen Arrivals Roadways
Item No. 10b_supp Date of Meeting September 28, 2021 Widen Arrivals Roadways Design Authorization Increase and Contract Amendment Project Scope Scope Items: Provide an additional two lanes for a total of six lanes from S 170th Street into the Departures and Arrivals curbsides and Main Garage Relocation of utility infrastructure systems to support widening Relocate the rental car bus curb to the north Demolish the bridge from Departures drive to the Main Garage Complete seismic retrofit of north portal of Service Tunnel Replacement of power and water utility infrastructure systems that are past their useful life 2 Location Reconfigure from four to five lanes Rental Car Bus Curb Widen from Arrivals Departures Air Cargo four to six lanes S. 170 Drive Drive Road St. th Lane to GTC N Note: Utility corridor included in exhibit, but not included in project scope. Lane to Parking 3 Justification Advance this region as a leading tourism destination and business gateway Original roadway system designed to support overall activity level of 25 million annual passengers (MAP) In 2019 (51.8 MAP) significant roadway congestion and queueing occurred during peak periods With return of airport activity levels congestion and queueing has returned during peak periods Queueing could reach I-5/I-405 interchange regularly during summer months in the near-term 4 Justification Be the greenest and most energy efficient Port in North America Meeting or exceeding agency requirements for storm water Provides basic roadway capacity and access necessary to support ground transportation strategies under evaluation Reduce environmental impact Advance transportation modes and programs to foster social equity and customer choice 5 Current Project Status Completed 30% design Completed State Environmental Policy Act (SEPA) checklist and issued determination of non-significance Requested Airline approval through Majority-In-Interest vote 6 Resolution of Previous Risks Airport Utilities Master Plan Utility Corridor Not included with Widen Arrivals Roadways Project Designing improvements to be forward compatible Utility infrastructure system expansion Not included with Widen Arrivals Roadways Project (outside limits) Replacement of aging utility infrastructure systems Portion included within Widen Arrivals Roadways Project 7 Necessary Scope Changes Overall project budget increased to $79.3 million Previous Budget $50,000,000 Roadway Realignment for future construction $18,000,000 Replace Aged Utility Infrastructure Systems $3,000,000 Operational/Customer Scope Enhancements $3,000,000 Other Construction Costs (traffic control, etc.) $5,300,000 Revised Budget $79,300,000 8 Project Schedule Project will be delivered through two phases: Early Work Bridge Demolition Design Complete: Q4 2021 Construction Start: Q2 2022 In-Use Date: Q3 2022 Main Contract Design Complete: Q4 2022 Construction Start: Q2 2023 In-Use Date: Q4 2025 9 Cone of Certainty We are here 10 Project Risks Risk Description Probability Impact Mitigation Plan Fuel Farm If no further action letter from the DOE, M M Working with Environmental to Monitoring existing wells may have to be relocated at decommission as many wells as Wells an expense to the project. possible. FAA Fiber No impacts anticipated to existing FAA fiber L H Pothole FAA fiber to confirm but will be working around it. location. Tax Rule Project assumed it was eligible for sales tax L M Submitted determination 171 exemption. request to DOR to confirm. Access Fees Port considering access fees and may L M Work though the change require additional scope to support. process if needed. Design Risks Project precedes Commission consideration H M Track projects and assess of SAMP NTP and (if approved) project changes as they develop. design. 11
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.