8e. Attachment - SSAT Domestic Hot Water
Item No. 8e_attach01 Meeting Date: October 12, 2021 September 7, 2021 TO: Steve Metruck, Executive Director FROM: Lance Lyttle, Managing Director, Aviation Tina Soike, Director of Engineering Services SUBJECT: Declaration of Critical Work for SSAT Domestic Hot Water - Revised Seattle-Tacoma International Airport This revised Critical Work Declaration supersedes the Declaration executed on September 1, 2021 with an updated cost estimate. Two hot water tanks provide domestic hot water to the South Satellite. One of the hot water tanks failed at the end of 2020 and is not repairable. The South Satellite is currently running off the remaining hot water tank. Both tanks were installed in 2005, and the second tank is at risk of failure. If the second tank fails, the SSAT will be without hot water for restrooms and Airport Dining and Retail (ADR) spaces. At a minimum the ADR spaces will be required to close, worst case the satellite would shut down until temporary hand washing units are provided for the restrooms. It is critical that this replacement work occur as soon as possible. We are requesting an Authorization for Critical Work per the Delegation of Authority (Section 4.2.3.7). The projected completed the design under a small works project, however, upon re-estimating the design package it became clear that the project could not be completed under the $300k threshold due to the complexity of the project and the increase in cost for materials. Staff reviewed several ways to complete this critical work to find the quickest route to limit the risk of disruption of service at the South Satellite. Scope of this work will include replacement of the existing hot water system with a new hot water system. The intent is to use a Job Order Contract (JOC) contract to complete this work. Approval will allow staff to proceed with the project using a JOC contract to procure long-lead items and start work. Staff anticipates requesting full Commission authorization and ratification (as required by the Delegation of Authority) of this action at the September 28, 2021, Commission Meeting. This project is estimated to cost $1,100,000. (Lance Lyttle, Managing Director, Aviation) (Tina Soike, Director of Engineering Services) (Stephen P. Metruck, Executive Director) Cc: Eileen Francisco AV/CD, Wayne Grotheer AV/PMG, Greg Carey AV/PMG, John Freeman AV/PMG, Jason Olson AV/PMG, Kyle Dilbert CPO, Sandy Kilroy EE&S Declaration of Critical work for SSAT Domestic Hot Water Final Audit Report 2021-09-13 Created: By: Status: Transaction ID: "Declaration of Critical work for SSAT Domestic Hot Water" Hist ory
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.